* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Download Fill out the form electronically
Survey
Document related concepts
Transcript
ISI Energy Controls ELECTRICIAN SITE SURVEY FORM CRITICAL NOTE TO THE ELECTRICIAN – MUST READ PRIOR TO AUDIT You are performing this audit for your client who is interested in purchasing the “Energy Avenger Series” from Integrated System International Energy Controls (ISI). This equipment is an energy efficiency control device that will be connected to the control panel running these lights. The Energy Avenger Series will save KWH demand and billable energy on HID lights (ONLY) connected to this panel. An incomplete or incorrect audit form will result in the wrong size product being ordered, which will not perform as intended. Incorrect electrical measurements will result in a replacement having to be reinstalled and may be at your cost. At the end of the audit please download or copy this information onto our on line audit form attached and send to ISI Energy. Within a 3-5 day period of audit completion we will reply to your ISI Representative with the proper size Energy Avenger Series unit. Please be sure you have entered ALL the correct HID affected data into this audit, also double check as you will be required to sign off on this audit for your client prior to the order. Should you have questions please contact your local ISI Representative, the ISI Technical Service Department, or our online help FAQ section at www.energyx3.com or www.isienergycontrols.net. NOTE: HID electronic ballasts are not suitable for treatment by the Energy Avenger Please fax form or email to Kevin Wood at [email protected] Thank you in advance for the accuracy of this information. Distributor: Energy Exchange Enterprises, 1131 Poplar Street, Helena, MT, 59602 PH: 406-439-9155 www.energyx3.com 4 Pleasant Street South Suite 300 Natick, MA 0176 Ph: 888-474-4701 Fax: 508-319-3008 www.isienergycontrols.com 1 NOTE: This audit form is created to help understand what electrically exists that involves HID lighting in the property. Below, please fill out all blanks as possible as it relates to this site survey. Project Name: ___________________________ Panel Designation: ___________________________ Date: __________________________ Agent Name: ___________________________ Customer Contact Name: ___________________________ Contact Phone: ___________________________ Fax: ___________________________ Contact e-mail: ___________________________ NOTE: Existing electrical panel information with HID circuits. Make and Style of existing panel: ___________________________ Panel Poles: ___________________________ Panel Amp Size: ___________________________ MLO? __________________________________ Main Beaker? ______________________________ KAIC Rating? __________________________ If Main Breaker, what size? _________________________ Existing Panel Phases: ______________________________ Panel Voltage: ________________________ What size is the feeder for this panel? __________________________ Ground size? __________________________ Does this panel have a neutral? __________________________ What size? ________________________ Is this existing electric panel an HID dedicated circuit panel? _________________________________ What type of controls exist that turn on and off the existing HID lights? (check all that apply) _____ Manual _____ Automatic _____ Photocell _____ Time Clock _____ BMS What is the voltage of these controls? _________________________________ Days of operation: _________________________________ Hours of operation: _________________________________ NOTE: If a sub-panel is required due to existing panel having mixed circuits and these circuits have to be relocated to this treated sub-panel, please fill out the following questions. Distributor: Energy Exchange Enterprises, 1131 Poplar Street, Helena, MT, 59602 PH: 406-439-9155 www.energyx3.com 4 Pleasant Street South Suite 300 Natick, MA 0176 Ph: 888-474-4701 Fax: 508-319-3008 www.isienergycontrols.com 2 NOTE: If the existing electric panel is a dedicated HID circuit panel that feeds only MH and HPS fixtures, the following questions are not required. New sub-panel install location What is the distance from the existing panel to the new lower voltage sub-panel? _____ ft How many existing circuits are involved in relocation to new sub-panel? ________ circuits What is the construction of the wall/floor where the unit will be mounted? Choose an item. Is there a separate emergency light? Choose an item. Panel # and where? _______________________________________________________________________ Other comments: __________________________________________________________________________ Utility Information Name of Energy Utility Provider: _________________________________ KWH Rate: _______________________ Demand Charge if any: _________________________ Fixture - lamp warm-up time How long in time does it take for the lighting load to reach maximum amps? Minutes: _________________________________ Take pictures of all four walls around the gear room showing the proposed location of the new subpanel and energy saving unit. Distributor: Energy Exchange Enterprises, 1131 Poplar Street, Helena, MT, 59602 PH: 406-439-9155 www.energyx3.com 4 Pleasant Street South Suite 300 Natick, MA 0176 Ph: 888-474-4701 Fax: 508-319-3008 www.isienergycontrols.com 3 What types of fixtures (working and out) are present and what type of lamps do they have? (Example: 50-1000W Metal Halide) Total # of Lamps (working & out) Wattage Description # of Lamps (out) Wattage Description What type are the existing ballasts if known? Choose an item. NOTE: HID systems with electronic ballasts are not suitable for treatment by the Energy Avenger! ADDITIONAL REQUIREMENTS: Choose an item. NOTE: Fill out the attached panel schedule. Each dedicated HID circuit must be read by an amprobe meter after twenty minutes of burn time for each circuit. The circuit readings must be accurate with phase identification and circuit numbers. Auditors must turn on each circuit and identify fixtures that are being probed. Count fixtures that are on that circuit then make sure that each of the fixtures are off when the circuit is turned off. Distributor: Energy Exchange Enterprises, 1131 Poplar Street, Helena, MT, 59602 PH: 406-439-9155 www.energyx3.com 4 Pleasant Street South Suite 300 Natick, MA 0176 Ph: 888-474-4701 Fax: 508-319-3008 www.isienergycontrols.com 4 PANEL SCHEDULE Complete with Total Amps Per Phase (HID Lighting Circuits Only) Panel ID Information: ______________________________________________________________. Circuit# 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 Circuit I.D. Phase Circuit# AMPS 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 A B C A B C A B C A B C A B C A B C A B C Circuit I.D. Phase AMPS A B C A B C A B C A B C A B C A B C A B C RECORD Actual load amps per phase (full panel/all circuits) AǾ: _____________ BǾ: _____________ CǾ: _____________ Neutral: _____________ Maximum amps per phase (HID lighting only), calculation from panel schedule with listed load for each dedicated circuit. Distributor: Energy Exchange Enterprises, 1131 Poplar Street, Helena, MT, 59602 PH: 406-439-9155 www.energyx3.com 4 Pleasant Street South Suite 300 Natick, MA 0176 Ph: 888-474-4701 Fax: 508-319-3008 www.isienergycontrols.com 5 AǾ: _____________ BǾ: _____________ CǾ: _____________ Neutral: _____________ Distributor: Energy Exchange Enterprises, 1131 Poplar Street, Helena, MT, 59602 PH: 406-439-9155 www.energyx3.com 4 Pleasant Street South Suite 300 Natick, MA 0176 Ph: 888-474-4701 Fax: 508-319-3008 www.isienergycontrols.com 6