Download Fill out the form electronically

Survey
yes no Was this document useful for you?
   Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Document related concepts

Opto-isolator wikipedia , lookup

Flexible electronics wikipedia , lookup

Distributed generation wikipedia , lookup

Integrated circuit wikipedia , lookup

Life-cycle greenhouse-gas emissions of energy sources wikipedia , lookup

Solar micro-inverter wikipedia , lookup

Transcript
ISI Energy Controls
ELECTRICIAN SITE SURVEY FORM
CRITICAL NOTE TO THE ELECTRICIAN – MUST READ PRIOR TO AUDIT
You are performing this audit for your client who is interested in purchasing the “Energy Avenger Series” from
Integrated System International Energy Controls (ISI). This equipment is an energy efficiency control device that
will be connected to the control panel running these lights. The Energy Avenger Series will save KWH demand and
billable energy on HID lights (ONLY) connected to this panel. An incomplete or incorrect audit form will result in
the wrong size product being ordered, which will not perform as intended. Incorrect electrical measurements
will result in a replacement having to be reinstalled and may be at your cost.
At the end of the audit please download or copy this information onto our on line audit form attached and send to
ISI Energy. Within a 3-5 day period of audit completion we will reply to your ISI Representative with the proper
size Energy Avenger Series unit.
Please be sure you have entered ALL the correct HID affected data into this audit, also double check as you will be
required to sign off on this audit for your client prior to the order. Should you have questions please contact your
local ISI Representative, the ISI Technical Service Department, or our online help FAQ section at
www.energyx3.com or www.isienergycontrols.net.
NOTE: HID electronic ballasts are not suitable for treatment by the Energy Avenger
Please fax form or email to Kevin Wood at [email protected]
Thank you in advance for the accuracy of this information.
Distributor: Energy Exchange Enterprises, 1131 Poplar Street, Helena, MT, 59602 PH: 406-439-9155
www.energyx3.com
4 Pleasant Street South Suite 300 Natick, MA 0176 Ph: 888-474-4701 Fax: 508-319-3008
www.isienergycontrols.com
1
NOTE: This audit form is created to help understand what electrically exists that
involves HID lighting in the property. Below, please fill out all blanks as possible
as it relates to this site survey.
Project Name: ___________________________ Panel Designation: ___________________________
Date: __________________________
Agent Name: ___________________________
Customer Contact Name: ___________________________
Contact Phone: ___________________________
Fax: ___________________________
Contact e-mail: ___________________________
NOTE: Existing electrical panel information with HID circuits.
Make and Style of existing panel: ___________________________
Panel Poles: ___________________________
Panel Amp Size: ___________________________
MLO? __________________________________
Main Beaker? ______________________________
KAIC Rating? __________________________
If Main Breaker, what size? _________________________
Existing Panel Phases: ______________________________ Panel Voltage: ________________________
What size is the feeder for this panel? __________________________ Ground size? __________________________
Does this panel have a neutral? __________________________ What size? ________________________
Is this existing electric panel an HID dedicated circuit panel? _________________________________
What type of controls exist that turn on and off the existing HID lights? (check all that apply)
_____ Manual
_____ Automatic
_____ Photocell
_____ Time Clock
_____ BMS
What is the voltage of these controls? _________________________________
Days of operation: _________________________________ Hours of operation: _________________________________
NOTE: If a sub-panel is required due to existing panel having mixed
circuits and these circuits have to be relocated to this treated sub-panel, please
fill out the following questions.
Distributor: Energy Exchange Enterprises, 1131 Poplar Street, Helena, MT, 59602 PH: 406-439-9155
www.energyx3.com
4 Pleasant Street South Suite 300 Natick, MA 0176 Ph: 888-474-4701 Fax: 508-319-3008
www.isienergycontrols.com
2
NOTE:
If the existing electric panel is a dedicated HID circuit panel that
feeds only MH and HPS fixtures, the following questions are not required.
New sub-panel install location
What is the distance from the existing panel to the new lower voltage sub-panel? _____ ft
How many existing circuits are involved in relocation to new sub-panel? ________ circuits
What is the construction of the wall/floor where the unit will be mounted?
Choose an item.
Is there a separate emergency light? Choose an item.
Panel # and where? _______________________________________________________________________
Other comments: __________________________________________________________________________
Utility Information
Name of Energy Utility Provider: _________________________________
KWH Rate: _______________________
Demand Charge if any: _________________________
Fixture - lamp warm-up time
How long in time does it take for the lighting load to reach maximum amps?
Minutes: _________________________________
Take pictures of all four walls around the gear room showing the proposed location of the new subpanel and energy saving unit.
Distributor: Energy Exchange Enterprises, 1131 Poplar Street, Helena, MT, 59602 PH: 406-439-9155
www.energyx3.com
4 Pleasant Street South Suite 300 Natick, MA 0176 Ph: 888-474-4701 Fax: 508-319-3008
www.isienergycontrols.com
3
What types of fixtures (working and out) are present and what type of lamps do they have?
(Example: 50-1000W Metal Halide)
Total # of Lamps (working & out)
Wattage
Description
# of Lamps (out)
Wattage
Description
What type are the existing ballasts if known? Choose an item.
NOTE: HID systems with electronic ballasts are not suitable for treatment by the Energy Avenger!
ADDITIONAL REQUIREMENTS:
Choose an item.
NOTE: Fill out the attached panel schedule. Each dedicated HID circuit must be read by
an amprobe meter after twenty minutes of burn time for each circuit.
The circuit readings must be accurate with phase identification and circuit numbers.
Auditors must turn on each circuit and identify fixtures that are being probed. Count
fixtures that are on that circuit then make sure that each of the fixtures are off when the
circuit is turned off.
Distributor: Energy Exchange Enterprises, 1131 Poplar Street, Helena, MT, 59602 PH: 406-439-9155
www.energyx3.com
4 Pleasant Street South Suite 300 Natick, MA 0176 Ph: 888-474-4701 Fax: 508-319-3008
www.isienergycontrols.com
4
PANEL SCHEDULE
Complete with Total Amps Per Phase
(HID Lighting Circuits Only)
Panel ID Information: ______________________________________________________________.
Circuit#
1
3
5
7
9
11
13
15
17
19
21
23
25
27
29
31
33
35
37
39
41
Circuit I.D.
Phase
Circuit#
AMPS
1
3
5
7
9
11
13
15
17
19
21
23
25
27
29
31
33
35
37
39
41
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
Circuit I.D.
Phase
AMPS
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
RECORD
Actual load amps per phase (full panel/all circuits)
AǾ: _____________ BǾ: _____________ CǾ: _____________ Neutral: _____________
Maximum amps per phase (HID lighting only), calculation from panel schedule with listed load for each
dedicated circuit.
Distributor: Energy Exchange Enterprises, 1131 Poplar Street, Helena, MT, 59602 PH: 406-439-9155
www.energyx3.com
4 Pleasant Street South Suite 300 Natick, MA 0176 Ph: 888-474-4701 Fax: 508-319-3008
www.isienergycontrols.com
5
AǾ: _____________ BǾ: _____________ CǾ: _____________ Neutral: _____________
Distributor: Energy Exchange Enterprises, 1131 Poplar Street, Helena, MT, 59602 PH: 406-439-9155
www.energyx3.com
4 Pleasant Street South Suite 300 Natick, MA 0176 Ph: 888-474-4701 Fax: 508-319-3008
www.isienergycontrols.com
6