46th PAC on Particle Physics
JINR, January 16, 2017
Implementation of recommendations and
work towards optimisation
of the research programme
Itzhak Tserruya
Weizmann Institute of Science
Outline
•
Highlights of the Recommendations from the 45th PAC – PP
•
120th Scientific Council meeting (September 22-23, 2016)
•
Agenda
Itzhak Tserruya
46th PAC-PP, January 16-17, 2017
Nuclotron, NICA, BM@N and MPD (I)
Significant milestones reported at the 45th PAC PP meeting:
 Agreement between the Russian government and JINR on a dedicated
contribution from Russia to the NICA megaproject that guarantees NICA
realization.
 Signing of the Protocol between the Russian Ministry of Education and Science,
the Chinese Ministry of Science and Technology, the Chinese Academy of
Sciences and JINR on the prospects of cooperation within the framework of the
NICA megaproject
Itzhak Tserruya
46th PAC-PP, January 16-17, 2017
Nuclotron, NICA, BM@N and MPD (II)
At the last PAC we heard progress reports on:
• NICA (by A. Sidorin): successful commissioning of the new fore-injector of the LU-20
linear accelerator and successful acceleration of an unpolarized deuteron beam.
• The Nuclotron experimental program (by E. Strokovsky): the PAC looks forward
to hearing reports on the machine performance during the two runs foreseen in 2016,
and in particular on the progress toward delivering a polarized deuteron beam.
 We are looking
forward(by
to N.
the
progress successful
reports on
Nuclotron• Infrastructure
developments
Emelianov):
launch
of the NICA
cryogenic
complex
–– the
largest
liquefier in Russia with a capacity of 1100 liters
NICA,
BM@N
and
MPDhelium
projects.
per hour and the near completion of the facility for producing and testing of
 In 2016, magnets
the DACforfor
two meetings,
superconducting
theMPD
NICA had
accelerator
complex. on April 6 and on
June 22, the DAC for BM@N had one meeting on June 22.
• MPD (by V. Kolesnikov): the PAC encourages further efforts towards completion of
the technical
design for
reports
forand
the main
subsystems
the MPD
detector
and
 The DACs
MPD
for BM@N
willofhave
working
meetings
emphasizes
again the17-18.
need to attract young professionals and additional outside groups
on January
for the realization of the MPD project.
• BM@N (by M. Kapishin): The PAC is concerned by the delay in the GEM delivery by
CERN. It requests the BM@N team to establish clear milestones to allow appropriate
monitoring of the project execution. The PAC looks forward to hearing detailed reports
on the two technical runs that took place in 2016.
Scientific Council (I)
Excerpts from the Resolutions of the 120th session of the Scientific Council held on
September 22-23, 2016:
General considerations:
 The Scientific Council congratulates Professor V. Matveev on his re-election as
Director of JINR for a second term of five years and wishes him much success in
leading this international centre and developing a solid strategy for its sustainable
development in the long-term future.
Recommendations on the seven year plan:
 The Scientific Council takes note of the final Draft of the Seven-Year Plan for the
Development of JINR for 2017–2023. The plan is well balanced and clearly
reflects the uniqueness of JINR as a multidisciplinary research centre. The
Scientific Council appreciates the efforts towards integration of JINR’s new and
updated facilities (NICA, SHE Factory, IBR-2, Baikal-GVD) into the European and
worldwide research infrastructures. The Scientific Council recommends that the
JINR Finance Committee and Committee of Plenipotentiaries approve the
presented seven-year plan, with an understanding that it will be updated on a
year-by-year basis with the actual situation taken into account.
Scientific Council (II)
Recommendations on the NICA project:
 The Scientific Council is pleased with the dynamic and comprehensive efforts
being taken on this flagship project of JINR.
 The Scientific Council appreciates the progress in developing the Nuclotron-NICA
accelerator complex, including the commissioning of the new fore-injector of the
LU-20 linear accelerator, the installation and testing of the linear accelerator
HILac, and the testing of the new polarized source. At the same time, the Scientific
Council expresses concern with the delay in manufacturing the superconducting
magnets and looks forward to intensified work to eliminate it.
 The Scientific Council recognizes the efforts of the BM@N collaboration towards
testing and commissioning new detector subsystems, in particular GEM-based
tracking detectors for the development of a state-of-the-art apparatus.
 The Scientific Council also welcomes the signing of the agreement between the
MPD collaboration and participants from China for placing an order to manufacture
the electromagnetic calorimeter modules and looks forward to further progress.
 The Scientific Council congratulates the MPD management on ensuring good
progress on the manufacturing the MPD superconducting magnet.
Itzhak Tserruya
46th PAC-PP, January 16-17, 2017
Scientific Council (III)
Recommendations in connection with the PAC-PP:
 The Scientific Council shares the satisfaction of the PAC for Particle Physics with the
Agreement between the Russian Government and JINR concerning dedicated support from
Russia to the NICA megaproject and with the Protocol between the Russian Ministry of
Education and Science, the Chinese Ministry of Science and Technology, the Chinese
Academy of Sciences and JINR on prospects of cooperation within the framework of the
NICA megaproject. These are important steps that will enhance the international status of the
NICA project and further guarantee its timely completion in 2020.
 The Scientific Council notes the progress towards realization of the Nuclotron-NICA project,
• endorses
In brief,
I amtaken
very
pleased
to report
that
the SCsubsystems
endorsed
the efforts
towards
modernization
of the key
infrastructure
and
welcomes the successful launch of the NICA cryogenic complex.
all the recommendations of the PAC-PP.
 The Scientific Council appreciates the importance of the experimental programme using
beams from the Nuclotron, in particular, the technical runs that serve for testing and
commissioning of key sub-systems of the BM@N detector.
 The Scientific Council joins the PAC in reiterating again the need to attract young scientists
and additional external groups for the realization of the MPD project.
 The Scientific Council supports the PAC’s recommendations on the approval of new projects
and the continuation of ongoing projects in particle physics within the suggested time scales,
as outlined in the PAC report.
Itzhak Tserruya
46th PAC-PP, January 16-17, 2017
46th PAC-PP agenda January 16-17, 2017
Programme Advisory Committee for Particle Physics
46th meeting, 16–17 January 2017
10.2.2. “Hadron physics in the COMPASS experiment:
status and proposal on organizational matter”
Referees: A. Ereditato
H. Gutbrod
A. Kulikov
B. Shvarts
DRAFT PROGRAMME
Monday, 16 January 2017
9.00
1.
Opening of the meeting
I. Tserruya
(5 min.)
2.
Implementation of the recommendations
of the PAC’s 45th meeting
I. Tserruya
(15 min.)
3.
Information on the Resolution of the 120th session of
the JINR Scientific Council (September 2016) and on
the decisions of the JINR Committee of
Plenipotentiaries (November 2016)
R. Lednick!
(20 min.)
4.
Progress towards realization of the Nuclotron-NICA
project
A. Sidorin
(20 min.)
5.
Report from the Nuclotron Run Coordinator
E. Strokovsky
(20 min.)
6.
Report on the infrastructure developments, including
the Nuclotron
N. Agapov
(20 min.)
Coffee break
15.20
11.
Proposal of a new project:
NA64
Referees:
J. Mnich
S. Movchan
A. Dorokhov
12.
Written reports on projects previously approved until the
end of the Seven-year plan for 2010–2016: ALPOM-2,
HADES, NA62, STAR, “New accelerators”
13.
Scientific reports:
Highlights of today's meeting:
 Update reports on NICA, MPD and BM@N
Coffee break
13.2 “JINR neutrino programme. Daya Bay and JUNO:
precision measurements with reactor neutrinos”
M. Gonchar
(30 min.)
Progress towards realization of the MPD project,
including results of simulation
V. Kolesnikov
(30 min.)
17.00
8.
Progress towards realization of the BM@N project,
including results of simulation
M. Kapishin
(30 min.)
Tuesday, 17 January 2017
9.
Reports on the scientific results obtained by the JINR
groups in the LHC experiments:
Poster presentations by young scientists in the field of
particle physics research
 Scientific reports from ALICE, ATLAS and CMS
9.00
9.1.
ALICE
E. Rogochaya
(20 min.)
9.2.
ATLAS
A. Soloshenko
(20 min.)
9.3.
CMS
A. Zarubin
(20 min.)
10.00
Meeting of the PAC members with the JINR Directorate
15.
General discussion
Coffee break
 New projects and projects seeking continuation
10.
Reports on themes and projects approved for
completion in 2016 and proposals for their continuation:
10.1. COMET
Referees: E. Boos
A. Cheplakov
N. Skachkov
Proposals for the agenda of the next PAC meeting
17.
PAC recommendations
The materials for the meeting are available at http://indico-new.jinr.ru
Z. Tsamalaidze
(20 min.)
10.2. “Studies of the Nucleon and Hadron Structure
at CERN”
10.2.1. COMPASS-II
Referees: A. Ereditato
H. Gutbrod
Yu. Potrebenikov
S. Goloskokov
16.
Closing of the meeting
Lunch break
14.00
Closed session:
11.30
A. Nagaytsev
(20 min.)
30 min.
A. Silenko
(30 min.)
7.
14.
D. Peshekhonov
(20 min.)
13.1 “Electromagnetic and gravitational effects
for spin dynamics in accelerators”
 Reports on the 2016 Nuclotron runs
11.00
A. Guskov
(20 min.)
Thank you !
Itzhak Tserruya
46th PAC-PP, January 16-17, 2017