Download Feeder Capacity for Distributed Generator Connections

Survey
yes no Was this document useful for you?
   Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Document related concepts

Ground (electricity) wikipedia , lookup

Resistive opto-isolator wikipedia , lookup

Variable-frequency drive wikipedia , lookup

Rectifier wikipedia , lookup

Electrification wikipedia , lookup

Stray voltage wikipedia , lookup

History of electric power transmission wikipedia , lookup

Buck converter wikipedia , lookup

Islanding wikipedia , lookup

Electrical substation wikipedia , lookup

Opto-isolator wikipedia , lookup

Three-phase electric power wikipedia , lookup

Voltage regulator wikipedia , lookup

Power engineering wikipedia , lookup

Last mile wikipedia , lookup

Amtrak's 25 Hz traction power system wikipedia , lookup

Metadyne wikipedia , lookup

Switched-mode power supply wikipedia , lookup

Alternating current wikipedia , lookup

Voltage optimisation wikipedia , lookup

Mains electricity wikipedia , lookup

Transcript
Feeder Capacity for Distributed Generator
Connections
Hydro One Networks is committed to working with all generation proponents to ensure assessments of
their proposals and integration of projects into the distribution system are done in a timely, consistent
and fair manner. Processes may be amended as required to accommodate changing circumstances,
including Ontario Energy Board and Ontario Power Authority direction.
A Distribution feeder's capacity for new generation has two components:
The first component is an upper limit based on system operability, and depends on system voltage.
These limits are found in Hydro One’s Technical Interconnection Requirements (TIR R3) document.
The second component is a result of recent experience of unacceptable feeder voltage regulation and
power quality issues when there is a large amount of generation connected at a distance from the
supply station.
A feeder’s capacity limitation, for all sections of a feeder, is based on the conductor size, voltage of the
feeder, system strength and distance from the Hydro One supply station to the Generator’s Point of
Common Coupling (PCC). The feeder limitation applies to all Distributed Generators connected or
connecting to the feeder, and considers the rated output capacity of each Distributed Generator. Any
single Distributed Generator connection and its specific point of connection can affect the capacity
available for all sections of the feeder.
The feeder limitation allocates available capacity for each section of the feeder and adjusts this
available capacity based on the impact of other Distributed Generators connected or connecting to the
feeder.
Note: OPA FIT applications received after Feb 8, 2010 must pass the distance limitation criteria
during the Distribution Availability Test.
P-V Profile for Generation Connections on Long
Feeders
As illustrated above, with a significant amount of generation at the end of a feeder, a slight variation in
generation output will result in a significant variation in voltage.