Project Engineering and Commissioning Check list – Freelance System For more details about how to configure, how/where to check? Please refer getting started manual of related Freelance version. Check-List for System requirement 1. Check Operating system requirement for all component Windows 7 professional/Enterprise Sp1 32/64 bit OPC and Trend server can also be used with (In case of integration with 800xA operation) Windows 2008 Server R1 SP2 32 bit Windows 2008 Server R2 SP1 64 bit 2. Check Security updates are up-to date Can be found in the Solutions Bank TechInfo-Explorer under Control Products and systems/Freelance/System/System Versions-Freelance<Version number>/FIELD ALERT 3. Check Internet Explorer With Windows 7 IE 9/10 supported With Windows 2008 server IE 9 supported 4. Check Microsoft Office ( BDM and Reports requires excel) Office 2010 SP1 32 bit Office 2013 32 bit 5. Check windows user account configuration Installing the Freelance software requires administrator privilege 6. Check Recommended PC equipment For Engineering station : hard disk 500MB for installation/10GB for operation, CPU speed >=2GHz, 3 GB RAM, 10/100Mbit Eth Card For Operator Station : hard disk 500MB for installation/2GB minimum for operation/>=80 GB for archiving (configuration dependent), CPU speed >=3GHz, 3 GB RAM, Graphic card for dual monitor – Matrox Millennium P690, Multi-display fiber-optic remote graphics unit – Matrox Extio2 2208, 10/100Mbit - Eth Card. OPC/Trend Server : hard disk 500MB for installation/10GB for operation, CPU speed >=2GHz, 3 GB RAM, 10/100Mbit Eth Card. 7. Check Control Network Recommended Freelance network and company network is separate? 8. Check IP addresses and subnet mask Status Remarks Recommended IP(IPv4) addresses besides the windows PCs the process stations for time synchronization should be configured to IP address : 172.16.x.y, x=0…15, y=0…255 Subnet mask : 255.255.240.0 9. Network Configuration check Check configured IP addresses are reachable List the PC IP addresses down and run ping test 1,2,3…… Note : Incase ping is not working check firewall settings on destination machine. >Start > Control Panel > System and Security > Administrative Tools > Windows Firewall with Advanced Security > Enable the inbound firewall rules named Files and Printer Sharing(Echo Request – ICMPv4-In) to allow ping request 10. Check Third-party software Adobe Acrobat – PDF reader software is available? Antivirus Program – McAfee VirusScan Enterprise 8.8 patch1 for Windows 7 is tested. Check version? Note: while installation disable antivirus program. FTP Server – Incase file transfer is used setup FTP server Java Installation – Incase controller web browser to be displayed via emulator manager. Java 6 Update 20 or higher is recommended 11. PC Setings Check automatic windows updates must be disabled Check user account control is disabled? Check that firewall is configured to allow the Freelance applications to communicate properly Check power option is configured to High Performance? Check Screen saver is disabled? Check the active background programs are configured? - Exclude ‘<Freelance_Installation_folder>\proj & Tempdirectory of the logged in user’ from background programs access. Check that windows disk defragmenter tool is deactivated? Check Screen resolution for Freelance Operation(DigiVis) PC - For new-design interface : select resolution 1280x1024 pixel(minimum vertical height should be 1024 pixels) - For conventional-design interface : select resolution 1024x768 pixel(Vertical height should be less than 1024 pixels) Check for digivis Windows 7 Basic theme is set Check windows taskbar is disabled Check in production mode windows key at the keyboard is disabled via configure tool. Checklist before starting the setup Installation Status Remarks Status Remarks 1. Current authorization key file available? 2. Is the USB harkey installed at the USB port ? 3. Is an administrative user with password ready to be used as operator? 4. Is the antivirus program is disabled before starting the freelance setup ? 5. In case you are a use of an earlier Freelance version, - have you backed up your existing project? - Are all changed or modified parameters stored in the project files? - Are all function block parameters in the project files documented? - Have all project files been exported from the existing version of control builder F version Checklist after Installation of Freelance setup 1. Check Freelance installation via Freelance Check tool, goto about menu and check installed item 2. Check windows firewall rules > under firewall advanced settings > Inbound Rules > several entries start with ‘Freelance’ 3. Enable antivirus and background tools if required Configuring the software: 1. Check project elements such as Process station, operator station, gateway station, OPC server are configured 2. Check user-defined functions are organized under USRTask 3. Check whether the USRTask cycletime, priority are configured as per the requirement 4. Check required PL programs and SFC programs are specified below each task 5. Check the necessary variables and tags are created with correct data type 6. Field variables are mapped to HW IO channels 7. Global variables are enabled ‘Y’ in ‘X-Exported’ column in variable list 8. All valid variables are allocated to resource and clear unused/unallocated variables. 9. Ensure the function blocks parameters are configured according to the requirement 10. Check the mandatory fields(red background in parameter window) are correctly configured 11. check the project tree for plausibility (project -> Check all) for errors Status Remarks Configuring the hardware 1. Check the hardware configuration is done in CBF as per the physical setup 2. Check the resource allocation is done correctly for each resource 3. Check the IP address configuration of all resources as per the network plan is configured in "Network configuration" 4. Ensure unique resource ID is specified for each resources in "Network configuration" 5. Validate the hardware configuration for plausibility check 6. While inserting S800 remote I/O module via GSD module position needs to be set manually according to physical location, check module position is set in module parameter > user tab ? 7. Controller boot parameters set accordingly - Memory - System Limits - Task 8. Incase of using device DTM and importing hw tree, Check instantiated device DTM’s are installed on PC ? 9. Incase of Foundation fieldbus required capabilities files are imported in libraries? Status Remarks Configuring an operator station 1. 2. 3. 4. 5. 6. 7. 8. Status Remarks Status Remarks Check Digivis is installed on the system Check the operator station is added under project tree check the resource allocation is done for OS Ensure IP address and unique resource ID specified for OS in Network configuration Validate the configuration for plausibility check Ensure all required objects under OS are configured such as Graphic displays, trend displays etc. Check DigiVis station is downloaded from CBF station? For correct timestamp in trend, logs and report check time-synchronization is enabled? and time is synchronized Configuring an time-synchronization 1. Check All PC’s and controllers are on 255.255.240.0 subnet. Check installation checklist 2. Time-synchronization is enabled via configure tool? 3. System time is set via CBF in commissioning mode? 4. Check CBF, DigiVis and controller shows same time? 5. Incase external time master – external time master is configured under Gateway resource? Commissioning Process station 1. Check project is free of any errors 2. On entering into commissioning mode, check process station status is getting updated in Project tree 3. If "No operating system" is displayed check again for the previous steps 4. If "Version error" is displayed, load the program and check for any errors during download. 5. Check Load operation completed successfully by its state("Running" will be displayed) 6. Also check in Project tree all project objects are appearing green while "Running" state 7. Test the application for online values. 8. Simulate or use physical IOs to test functionality of application. 9. Check Controller and communication modules are loaded with correct firmware. Status Remarks Commissioning the operator station 1. Check project is free of errors 2. Ensure Digivis application is started in the corresponding operator station 3. On entering into commissioning mode, check operator station is getting updated in Project tree 4. If "No connection" is displayed check the configuration steps again for any errors 5. If "Version error" is displayed, load the program to the operator station 6. Check for any errors during downloading and check if 'Running" state is displayed on successful loading 7. Test the functionality of Operator station as per your configuration Status Remarks Configuration of OPC server 1. Ensure OPC server is added under the Project tree 2. Check Name and Location is entered correctly, where the OPC server is running Status Remarks Configuration of Modbus communication 1. Ensure necessary hardware and cabling are done as per the requirement (Refer M&I steps) 2. Check the modbus function blocks are configured correctly in parameter window 3. Download and check the functionality Status Remarks Check-List for Mounting & Installation 1. Ensure Minimum spacing above and below AC 800F is 150 mm 2. Maximum temperature at the AC 800F bottom side (air intake):60 °C 3. Ensure controller is provided with a functional grounding 4. Is a buffer battery installed in the Ethernet module with right polarity 5. Did you observe the max. number of nodes (transmitters/receivers/repeaters) 6. Is the appropriate Profibus connector used 7. Is the appropriate Profibus cable used (characteristic impedance, capacity) 8. Does the Profibus cable have the appropriate crosssectional area 9. Was the cable connected properly to the terminal block? Was it tested? 10. Is the cable terminated properly at both cable ends? 11. Has the Profibus cable the appropriate length (max. length observed?) related to the desired transmission rate? 12. With redundancy, is the connection suitable for Redundancy Link Module (RLM) 13. With RS232C, only: Is the max. cable length of 15 m observed? 14. Is the appropriate cable used (with sufficient wire CSA, shielded)? 15. Were all connector pins not assigned to RS232C left free? 16. With redundancy, Is the connection between the terminal blocks correct? 17. With RS485, only - Did you select either internal or external termination? 18. With internal termination: Is the termination active, if the module is located at the end of the bus? 19. With external termination: a) Were both cable ends terminated properly? b) Is the internal termination disabled? c) Is a 1kΩ pull-up, 100Ω and 1kΩ pull-down resistance circuitry used as the external termination? d) Is an external 5-V power supply provided for external termination? e) Were all connector pins not assigned to RS485 left free? Status Remarks f) Is the appropriate cable used (sufficient wire CSA, shielded)? g) Is the connector shield applied properly to terminal P? 20. Is/are the IP address (es) set properly, depending on the mode (standard case, special case or redundancy case) as per the network plan? Configuring the Boot Loader: 1. Were the internet addresses set properly (only required in special case)? 2. Were the subnet addresses set properly? 3. Did you select the proper network type? 4. Do you know the IP address of the default router? Did you set it correctly? 5. Did you set the reaction on operating system boot as desired? 6. Did you select the extended selftest setting and the waiting time for the configuration mode as required? 7. Did you <Save> the settings? 8. Did you set the time correctly? Status Remarks