Download Attachment 3

Survey
yes no Was this document useful for you?
   Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Document related concepts

Current source wikipedia , lookup

History of electric power transmission wikipedia , lookup

Resistive opto-isolator wikipedia , lookup

Islanding wikipedia , lookup

Rectifier wikipedia , lookup

Three-phase electric power wikipedia , lookup

Power over Ethernet wikipedia , lookup

Variable-frequency drive wikipedia , lookup

Buck converter wikipedia , lookup

Switched-mode power supply wikipedia , lookup

Sound level meter wikipedia , lookup

Mercury-arc valve wikipedia , lookup

Rectiverter wikipedia , lookup

Power MOSFET wikipedia , lookup

Circuit breaker wikipedia , lookup

Electrical substation wikipedia , lookup

Stray voltage wikipedia , lookup

Distribution management system wikipedia , lookup

Alternating current wikipedia , lookup

Voltage optimisation wikipedia , lookup

Surge protector wikipedia , lookup

Mains electricity wikipedia , lookup

Electrical wiring in the United Kingdom wikipedia , lookup

Opto-isolator wikipedia , lookup

Transcript
Minutes of TRV Working Group Meeting – 3 May 2004
PAGE 1
TRV WG – Revision of C37.04, .09, …- Meeting - 3 May 2004
The TRV working group met on Monday 4 May 2004 with about 20 members and
about 20 guests.
A.
The chairman, Kirk Smith, presented an overview of TRV changes agreed
to already. These include the following features in common with IEC for circuit
breakers at 100 kV and above.
- The 2-parameter TRV envelope description will replace the 1-cosine
envelope at all voltages. The 4-parameter TRV envelope description will
replace the exponential–cosine envelope at 100 kV and above.
- The rates of rise will be 2, 3, 5 and 7 kV/usec at T100, T60, T30 and T10
respectively
- The TRV magnitudes for most applications will be based on a Kpp=1.3
- The TRV magnitudes for special applications will be based on a Kpp=1.5
B.
The chairman then presented a review of the TRV peak calculations using
the expression
Uc = sqrt(2/3) x Kpp x Kaf x Ur
The values of Uc at currents less than rated in general are higher. In IEEE, these
increases were accomplished by a set of Kaf multipliers while keeping the Kpp
the same. In IEC, both Kpp and Kaf are changed. The original harmonized
proposal at T30 and T10 recommended some compromise values of Kaf
multipliers resulting in peaks that were in between the IEC and IEEE. The
decision at the wg meeting in Portland was to chose the higher of the two values
instead. A review of the implications of this decision was presented as shown in
Figure X5 below. This change was agreed to and will be included in the next draft
of the proposed revisions.
FIGURE X5
ANSI E2 Multipliers vs
Short Circuit Current
ANSI 2004 Proposed, Kpp=1.5 & 1.3, Kaf=1.4
ANSI 1999, Kpp=1.5, Kaf=1.4
ANSI 1999, Kpp=1.3, Kaf=1.4
ANSI 2004 Proposed, Kpp=1.5, Kaf=1.4
E2 Multiplier
2.0
1.5
1.0
E2 Mult = Sqrt (2/3) x Kpp x Kaf
E2 Mult = Constant x Kpp x Kaf
with Kaf's in C37.06
Straight Line at Kpp = 1.5
Broken Line at Kpp = 1.3
0.5
0.0
0
20
40
60
Percent of Rated Isc
80
100
Minutes of TRV Working Group Meeting – 3 May 2004
PAGE 2
C.
Comments were received from Denis Dufournet on Draft 6. These were
reviewed and some changes agreed to.
D.
Changes to the medium voltage TRVs for line and cable connected
applications were agreed to in the C37.06 working group meeting.
E.
A draft of TRV changes to C37.09 has been begun. A PAR will be written
to authorize this work.
F.
Question: Does the approve PAR cover TRV revision work fro Medium
Voltages as well?
Answer: The PAR is broad enough to include the MV TRVs as indicated below.
The PAR for revisions to C37.04 for TRV is up in December 2004.
PC37.04b Amendment to “IEEE Standard for Rating Structure for AC HighVoltage Circuit Breakers Rated on a Symmetrical Current Basis” to change the
description of Transient Recovery Voltage for harmonization with IEC 60056
9. Scope of Proposed Project:
[The Circuit Breaker rating structure is being revised to make the voltage / time envelope
that describes the Transient Recovery Voltage (TRV) match the description used in IEC
60056. The present IEEE TRV envelope is a combination of an initial exponential
component with a 1-cosine component at higher currents and a 1-cosine at lower currents.
This will be changed respectively to the 4 parameter or 2 parameter TRV envelope used
in IEC 60056. This change will make the TRV descriptions the same as those used in the
international standard that is applicable to the same type of equipment.]
10. Purpose of Proposed Project:
[This change is being done to harmonize the IEEE standards with the IEC standards that
are applicable to the same equipment used in the same power system environment. This
change will benefit all parties concerned. The manufacturers will benefit since one set of
tests will be applicable to both standards. The users will benefit since a consistent method
of application can be employed.]
The intention is to ballot the TRV changes to C37.04, .06, .09 and .011 together
and to get the ballot out by the end of the summer.
The plan is to proceed as follows
1.
C37.04b
1.1 Prepare a Draft 07 of C37.04b with the changes agreed to from the
discussion of Denis Dufournet’s comments and the use of Uc at T10
based on Kpp = 1.5 and the decision about the 2 medium voltage TRVs
for line and cable connected applications
1.2 Send out a draft D07 in the next week and ask for comments from the
working group by the end of May 2004.
1.3 Prepare a compilation of comments by June 15 with comments by the
chair and send out to the working group.
1.4 Resolve changes by decision of chair or teleconference if required.
1.5 Prepare draft 08 of C37.04b for balloting based on these comments.
Minutes of TRV Working Group Meeting – 3 May 2004
2.
3.
PAGE 3
C37.09b
2.1 Submit PAR for C37.09b for TRV – request accelerated approval process
2.2 Prepare draft of C37.09b D01 and send out to working group for comment
2.3 Prepare compilation of comments on C37.09b D01
2.4 Resolve changes by decision of chair or teleconference if required.
2.5 Prepare draft of C37.09b D02
Request formation of a ballot pool for C37.04b and C37.09b – use online
process in IEEE. Ask Georges and Denis to request balloting pool
formation for C37.06b and C37.011