Survey
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
DG DemoNet Smart LV Grid Increasing the DER Hosting Capacity of Distribution Networks Voltage Control from Simulation to Field Test Die Evolution der Elektrizitätsnetze – ein Status Quo 17.04.2012, Hilton Vienna Stadtpark Helfried Brunner Deputy Head Electric Energy System Energy Department Austrian Institute of Technology Austrian Institute of Technology 2 AIT Austrian Institute of Technology 3 Guiding radical innovation Position of AIT Radical Innovations passive active static systems dynamic systems local urban wide implementation single technologies integrated approach (planning and management) 4 AIT Energy Department 5 Project DG DemoNet Smart LV Grid 6 Objectives Increase the hosting capacity of LV networks based on: 1. Intelligent planning new planning methods enabling higher DER densities 2. Intelligent monitoring new monitoring solutions for grid planning and operation 3. Active management and control using communication infrastructures restricted in bandwidth and availability new and cost-effective active control solution approach 7 Overview • • Applicant Partner Austrian Institute of Technology Siemens AG Österreich Fronius International GmbH Energie AG Oberösterreich Netz GmbH Salzburg Netz GmbH Linz Strom Netz GmbH BEWAG Netz GmbH TU Wien – EEG + Institut für Computertechnik • Project Type Industrial Research (IF) • • • Project Costs Requested Grant Additional funding ca. 3,2 Mio € (Total Costs >4.5 Mio €) ca. 2,2 Mio € Land Oberösterreich: 1 Mio € Land Salzburg: up to 0,3 Mio € • Project run time 36 months, Start 03/2011 8 Approach 9 System Architecture MVN LV Grid Controller / DC LVN LVN Loop SM AGW AGW LS INV ~ = CS DC AGW SM LSD CS INV NVN MVN Data Concentrator AMIS Gateway Smart Meter Load Switch Charging Station PV Inverter Low Voltage Network Medium Voltage Network Local control loop 10 Related Projects ISOLVES:PSSA-M Project Chain DG DemoNet Detailed characterisation and modelling of LV networks Data and basis for network simulations Network models (4 wire, unbalance…) MetaPV and MorePV2Grid Design and field test of voltage control concepts for medium voltage networks with high share of distributed generation Local voltage control (droop control) concepts for PV inverter in areas with high share of PV DG DemoNet – Smart LV Grid smart planning, monitoring, management and control approaches for the system integration of local energy production and flexible loads (e.g. heat, e-mobility) in low voltage networks Fenix, ZUQDE Centralized control concepts for HV/MV networks; state estimation in MV networks – load modeling Vehicle2Grid Strategies Simulation of e-mobility integration in MV and LV networks and analyses of the influence Consumer2Grid, Building2Grid Costumer integration and participation OPEN NODE Development of an ICT hardware (bases for future functionalities) for intelligent secondary substations 11 DG DemoNet Smart LV Grid – Field Tests Smart LV Grid Concepts Smart planning, monitoring, control approaches Photovoltaic on every 2nd roof Field test area e-vehicels Low voltage grid section in every 2nd garage validation of solutions for future problems 12 Field test regions and focus • Oberösterreich: Energie AG OÖ Netz GmbH – Use case "smart sensing and coordinated generation control“ - testing of the control- and monitoring solutions in a grid with high penetration of PV based on smart metering communication infrastructure – Eberstalzell (in Upper Austria): appr. 70 PV units in total appr. 400 kW 13 Field test regions and focus • Salzburg: Salzburg Netz GmbH – Use case "smart sensoring and coordinated load control“ examination of effectivity of the control- and monitoring solutions in a grid with high penetration of PV linked with a high penetration of electric vehicles – Köstendorf (in Salzburg): appr. 35 PV units in total appr. 125 kW and appr. 30 e-vehicles with home charging stations 14 Field test regions and focus • Oberösterreich: Linz AG – Use case "intelligent planning and smart monitoring“ - verification of the probabilistic planning method by measurements in a grid with high penetration of PV – network area is not selected yet (2 candidates close to Linz): appr. 15 PV units in total appr. 70 kW 15 First Results • 2 Field test regions selected – Köstendorf in Salzburg – Eberstalzell in Upper Austria – 2 potential LV network areas close to Linz (under discussion) • Overall control concept and system architecture finalized • Co-Simulation of communication network and power network as development environment is tested • Next steps: – PV and e-mobility Roll-Out in the field test regions – Clarifying and definition of all necessary communication interfaces – Detailed designed of the control concepts 16 Cost Allocation • Smart Metering Infrastructure (PLC vs. IP based) – – – – – – Power Line Carrier (PLC) Technology Transactions Server Data Concentrator Load Switch AMIS Gateway Additional Functionalities (for network monitoring) • • • • • Low Voltage Grid Controller (LVGC) OLTC Secondary Substation Transformer (Prototype) PV Inverters Charging Stations Communication Interfaces (LVGC, Transformer, Inverter, Charging Station…) • Costs for additional space (e.g. OLTC needs more space) 17 Cost Allocation • Infrastructure investments to increase DER hosting capacity for avoiding or delaying grid reinforcement (mainly network driven) vs. • Additional investments to enable new services, markets and business models (mainly market driven) • Who is going to finance investments in order to enable new services, markets and business models? 18 Experiences from Medium Voltage Network Projects 19 Objective of DG DemoNet Validation Objective: Development, planning, implementation and demonstration of voltage control concepts allowing a cost-effective integration of very high shares of distributed generation in medium voltage networks, • maintaining a high level of quality of supply • achieving economic benefits in comparison to network reinforcement 20 Project chain - DG DemoNet Influence of distributed generation on the paramater of power quality BAVIS U P3 L4 DG12 DG11 DG10 DG9 P4 Hydro Photovoltaic Other New DG - plants Load nodes H5 DG8 O3 110 kV DG6 110 kV H6 110 kV O2 DG5 110/30 kV CVCU DG13 DG3 DG4 110/30 kV 30 kV DG7 t L108 30 kV H7 110/30 kV CVCU DG2 30 kV DG1 H4 H8 P2 H3 M2 O1 M2 H10 DG4 H9 DG4 DG4 P1 H11 L88 DG1 DG5 U-Regelung Toolbox 110 kV grid H2 DG1 DG5 H12 H13 DG1 DG5 DG1 DG1 DG1 DG6 DG2 DG6 U DG2 DG6 M1 M3 M1 DG3 H1 DG2 M3 DG3 DG3 Design of voltage control concepts to increase the hosting capacity of networks, Technical and economical assessement t Improvement of concepts, advanced planning tools Development, field test, analysis and validation – proof of concept Technical Investigations (Case Study 1) 22 High economical advantages are expected Konventionelle Network reinforcement 100% Netzverstärkung (BAU = (reference scenario) Business as Usual) Case Study Vorarlberg Smart Grid Fallstudie 15% Cost Red. 85% Einsparung VKW - Netz AG Smart Study Grid Fallstudie Case Salzburg Cost Red. 70% Einsparung 30% Salzburg Netz GmbH Fallstudie Case Smart StudyGrid Upper Austria 70% Cost Red. 30% Einsparung EnergieAG Netz Kostenanteile und Einsparungen in Bezugtozu Netzverstärkung Costs and cost reductions compared thekonventioneller reference scenario network reinforcement 23 Smart Grids R&D and Deployment 24 Smart Grids R&D and Deployment 25 Conclusions 26 Conclusions Smart Grid is not a single technology system approach Smart Grid is a evolutionary process Smart Grid deployment is not a sequential process Do not base deployment costs on full engineering costs Cost for increased hosting capacity vs. cost for additional services Thus at the moment it is difficult to determine actual costs for a smart grid deployment 27 Acknowledgment All presented projects are financed by the Austrian climate and energy fund 28 AIT Austrian Institute of Technology your ingenious partner Helfried Brunner Energy Department Electric Energy Systems AIT Austrian Institute of Technology Österreichisches Forschungs- und Prüfzentrum Arsenal Ges.m.b.H. Giefinggasse 2 | 1210 Vienna | Austria T +43(0) 50550- 6283 | F +43(0) 50550-6390 [email protected] | http://www.ait.ac.at