Survey
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
46th PAC on Particle Physics JINR, January 16, 2017 Implementation of recommendations and work towards optimisation of the research programme Itzhak Tserruya Weizmann Institute of Science Outline • Highlights of the Recommendations from the 45th PAC – PP • 120th Scientific Council meeting (September 22-23, 2016) • Agenda Itzhak Tserruya 46th PAC-PP, January 16-17, 2017 Nuclotron, NICA, BM@N and MPD (I) Significant milestones reported at the 45th PAC PP meeting: Agreement between the Russian government and JINR on a dedicated contribution from Russia to the NICA megaproject that guarantees NICA realization. Signing of the Protocol between the Russian Ministry of Education and Science, the Chinese Ministry of Science and Technology, the Chinese Academy of Sciences and JINR on the prospects of cooperation within the framework of the NICA megaproject Itzhak Tserruya 46th PAC-PP, January 16-17, 2017 Nuclotron, NICA, BM@N and MPD (II) At the last PAC we heard progress reports on: • NICA (by A. Sidorin): successful commissioning of the new fore-injector of the LU-20 linear accelerator and successful acceleration of an unpolarized deuteron beam. • The Nuclotron experimental program (by E. Strokovsky): the PAC looks forward to hearing reports on the machine performance during the two runs foreseen in 2016, and in particular on the progress toward delivering a polarized deuteron beam. We are looking forward(by to N. the progress successful reports on Nuclotron• Infrastructure developments Emelianov): launch of the NICA cryogenic complex –– the largest liquefier in Russia with a capacity of 1100 liters NICA, BM@N and MPDhelium projects. per hour and the near completion of the facility for producing and testing of In 2016, magnets the DACforfor two meetings, superconducting theMPD NICA had accelerator complex. on April 6 and on June 22, the DAC for BM@N had one meeting on June 22. • MPD (by V. Kolesnikov): the PAC encourages further efforts towards completion of the technical design for reports forand the main subsystems the MPD detector and The DACs MPD for BM@N willofhave working meetings emphasizes again the17-18. need to attract young professionals and additional outside groups on January for the realization of the MPD project. • BM@N (by M. Kapishin): The PAC is concerned by the delay in the GEM delivery by CERN. It requests the BM@N team to establish clear milestones to allow appropriate monitoring of the project execution. The PAC looks forward to hearing detailed reports on the two technical runs that took place in 2016. Scientific Council (I) Excerpts from the Resolutions of the 120th session of the Scientific Council held on September 22-23, 2016: General considerations: The Scientific Council congratulates Professor V. Matveev on his re-election as Director of JINR for a second term of five years and wishes him much success in leading this international centre and developing a solid strategy for its sustainable development in the long-term future. Recommendations on the seven year plan: The Scientific Council takes note of the final Draft of the Seven-Year Plan for the Development of JINR for 2017–2023. The plan is well balanced and clearly reflects the uniqueness of JINR as a multidisciplinary research centre. The Scientific Council appreciates the efforts towards integration of JINR’s new and updated facilities (NICA, SHE Factory, IBR-2, Baikal-GVD) into the European and worldwide research infrastructures. The Scientific Council recommends that the JINR Finance Committee and Committee of Plenipotentiaries approve the presented seven-year plan, with an understanding that it will be updated on a year-by-year basis with the actual situation taken into account. Scientific Council (II) Recommendations on the NICA project: The Scientific Council is pleased with the dynamic and comprehensive efforts being taken on this flagship project of JINR. The Scientific Council appreciates the progress in developing the Nuclotron-NICA accelerator complex, including the commissioning of the new fore-injector of the LU-20 linear accelerator, the installation and testing of the linear accelerator HILac, and the testing of the new polarized source. At the same time, the Scientific Council expresses concern with the delay in manufacturing the superconducting magnets and looks forward to intensified work to eliminate it. The Scientific Council recognizes the efforts of the BM@N collaboration towards testing and commissioning new detector subsystems, in particular GEM-based tracking detectors for the development of a state-of-the-art apparatus. The Scientific Council also welcomes the signing of the agreement between the MPD collaboration and participants from China for placing an order to manufacture the electromagnetic calorimeter modules and looks forward to further progress. The Scientific Council congratulates the MPD management on ensuring good progress on the manufacturing the MPD superconducting magnet. Itzhak Tserruya 46th PAC-PP, January 16-17, 2017 Scientific Council (III) Recommendations in connection with the PAC-PP: The Scientific Council shares the satisfaction of the PAC for Particle Physics with the Agreement between the Russian Government and JINR concerning dedicated support from Russia to the NICA megaproject and with the Protocol between the Russian Ministry of Education and Science, the Chinese Ministry of Science and Technology, the Chinese Academy of Sciences and JINR on prospects of cooperation within the framework of the NICA megaproject. These are important steps that will enhance the international status of the NICA project and further guarantee its timely completion in 2020. The Scientific Council notes the progress towards realization of the Nuclotron-NICA project, • endorses In brief, I amtaken very pleased to report that the SCsubsystems endorsed the efforts towards modernization of the key infrastructure and welcomes the successful launch of the NICA cryogenic complex. all the recommendations of the PAC-PP. The Scientific Council appreciates the importance of the experimental programme using beams from the Nuclotron, in particular, the technical runs that serve for testing and commissioning of key sub-systems of the BM@N detector. The Scientific Council joins the PAC in reiterating again the need to attract young scientists and additional external groups for the realization of the MPD project. The Scientific Council supports the PAC’s recommendations on the approval of new projects and the continuation of ongoing projects in particle physics within the suggested time scales, as outlined in the PAC report. Itzhak Tserruya 46th PAC-PP, January 16-17, 2017 46th PAC-PP agenda January 16-17, 2017 Programme Advisory Committee for Particle Physics 46th meeting, 16–17 January 2017 10.2.2. “Hadron physics in the COMPASS experiment: status and proposal on organizational matter” Referees: A. Ereditato H. Gutbrod A. Kulikov B. Shvarts DRAFT PROGRAMME Monday, 16 January 2017 9.00 1. Opening of the meeting I. Tserruya (5 min.) 2. Implementation of the recommendations of the PAC’s 45th meeting I. Tserruya (15 min.) 3. Information on the Resolution of the 120th session of the JINR Scientific Council (September 2016) and on the decisions of the JINR Committee of Plenipotentiaries (November 2016) R. Lednick! (20 min.) 4. Progress towards realization of the Nuclotron-NICA project A. Sidorin (20 min.) 5. Report from the Nuclotron Run Coordinator E. Strokovsky (20 min.) 6. Report on the infrastructure developments, including the Nuclotron N. Agapov (20 min.) Coffee break 15.20 11. Proposal of a new project: NA64 Referees: J. Mnich S. Movchan A. Dorokhov 12. Written reports on projects previously approved until the end of the Seven-year plan for 2010–2016: ALPOM-2, HADES, NA62, STAR, “New accelerators” 13. Scientific reports: Highlights of today's meeting: Update reports on NICA, MPD and BM@N Coffee break 13.2 “JINR neutrino programme. Daya Bay and JUNO: precision measurements with reactor neutrinos” M. Gonchar (30 min.) Progress towards realization of the MPD project, including results of simulation V. Kolesnikov (30 min.) 17.00 8. Progress towards realization of the BM@N project, including results of simulation M. Kapishin (30 min.) Tuesday, 17 January 2017 9. Reports on the scientific results obtained by the JINR groups in the LHC experiments: Poster presentations by young scientists in the field of particle physics research Scientific reports from ALICE, ATLAS and CMS 9.00 9.1. ALICE E. Rogochaya (20 min.) 9.2. ATLAS A. Soloshenko (20 min.) 9.3. CMS A. Zarubin (20 min.) 10.00 Meeting of the PAC members with the JINR Directorate 15. General discussion Coffee break New projects and projects seeking continuation 10. Reports on themes and projects approved for completion in 2016 and proposals for their continuation: 10.1. COMET Referees: E. Boos A. Cheplakov N. Skachkov Proposals for the agenda of the next PAC meeting 17. PAC recommendations The materials for the meeting are available at http://indico-new.jinr.ru Z. Tsamalaidze (20 min.) 10.2. “Studies of the Nucleon and Hadron Structure at CERN” 10.2.1. COMPASS-II Referees: A. Ereditato H. Gutbrod Yu. Potrebenikov S. Goloskokov 16. Closing of the meeting Lunch break 14.00 Closed session: 11.30 A. Nagaytsev (20 min.) 30 min. A. Silenko (30 min.) 7. 14. D. Peshekhonov (20 min.) 13.1 “Electromagnetic and gravitational effects for spin dynamics in accelerators” Reports on the 2016 Nuclotron runs 11.00 A. Guskov (20 min.) Thank you ! Itzhak Tserruya 46th PAC-PP, January 16-17, 2017