Model on Demand Base
Case Change Discussion
MOD-032 Users Group
April 12, 2016
Introduction
• Model quality is a high priority. MISO is working on
metrics for our model development process.
– MISO is gathering error based metrics and is using data
from Model On Demand
• There are hundreds of Base Case Change Correction projects applied to MOD base case
committed annually
– The nature of the base case correction is often not clear. Is
it an error correction or field change?
– MISO wants to improve information provided on Base
Case Change projects, so we can implement metrics
– Clarify MTEP project versus Base Case Change use
2
MTEP project type in MOD
• BPM-020 Section 4.2.3 contains MTEP Project Reporting
Guidelines (excerpt)
– All projects that represent a system topology change (i.e.,
constructing a new circuit, tapping an existing circuit, removing a
circuit from the planning model, or retiring a circuit). All projects that
include interconnecting new distribution service from new or existing
transmission facilities...
– All new circuit breaker additions to transmission facilities.
– All upgraded circuit breakers that result in changes to a breaker’s
continuous current-carrying or interrupting capacity.
– All projects that change the electrical characteristics of a circuit (i.e.,
changes to shunt or series inductors, capacitors, conductor type or
performance, switches, current transformers, or wave traps).
– All projects that change a circuit rating.
• Projects meeting these guidelines must be submitted as
MTEP project type, not Base Case Change project type, and
must go through the MTEP project review process
3
Issues with Base Case Changes in MOD
• Base Case Change projects are all “Corrections”
• MISO recommends adding new statuses to clarify
the nature of the Base Case Change project type
– Error correction. Any PSSE data errors. For example,
line impedance was wrong.
– Field change. Fixed tap transformer adjustment.
Switched shunt voltage Vhi and Vlow limits. Not
topology changes that would be MTEP project type
– As Built. Impedance and rating adjustments after
MTEP project already committed to MOD base case
• Project should reference original MTEP project ID
– Any other that are not MTEP project type?
4
Other Issues with Base Case Changes
• MOD process issues found reviewing the data
– 10% of projects do not have submitting company
acronym in project name.
• We need this to efficiently direct projects to staff for review and
acceptance
– Base case update projects should not contain
company’s entire system representation
• Please submit only changes to the MOD Base Case in your
MOD projects. We need this to efficiently review and accept
projects.
5
Conclusion
• MISO will finalize expanded statuses, implement
them, and communicate when they are available
• Please include your company acronym in the
project name
• Please submit only system changes to MOD
6