Survey
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Compton Gamma-ray Generation Experiment by Using an Optical Cavity in ATF POSIPOL 2007 Workshop at LAL Hirotaka Shimizu Hiroshima University Topics • Introduction • R&D Report in ATF • Future Plan in ATF Introduction -Cavity-Compton Collaboration- Q.1) Why does R&D for Polarized Positron be needed ? Introduction 1 / 10 ! e- : 80% Polarization e+ : 60% Polarization with GRACE System Developed by Computational Physics Group in KEK Introduction -Cavity-Compton Collaboration- Q1) Why does R&D for Polarized Positron be needed ? Ans.) For forthcoming ILC era, Polarized Positron will play a very important roll. N New Physics Search Background Suppression Introduction -Cavity-Compton Collaboration- Q.2) Then, how to start R&D ? ・ Is there any good Equipments ? ・ Also, any good Collaborators ? ・ And good enough Advantages ? The Clue is Accelerator Test Facility (ATF) ~ 54 m Beam Energy → 1.28GeV ~ 30 m Beam Size → 100μm×10μm Emittance → 1.0x10^-9 rad.m 1.0x10^-11 rad.m (Ultra Low !!) and in ATF, we meet • Laser-Wire Collaborations advanced electron beam monitor system with laser & stacking cavity. • LUCX Collaborations (Laser Undulator Compact X-ray source) creating X-ray with Compton backward scattering scheme at small lineac in ATF. → Highly Accumulated Technique about Laser and Stacking Cavity Introduction -Cavity-Compton Collaboration- Q.2) Then, how to start R&D ? ・ Is there any good Equipments ? ・ Also, any good Collaborators ? ・ And good enough Advantages ? Ans.) We’ve started Cavity-Compton Collaboration for R&D study of Polarized Positron in ATF. R&D Report in ATF • Basic Concepts (Our Strategy #1) ◇ Simple Structure Cavity (2 mirrors) ◇ Enhancement Factor ~ 1000 → Quick Construct & Have an experiment in ATF DR R&D Report in ATF Laser Section Type Power Frequency Pulse Width Cavity Section Length Mirror Reflection Rate Beam Waist Crossing Angle YAG-VAN (1064nm) 10 W 357 MHz 10 ps 420 mm 99.7 % 60 μm ( in 2σ) 12 degree R&D Report in ATF • Experiment (Our Strategy #2) ◇Using CW laser (training laser) before going to pulse laser use. Training Cavity with CW laser Training Cavity with Pulse Laser Real Cavity with CW laser Real Cavity with Pulse laser Set Up for Training Configuration obtaining transmission external cavity Laser photo diode oscilloscope high-voltage amp. function generator TEM00 mode signal Voltage time modulation with chopping wave Guoy Phase factor external cavity Free Spectral Range (FSR) photo diode Full Width Half Maximum high-voltage amp. function generator Typical examples of observations • With training configuration, 800~900 finesse can be reached constantly. • Also, observed beam waist achieved inside the cavity is stably about 60μm. for Feed-Back, 0 [V] 0 [V] DC off-set (< 0) 0 [V] (feed-back point) high-voltage amp. P & I circuit For the first step, using usual analog PID-module (function “D” is turned off). Transition Light Error Signal Piezo Modulation Reflected Light ● Those results are obtained with each time constant (parenthetic). Turn to Pulse Laser Set-Up first try with pulse laser • Have not reached to the best matching condition yet. → achieved finesse ~ 200 → beam waist size ~ 67μm • Need more practice to erase higher mode peaks, and to get more high finesse value. • Feed-Back study results Transmission Light Integration (1ms) Error Signal Integration (10ms) Reflected Light Equipments - status report - • Real Cavity has delivered. • Recently, vacuum chamber has also come. • After this tour, mover table will arrive at KEK. Port for CCG ATF e-Beam Port for ion pump Laser Terminal for piezo End cap Inner pipe for electron Trunc Small hales on the pipe near IP Piezo housing e-Beam 12deg. Laser Mirror housing Further Plan in ATF - as a summary of this talk - • Laser stacking studies should be continued. • Parallel with those studies, preparations for the installation also have to be started. • Indeed there’s huge time delay, however, we’ll try to install our equipments during this summer shutdown into the DR. Merci !