Survey
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
GUIDANCE NOTE GN 7/99 REFURBISHMENT OF CONCRETE BUILDINGS: The decision to refurbish A J Martin, BSRIA, C A Gold, BCA INTRODUCTION It is estimated that currently 8 million m2 of office space requires refurbishment, much of it constructed in the 1960s and 70s in reinforced concrete. These buildings have the potential to provide the standards of accommodation required in the 21st century if refurbished in the correct manner. There are many factors influencing the refurbishment of concrete buildings and this Guide presents the main issues from an owner/occupier or developer’s viewpoint, together with cost summaries and illustrative case studies. The Guide also provides useful contextual information for structural and building services engineers and architects. The emphasis is on concrete-framed buildings that are typically used for offices. However, much of the information is also common to other building types such as housing, hospitals, schools, retail premises and hotels as well as to the growing number of buildings undergoing conversion such as, redundant office buildings being converted to residential, retail or hotel use, for example. This is the first of three publications concerned with refurbishment. The second document covers the detailed technical aspects of structural and services refurbishment [1], whilst the third considers approaches for the design of new buildings so that they will be more adaptable to future changes in requirements[2]. These two documents are intended for consulting structural and building services engineers and architects. CONCRETE BUILDINGS - A VALUABLE ASSET Concrete buildings dating from the 1970s and earlier, offer several benefits compared with their more recently constructed counterparts. These benefits are: ♦ the buildings are often in a favourable location ♦ the buildings are higher and have a larger footprint and more car parking than would be allowed under current planning regulations ♦ narrower floor plates and natural ventilation are often found in these buildings, thus meeting the requirement of an increasing number of clients for opening windows (occupants are more tolerant of poorer internal environments if they have greater control over the environment in their space) ♦ mechanical cooling can be added where required ♦ there is a shortage of large buildings, and this may add value to the refurbishment. © BSRIA GN 7/99 Factors influencing rental income ♦ ♦ ♦ ♦ ♦ ♦ ♦ location building image building condition flexibility of layout (column grid) internal environment internal appearance extent of car parking ♦ proximity to transport links. The refurbishment market is larger than the new build market and possession of refurbished concrete buildings can form viable economic stock. If a building is part of a portfolio it may be possible to remove it from the rental market for say, eighteen months, refurbish it and then put it back on the market with the increased rental income repaying the investment within five to ten years, depending on the factors given in the box above. Refurbishment of concrete buildings - The decision to refurbish A Approximately 10% of office space is refurbished in some form every year[3] and the internal environment in terms of thermal comfort achieved and ambiance created can be indiscernible from that found in a new building. There is much less prejudice against concrete buildings than there used to be. Whilst problems with concrete buildings can exist, such as high alumina cement (HAC), and corrosion of reinforcement (see Refurbishment of concrete buildings: Structural and services options)[1], these problems are well known and consultants have much experience in overcoming them. There are many examples of successfully refurbished concrete buildings, as illustrated in the case studies at the end of this guide. There are a number of improvements that can be made to concrete buildings, including: ♦ ♦ ♦ ♦ ♦ adding solar shading reducing floor loadings by removing floor screed adding lift shafts, risers, and escalators improving ventilation and air conditioning extending floor plates, perhaps adding 20% to net lettable area ♦ adding additional floors. "Refurbishment of concrete buildings is not just bread and butter work - there are some very interesting things that you can do with them" Nick McMahon. THE IDEAL OFFICE BUILDING ♦ In order to decide whether to refurbish or demolish a building it is worthwhile considering what is required from an office. The ideal building has to satisfy many requirements. It must be in the correct location to express corporate image as well as providing adequate transport links for the workforce. It must provide a comfortable internal environment and be flexible in layout to allow for future organisational changes. From the owner’s viewpoint it must maximise rental income or building asset value. Location is the principal factor and city centres remain favourite for offices, despite the downsizing and re-organisation of businesses in the 1980s and early 1990s that led to many relocations to out-oftown developments. Such relocations were encouraged by the availability of car parking and the avoidance of congestion. Out-of-town developments have recently been limited through a combination of factors including: ♦ recent stringent planning restrictions ♦ Government encouragement for regeneration of urban centres through re-use of brownfield sites ♦ expected Government measures to reduce the use of private transport and car parking spaces. These are further reinforcing town and city centres as the first choice for companies when relocating. In a recent survey on behalf of The Royal Institution of Chartered Surveyors (RICS)[3], availability of car parking, flexibility of floor plates for fit out, the indoor working environment and proximity to transport links were cited as the top four criteria affecting tenants' choice of office properties. When selecting office space, 2 Refurbishment of concrete buildings - The decision to refurbish businesses require flexible space that can respond to organisational changes and business developments. The growing importance of the need to optimise use of business space and the environmental conditions within it is demonstrated by the growth of facilities management as a profession. Methods of working within offices are also changing. Work-forces often consist of teams of workers who come together to complete particular projects in a horizontal structure rather than the vertical hierarchy that was previously favoured. This is reinforced in businesses where downsizing has resulted in more flexible staff that operate in well trained, adaptable groups rather than rigid, departmentalised sections. This style of working necessitates workspace that can allow for future changes in layout and usage and particularly favours column free, open plan spaces with few cellular offices. It also means that rents can be increased because more people can be accommodated per square metre. The indoor environment is also important and employers attach great importance to keeping staff happy, motivated and productive. Environmental comfort is thus of prime concern, together with the provision of office space that is clean, modern and aesthetically pleasing. When selecting office space, businesses require flexible space that can respond to organisational changes and business developments Environmental comfort is of prime concern © BSRIA GN 7/99 A WHY REFURBISH? The gross floor area of a new building on a brownfield site is likely to be significantly less than the building it replaces due to planning restrictions. Many occupied buildings do not meet the ideal criteria. Whilst some elements are not changeable, such as location, other aspects can be readily upgraded to improve working and organisational conditions as well as to maximise asset/rental income value. However, not all refurbishment work will be financially viable and every case requires individual assessment. Nonetheless, it is increasingly found that refurbishments do provide more than adequate returns on investment (see Levels of refurbishment and costs on page 4). Table 1 shows characteristics of different building types and how these can affect refurbishment. Table 1: Characteristics of different building types Period 1900 - pre WWII Advantages May have high ceiling. Designed for natural ventilation. Narrow floor plate aids this. Add solar shading and spot cooling in high heat gain areas. Heating, power and communications routed around perimeter. Late 1950s/1960s Open plan layout. Designed for natural ventilation. Narrow floor plate aids this. Add solar shading and spot cooling in high heat gain areas. Heating, power and communications routed around perimeter. 1970s Larger floor-floor height than 1960s (for services). Deep plan, a disadvantage due to need for air conditioning and artifical lighting. Open plan layout. Larger floor-floor height. Raised floor for services. Open and deep plan layout. High electrical power capacity. 1980s The alternative to refurbishment of an existing building is to demolish it and build a new one. This, however, is costly in monetary and environmental terms (through the use of raw materials), as well as in terms of the extended time period required to obtain planning permission, demolish and re-build. Further, planning permission is likely to severely limit replacement buildings in terms of height; plot ratio, number of parking spaces allowed, etc. A further benefit of refurbishment is that it may be possible to phase the refurbishment so that part of the building remains occupied, thus generating income. It should also be remembered that refurbishment is significantly less time-consuming than demolition and rebuilding, perhaps taking two thirds of the time. When the cost of finance and the loss of rental income are taken into account this represents a significant sum. The principal reason for refurbishment is to maximise income or asset value. The survey carried out on behalf of RICS [3] suggests that a typical 1960/70s speculative office in a central prime site that had been comprehensively refurbished both © BSRIA GN 7/99 Disadvantages May be listed building (delays due to negotiation with English Heritage). Structural partitions - inflexible space, poor circulation, poor insulation. Low floor loading (may not accommodate current loads without strengthening). Low floor-floor height. Large glazed areas leading to high heat gain. Low floor loading (may not accommodate current loads without strengthening). Relatively lightweight partitioning. Poor insulation and high air infiltration rates. Single glazing. Addition of raised floor complicated around lifts and stairwells. Routing ducts and pipework may be difficult. Lightweight construction. Possible high air infiltration through facade, poor insulation. High heat gain through fully glazed facades. Lightweight construction. Over-specified ventilation and air conditioning - difficult to control. internally and externally could increase the letting value by 16 - 20%, from £25/ft 2 (£270/m2) to £30/ft 2 (£323/m2). The variation in letting value ranged from an increase of 6% to an increase of 30%, depending upon geographic area. Such rental increases easily offset the loss of rental income during refurbishment. Table 2 shows the typical costs and times to recoup the investment for different refurbishment levels based on the improvements in rental income obtainable. This is based on previous surveys[3,4] and consideration of cost breakdowns given in journal articles on refurbishment. Further benefits may be obtained from capital allowances that can potentially be claimed for the construction or acquisition of building services plant as well as where alterations are carried out to facilitate installation of plant. This might include demolition of a wall or creation of a hole in a slab for ductwork. Phased refurbishment can be carried out whilst the building is still occupied. Refurbishment of concrete buildings - The decision to refurbish 3 A Table 2: Levels of refurbishment Type Cost £/m 2 Minor/ cosmetic 170 - 400 Approximate time to carry out (months) 1-3 Services 200 - 400 3-6 Structural 150 - 400 2-6 Major 500 - 700 2 - 12 Complete 800 - 1500 6 - 18 New build 800 - 1500 18 - 24 Approximate Description payback period (years) 2-5 This will involve re-decorating, improving signage and lighting, replacing floor coverings, exterior painting and repair, minor changes to the fittings. Typically takes place at 5-year intervals. 5 - 15 Complete replacement of heating, ventilation and air-conditioning plant. Associated pipework, ducting, terminal units, controls and insulation may be replaced or upgraded as necessary. Typically takes place at 25-year intervals (control systems more frequently). 5 - 15 Addition of new lift shaft, escalators or risers, necessitating structural alterations. 5 - 15 This will involve major changes to the services and the interior fittings but without any significant structural alterations. May include addition of raised floor, improvements to core areas and entrance halls, new lighting, internal shading. Typically takes place at 25-year intervals and in conjunction with a lease renewal. 10 - 30 This will involve significant structural alterations, such as extension of the floors or partial demolition to create an atrium or stripping of the building back to the concrete frame. New cladding may be fitted together with the installation of new services and full fitting out. Timing of a complete refurbishment is variable but likely to take place in conjunction with a lease renewal. 10 - 30 Construction of a new building, excluding demolition of an existing building and loss of rent. The principal issues to be considered to maximise income or asset value as part of a refurbishment are: ♦ Aesthetics ♦ Need to upgrade services ♦ Change of use ♦ Change in Regulations ♦ To attract new tenants/retain existing tenants ♦ To increase net lettable area Aesthetics The appearance of a building is particularly important. A poor exterior or interior appearance will influence the market perception of the building and will deter many companies from taking a tenancy. Refurbishment, possibly only of parts of the building such as the facade or the entrance and other public areas, will overcome this. Need to upgrade services A poor working environment caused by ineffective air conditioning, heating or ventilation will require replacement of, or addition to, existing plant. This requirement may also be brought about by increased heat gains in the building, perhaps demanding the use of air conditioning. The introduction of air conditioning can also eliminate unacceptable external noise. Alternatively, cooling requirements may be reduced in areas where solar shading and more efficient, modern office equipment and lighting are provided. These reduced heat gains may eliminate the need for air conditioning, thus reducing capital costs. 4 Refurbishment of concrete buildings - The decision to refurbish Refurbishment of services will provide the opportunity for a more energy efficient building with consequent running cost savings and reduction in whole life costs. Consideration of whole life costs is of increasing importance to building owners who are beginning to be concerned by the operating costs of their buildings. Building energy usage and associated cost may be an area that is significantly affected by future legislation. Other reasons for building services refurbishment relate to the upgrading of electrical services and office communications to meet changing business needs and the upgrading of other systems such as lifts or escalators, fire detection, security and building management to provide greater functionality. © BSRIA GN 7/99 A Change of use Many refurbishments are brought about by changes in organisational requirements. Space needs are constantly changing as whole companies, departments, and teams of workers expand and contract. This leads to internal moves taking place, at which point the decision is made to refurbish while the space is clear. Other changes of use relate to conversion of parts of a building to other uses, such as storage areas to office space, or offices to dining areas. Common changes of building use Office to: Warehouse to: gallery office residential Hotel to: Complete changes of building use are growing in number. Over-supply of office space during the first half of the 1990s left many offices unlettable. However, many of these buildings can now meet a market need for residential, hotel and leisure buildings with the increased rental income or asset value paying for the conversion. This has been aided by the regeneration of many urban areas, making previously undesirable areas attractive. The survey by RICS [3] states that up to 30% of all redundant office property in UK cities could be converted to other uses, with over 50% being suited to residential use, approximately 18% for hotel use and 8% for retail. The survey also showed that property owners estimated that approximately 4% of their office space would be converted to other uses over the next two years. Change in Regulations There are many national Regulations and local Acts that apply to building refurbishment. From the structural point of view, there may be a requirement for increased design floor loading. Services-related regulations include those imposed by the Workplace (Health, Safety and Welfare) Regulations, 1992 which applied retrospectively to all existing buildings from 1996 and required, for example, lighting, heating and ventilation to meet minimum prescribed standards. To increase net lettable area One way of greatly enhancing the value of a building is to be able to collect more rent from it. This can be achieved by increasing the net lettable floor area. Methods of doing this include building an extension or adding extra floors, moving service cores to the outside of the building or extending floor plates. ♦ improve appearance ♦ improve efficiency ♦ utilise space © BSRIA GN 7/99 hotel retail residential office To attract new tenants/retain existing tenants One of the primary reasons for refurbishment is to attract new tenants or to retain existing tenants, particularly when a current lease is about to expire. In some cases this may be at intervals of 5 years or less. Leases arranged after 1992 are on better terms for tenants, typically with a break clause every 5 years to allow for changing tenant requirements. In addition, there is currently an excess of office space in many areas and it may be difficult, or even impossible, to lease out un-refurbished property. In general terms, the owner of a poor standard building, either from the point of view of its appearance or its services, can only expect a low rental. Factors affecting rental income are given on page 1. Reasons for refurbishment ♦ ♦ ♦ ♦ ♦ ♦ to attract a new occupier (97%) to retain existing tenants/occupiers (90%) to increase yields (86%) to accommodate new services (73%) statutory requirements (44%) to improve energy efficiency (33%). Taken from a survey by RICS Refurbishment in the office sector 1997/8[3]. The figures in brackets give percent of respondents indicating factor is 'important' or 'very important' from a choice of four categories. ♦ meet new regulations ♦ refurbish to attract new tenants ♦ extend to increase lettable area Refurbishment of concrete buildings - The decision to refurbish 5 A CASE STUDIES The following case studies illustrate a number of points concerning refurbishment and show the practicality of reviving 1960s and 1970s buildings. Full accounts are given in Refurbishment of concrete buildings: Structural and services options [1]. City Point, London, EC2: 36 storey building extends floor area by 20% ♦ 36-storey concrete frame building with ribbed slabs built in 1964 ♦ building stripped to frame ♦ existing screed removed, reducing floor load by 1 kN/m2, allowing addition of 100 mm raised floor ♦ extension of floor plates by 1 m allowed addition of extra floor area ♦ new ducts for services provided by removing ribs to create the required hole size. Courtesy of Sheppard Robson International. 1 Neathouse Place, London: Maximisation of lettable space and improvement of the quality of the office environment ♦ 12-storey concrete framed structure built in 1959 ♦ drab facade, no air conditioning and too many structural walls for a desirable, modern office building ♦ floor loading minimised by removing 60 mm screed ♦ floor space maximised by replacing the spine shear wall with a steel support system ♦ inner staircases removed and new plant rooms, staircase and toilets added externally ♦ structure re-clad in glass giving dramatic views from inside the building, good light penetration and air extraction routes along the perimeter of the building at every level ♦ air conditioning provided by air treatment modules located away from the offices to maximise net lettable area Photo, courtesy of Palladin Publications ♦ the approximate capital cost for all the work was £18 million (£135/ft 2 or £1500/m2). Courtesy of Chesterfield Properties, Avery Associates, Buro Happold, YRM(E). 6 Refurbishment of concrete buildings - The decision to refurbish © BSRIA GN 7/99 A Howard House, Bristol: Conventional office building undergoes services refurbishment to improve lettable value ♦ 7-storey office building constructed in 1975 with a floor area of 31,000ft 2 ♦ in situ concrete frame structure with precast concrete cladding panels and double glazed windows ♦ services within the building had reached the end of their life ♦ capital and running costs of replacing low level perimeter induction system not justifiable by rent obtainable ♦ internal environment now controlled using a combination of natural ventilation via existing openable windows and a quasi displacement ventilation system using the existing ductwork ♦ induction units removed, increasing net lettable floor area by 2,000ft 2 (6.5%) ♦ refurbishment work, including new power and communications wiring, new heating plant and distribution system and new fire alarm system, cost approximately £25/ft 2 (£270/m2). Courtesy of Dorset County Council Pension Fund, King Sturge, RSW plc, Sure Foundation Building Services Ltd and Latter Ramsay Partnership. Normanby College, Kings College Hospital, London: Extra floor added ♦ Normanby College was constructed during the early 1970s ♦ steel plate bonding rejected due to technical and handling difficulties ♦ extra floor added on top of the reinforced concrete ribbed roof slab ♦ strengthening work took 4 weeks at a cost of approximately £60,000 (£7/ft 2 or £80/m2). ♦ strengthening with carbon fibre composite strips doubled the live load capacity of the slab Courtesy of Kings Healthcare NHS Trust, John Mowlem Construction plc, Concrete Repairs Ltd, Sika Ltd . Boots D10 building, Nottingham: 1930s concrete factory partially converted to office accommodation ♦ fully glazed southern facade led to summer overheating and winter overcooling ♦ English Heritage required the facade appearance to be maintained ♦ original single glazing replaced with double glazing and internal blinds were added in the office area ♦ floor screed removed to allow addition of raised floor in office area ♦ services pipework left exposed on ceiling slab Photo, courtesy of Architects Journal ♦ the approximate cost of the work was £1500/m2. Courtesy of AMEC Design and Management and Boots Ltd. © BSRIA GN 7/99 Refurbishment of concrete buildings - The decision to refurbish 7 A ACKNOWLEDGEMENTS This project was carried out jointly by the British Cement Association (BCA) and the Building Services Research and Information Association (BSRIA) with additional contributions from the Reinforced Concrete Council (RCC), Dr Tony Jones (formerly BCA), and independent consultant Dr John Clarke. The work was carried out under the Department of the Environment, Transport and the Regions 'Partners in Technology' programme DETR Ref 38/13/22 (cc. 1399). The project was managed on behalf of the DETR by FBE Management Ltd. The steering group comprised representatives from Buro Happold, Monodraught Ltd, Nick McMahon Ltd, Ridd Wood Partnership and Sure Foundation Building Services Ltd. Department of the Environment, Transport and the Regions. DISCLAIMER All advice or information from the Building Services Research and Information Association and the British Cement Association is intended for those who will evaluate the significance of its contents and take responsibility for its use and application. No liability (including that for negligence) for any loss resulting from such advice or information is accepted. REFERENCES 1 GOLD C A, MARTIN A J. Refurbishment of concrete buildings: Structural and services options. Guidance Note GN 8/99. BSRIA 1999. ISBN 0 86022 526 7. 2 GOLD C A, MARTIN A J. Refurbishment of concrete Buildings: Designing now for future re-use. Guidance Note GN 9/99. BSRIA 1999. ISBN 0 86022 527 5. 3 Refurbishment in the office sector 1997/8. The Connaught Report. The Royal Institution of Chartered Surveyors. 1997. 4 KENDRICK C, MARTIN A, BOOTH W. Refurbishment of air-conditioned buildings for natural ventilation. Technical Note TN 8/98. BSRIA 1998. ISBN 0 86022 498 8. Further information from: BSRIA Publication Sales Tel: + 44 (0) 1344 426511 Fax: + 44 (0) 1344 487575 and BCA Publication Sales Tel: +44 (0) 1344 725704 Fax: + 44 (0) 1344 761214 B ISBN 0 86022 525 9 The Building Services Research and Information Association Old Bracknell Lane West, Bracknell, Berkshire RG12 7AH UK Tel: + 44 (0)1344 426511 Fax: + 44 (0)1344 487575 e-mail: [email protected] www.bsria.co.uk Printed by Oakdale Printing Co September 1999 79910