Survey
* Your assessment is very important for improving the work of artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the work of artificial intelligence, which forms the content of this project
MAINTENANCE REPORT Evolis Fields with § can be removed or left empty if the information is already reported in the Work Order Report Work Order N. § Customer: § City: § State/Country: Evolis S/N: Evolis Software Version: Engineer: Teacher Software Version: Service Software Version: APF Version: Required as Part of PM If needed only 6 MONTH PM ANNUAL PM Decontamination, Cleaning and Inspection of Components REFERENCE: User Manual 3.20 (Code 93489) Components If needed Air vent on Computer / Monitor / Printer / UPS Evolis Chassis (Inner & Outer) : Spray all surfaces wet with 70% Isopropyl Alcohol Evolis Workstation Deck and Divers (follow the Decontamination procedure from User Manual) Sample and Reagent rack, Plate holders Tip eject ramp, Pipettor wash station, Plate transport and Washer Module Run Washer Disinfect BR Vxx.asy with Microcide SQ (Code 90071) System Liquid container, 4 wash buffer bottles, waste container (inner /outer) Defragment the computer Hard Disk Parts Replacement Procedures and Performance Checks Biannual PM Kit (Code 89944) Annual PM Kit (Code 89943) Clean Disinfect Replace Power off Evolis to replace PM parts Washer Module Dispense Tubing (Ref 9, 10,11) Wash Tubing Filters (Ref 2) Vacuum sensor T-fitting trap between internal waste bottles (Ref 6 with 45° Ang +4) Internal Waste Bottle Tubing (Ref 1, 5) Peristaltic Pump Cassette (Ref P) Liquid Waste Lines (Ref 7, 8) Waste Container Small ID Tubing (Ref 12) System Liquid Porex Filter x4 (Ref 3) Washer Washer Guide Rail Use AmS oil AWF ISO 15 Syringe Drive Z guide rod Use AmS oil AWF ISO 15 Pipettor Arm (* For EVOLIS™ Standard only) Bridge X guide rail and linear gear Assembly Use light oil for all All X axis Rollers Evolis stainless All X axis Roller Bearings Use AmS oil AWF ISO 15 steel guide rods Y axis guide rail Y-axis rollers Fill Pipettor Bridge X Z Sledge Oil Reservoirs Lube Kit Use AmS oil AWF ISO 15 (Code 89942) All Y axis Roller Bearings Use AmS oil AWF ISO 15 Z axis guide linear gear X axis Guide Rail Plate Transport Assembly X axis Guide Rail Use AmS oil AWF ISO 15 Z spindle Z spindle Use Lubrication Kit Grease AmS oil GLC-MP Reference: PMI/ Evolis Version: 10 Check on the European database if this document is the last version REFERENCE SM: 1.5 1000 uL Syringe *(* For EVOLIS™ Standard only) Syringe Valve* (*not in the PM Kit, see Evolis Maintenance Manual Short Instruction) TA blue coax cable : to remove with tool 97263 Module Maintenance Protocols MmSI SM:11.5.6 SM:11.5.7 MmSI Clean Lube N/A SM: 11 SM: 11 SM: 4.4.1 SM: 11 SM: 11 SM: 4.4.2 SM: 4.4.2 SM: 4.4.3 SM: 8 SM: 4.4.4 SM: 8 SM: 4.4.5 1/3 REFERENCE SM: 7 MAINTENANCE REPORT Evolis Alignments and QC Verification Protocols Final Checks Done Passed REFERENCE Verify Ref Left Position Verify Tip Touch Verify Tip Eject and Tip Rack Positions Verify Waste/Wash Positions Verify Dilution Deck, Rack, and Pipette Deck Alignments Verify all Reagents rack and Sample rack spring's correct shape and efficiency. Verify Snap in lock alignment Verify Plate holder flatness (for all Pl Holders) and check spring Verify All – 0, 1, 2, T and or U,V, W, Y Rack alignments and springs states Prime all Washer Dispense Pumps and verify Caution label is applied Verify Peristaltic Pump operation with Small Waste Bottle Emptying Run Evolis Service SW Plate Transport Module Cycle test "E" (V1.20) or "P" (V<1,20)* Run Evolis Service SW Automatic Pressure Measurement test* (* For EVOLIS™ Premium only) Run Barcode Scanner Test function* Run Evolis Service SW Pipettor Module alignment quick check* "Evolis Adv Autotest" Run Reader Verification Plate* Run Pipettor Check.asy* (Bio-Rad PE kit) Run Washer Aspirate and Dispense Check.asy* (Bio-Rad PE kit) Run Incubator Verification tool* This test must be documented in the “Comments” field Backup alignment files to the Evolis USB device. Copy C:\BioRad\System\koordina.dat and 0, 1, ,2 T, U, V, W, Y .rac, *.mpc, *.Glb files to A:\ or USB key Fill in and stick the PM label on the instrument side and valve sticker if needed *Results report have to be saved, printed and given to the Customer MmSI ESN n°28 ESN n°30 SM: 11.7.13 ESN n°31 SM: 7.8 ESN n°29 QC Verification Protocols for Metrologic Customers MmSI Done IQ-OQ QUICK GUIDE V1 N/A ESN n° 29 Passed Run “CTRL” Pipet High/Low Vol BR Vxx.asy *Results report have to be saved, printed and given to the Customer SM: 11.7.4 SM: 11.7.5 SM: 11.7.9/ 11.7.6 SM: 11.7.10 SM: 11.7.7-8/ 11.7.11 N/A REFERENCE IQ-OQ QUICK GUIDE V1 N/A * Tick as appropriate Action taken if test failed: Comments: REFERENCE: MmSI = Maintenance Manual Short Instruction (in PMI kit box), SM= Service Manual and Chapter, ESN= EVOLIS™ Service News Reference: PMI/ Evolis Version: 10 Check on the European database if this document is the last version 2/3 MAINTENANCE REPORT Evolis Tools and materials These fields can be removed or left empty if the information is already reported in the Work Order Report Incubator Verification Tool Make and model Serial number Certification expiration date Reader Verification Plate Make and model Serial number Certification expiration date Manual Pipette (for Metrologic Test only) Make and model Serial number Certification expiration date The EVOLIS™ instrument has been serviced for Preventative Maintenance and meets BioRad performance specifications. Signature Date Bio-Rad Engineer Customer Reference: PMI/ Evolis Version: 10 Check on the European database if this document is the last version 3/3