Survey
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Quotes for: • • • • • • • Gantry: we should “oversize” this for additional 30-40% more capacity, if the price is reasonable. We should be able to accommodate 8” and well as 6” OGP: we need this for testing, verifying and measuring components as well as the assembled module Wirebonder: Hesse&Knipps BJ820 is available for ~$75K. If we go ahead and purchase this wirebonder, this gives us a chance to experiment with wirebonding before the preseries Thermal burn-in station: need a design and cost Service contracts for tools? Shipping containers for modules? Ship every two weeks to Fermilab? Cost of shipping and packaging? Recycle shipping containers Module assembly consumables? Epoxy, ... ? N. Akchurin, 12 April 2016 TTU 1 Cleanroom Status and Items • • • Vladimir is looking at NTC rooms 101 and 101A. We will have a cost estimate in a couple of weeks I discussed with Romo and Dorsette the possibility of using the Innovation Hub and Research Center. More discussion is necessary (a couple of weeks) Additional cost items: • • Consumables (gowns, masks, shoe covers, etc) assumed to be $5K/month Tech/institutional labor to maintain cleanroom N. Akchurin, 12 April 2016 TTU 2 Testing • There are different levels of testing: • • • Deep Testing: testing every conceivable aspect of sensors before and after irradiation, testing PCBs with components, and complete modules Sensor Acceptance Test: perform tests on one sensor out of a “boat” before module assemble starts Module Readiness Test: perform a series of tests to qualify an assembled module for cassette assembly before shipping N. Akchurin, 12 April 2016 TTU 3 Scheduling Assume a 2-month period repeats itself for the duration of the project Batch 1 (~10% of total) is special. Develop a schedule for Batch 3 to 10 with appropriate lags (start to start, end to start linkages) N. Akchurin, 12 April 2016 TTU 4 402.04 Endcap Calorimetry 402.4.2 Management 402.4.3 Sensors 402.4.3.1 Milestones and Externals 402.04.06 Backing Calorimeter 402.4.4 Modules 402.4.4.1 Milestones and Externals 402.4.4.2 Module Components 402.4.4.3 Module Factories 402.4.4.4 Assembly of Standard Modules Site 1 402.4.4.5 Assembly of Standard Modules Site 2 402.4.4.6 Assembly of OddSized Modules 402.4.5.1 Milestones and Externals 402.4.5.2 Cooling plates 402.4.5 Cassettes 402.04.07 Electronics and Services 402.4.5.3 Electrical Components 402.4.5.4 Mechanics and Tooling 402.4.5.5 FH Cassettes 402.4.3.2 Standard Sensors 402.4.4.2.1 Base plates 402.4.4.3.1 Test Stands 402.04.05.02.01 Procurement 402.4.5.3.1 LV Circuit Boards 402.4.5.4.1 Cassette Frames 402.4.5.5.1 Cassette Components Reception and Test 402.4.3.3 Oddsized Sensors 402.4.4.2.2 Kapton 402.4.4.3.2 Site 1 402.04.05.02.02 Fabrication 402.4.5.3.2 HV Cables 402.4.5.4.2 Cassette Assembly Tooling 402.4.5.5.2 Cassette Assembly 402.4.4.2.3 Cover plates 402.4.4.3.3 Site 2 402.04.05.02.03 Testing 402.4.5.3.3 Cassette interface 402.4.5.4.3 Cassette Electrical Test Stands 402.4.5.5.3 Cassette Testing 402.4.4.2.4 Circuit Boards 402.4.4.3.4 Site 3 402.04.05.02.04 Shipping 402.4.5.4.4 Cassette Thermal Test Stands 402.4.5.5.4 Cassette Shipping N. Akchurin, 12 April 2016 TTU 5