* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Download R-MAG®Medium Voltage Tank Vacuum Magnetic
Control system wikipedia , lookup
Spark-gap transmitter wikipedia , lookup
Three-phase electric power wikipedia , lookup
Pulse-width modulation wikipedia , lookup
Power inverter wikipedia , lookup
Ground (electricity) wikipedia , lookup
Electrical ballast wikipedia , lookup
Power engineering wikipedia , lookup
History of electric power transmission wikipedia , lookup
Resistive opto-isolator wikipedia , lookup
Current source wikipedia , lookup
Immunity-aware programming wikipedia , lookup
Variable-frequency drive wikipedia , lookup
Earthing system wikipedia , lookup
Power MOSFET wikipedia , lookup
Power electronics wikipedia , lookup
Schmitt trigger wikipedia , lookup
Resonant inductive coupling wikipedia , lookup
Voltage regulator wikipedia , lookup
Stray voltage wikipedia , lookup
Surge protector wikipedia , lookup
Voltage optimisation wikipedia , lookup
Distribution management system wikipedia , lookup
Alternating current wikipedia , lookup
Electrical substation wikipedia , lookup
Circuit breaker wikipedia , lookup
Opto-isolator wikipedia , lookup
Ignition system wikipedia , lookup
Buck converter wikipedia , lookup
1VAL255104-MB Rev D R-MAG®Medium Voltage Outdoor Dead Tank Vacuum Magnetic Circuit Breaker Instruction Manual 38kV 1250/2000A Table of Contents 1. 2. 3. SAFETY NOTICES.......................................................................................................... 4 INTRODUCTION ............................................................................................................. 5 RECEIVING, HANDLING AND STORAGE...................................................................... 5 3.1 Receiving Inspection .................................................................................................... 5 3.2 Handling ...................................................................................................................... 5 3.3 Storage ........................................................................................................................ 6 4. GENERAL DESCRIPTION .............................................................................................. 6 4.1 High-Voltage Assembly ................................................................................................ 6 4.2 Housing ....................................................................................................................... 7 4.3 Magnetic Actuator ........................................................................................................ 7 4.4 Actuator Controller ....................................................................................................... 7 5. STANDARD PRODUCTION TESTS................................................................................ 7 6. OPERATION ................................................................................................................... 8 6.1 Closing......................................................................................................................... 8 6.2 Opening ....................................................................................................................... 8 6.3 Manual Trip Handle Operation ..................................................................................... 8 7. OPERATIONAL CHECK PRIOR TO INSTALLATION (ELECTRICAL CLOSE/OPEN) .... 9 8. INSTALLATION ............................................................................................................... 9 8.1 Mounting ...................................................................................................................... 9 8.2 Grounding .................................................................................................................... 9 8.3 Arrester Protection ......................................................................................................10 8.4 Control Power .............................................................................................................10 8.5 Final Inspection...........................................................................................................10 9. INSPECTION, MAINTENANCE AND ADJUSTMENT .................................................... 11 9.1 Maintenance Steps .....................................................................................................11 9.2 High-Pot Test ..............................................................................................................12 9.3 Measuring Contact Travel ...........................................................................................12 10. 38 kV R-MAG ELECTRICAL SPECIFICATIONS ........................................................... 24 10.1 Typical Current Transformer Connections ...............................................................26 10.2 Auxiliary Switch Current Specifications ....................................................................27 10.3 Control Board Voltage Requirements ......................................................................27 10.4 Breaker Nameplate .................................................................................................28 11. RENEWAL PARTS ........................................................................................................ 28 12. PRODUCT RECYCLING ............................................................................................... 28 APPENDIX A ............................................................................................................................ 29 2 Table of Figures Figure 1 Hazardous Voltage Nameplate .................................................................................... 4 Figure 2 Lifting Detail ................................................................................................................. 6 Figure 3 Trip Handle Position Sticker ......................................................................................... 8 Figure 4 Interrupter Assembly 38 kV, 1250 A ............................................................................15 Figure 5 Interrupter Assembly 38 kV, 2000 A ............................................................................16 Figure 6 Trip Handle .................................................................................................................17 Figure 7 ABB RMAG Vacuum Interrupter Electrical Switching Life Curves (31.5 kA) .............18 Figure 8 ABB RMAG Vacuum Interrupter Electrical Switching Life Curves (40 kA) ................19 Figure 9 High Voltage Cabinet Layout .......................................................................................20 Figure 10 Typical Schematic Diagram.......................................................................................21 Figure 11 Typical Outline, 1250 A .............................................................................................22 Figure 12 typical Outline, 2000 A ..............................................................................................23 Figure 13 Breaker Nameplate .................................................................................................. 28 List of Tables Table 1 RMAG 38 kV, 31.5 kA Ratings ....................................................................................24 Table 2 RMAG 38 kV, 40 kA Ratings ......................................................................................25 Table 3 Typical Current Transformer Connections ....................................................................26 Table 4 Auxiliary Switch Current Specifications.........................................................................27 Table 5 Control Board Voltage Requirements ..........................................................................27 All sales are subject to ABB INC. General Terms and Conditions of Sale. While every effort has been made to assure accuracy, the information in this document is subject to change without notice © Copyright 2012 ABB INC. All rights reserved. Install the RMAG® breaker within the design limitations as described on its nameplate and in these instructions. Follow your company’s safety procedures and all applicable laws, regulations and standards whenever the equipment is being installed, operated, maintained and/or repaired. This breaker should not be used as the sole means of isolating a high voltage circuit. For the safety of personnel performing maintenance operations on the breaker or connecting equip ment, all components should be electrically disconnected by means of a visible break and should be securely grounded prior to working in the high voltage or low voltage compartment. This product is intended to be operated and maintained by qualified persons, thoroughly trained and knowledgeable of the hazards involved. This publication is written only for such qualified persons and is not intended to be a substitute for adequate training and experience in the safety procedures for this device. Detailed descriptions of standard repair procedures, safety principles and service operations are not included. It is important to note this document contains some warnings and cautions against some specific service methods that could cause personal injury to service personnel, damage equipment, or render it unsafe. These warnings do not cover all conceivable ways in which serv ice, whether or not recommended by ABB, might be performed or the possible hazardous consequences of each conceivable way, nor could ABB investigate all such ways. Anyone using service procedures or tools, whether or not recommended by ABB, must satisfy himself thoroughly that neither personal safety nor equipment safety will be jeopardized by the service method or tools selected. All information contained in this manual is based on the latest product information available at the time of printing. The right is reserved to make changes at any time without notice. These instructions do not attempt to provide the user of this equipment with every possible diffi culty that may occur in the application, operation and maintenance of the product. Also, as improvement in parts and assemblies are made, some parts may differ in appearance as depict ed in the illustrations; however, functionality will be equivalent. The Type RMAG breaker is a highvoltage, threephase device incorporating three vacuum interrupters, gang operated by a magnetic actuator. Together with the optional relaying and current transformers, the breaker will sense an overload and automatically open. Satisfactory performance of the breaker is contingent upon correct installation of the breaker, and adequate maintenance and service of the breaker. Careful study of these instructions will permit the user to obtain maximum benefit from this device. Each breaker is assembled and tested at the factory prior to shipment. This equipment was packed and shipped in factory new condition. If damage is noted, call the carrier at once for inspection and request an inspection report. File a formal claim with the carri er, supported with paid freight bill, inspection report and invoice. The local ABB Sales Office must be notified. This must be done within 10 days of receipt or receiver assumes all responsibility for damage. Upon receipt, it is important to inspect promptly to be certain that the correct material has been received. In case of shortage, immediately notify the local ABB Sales Office. Check all parts against the shipping list as they are unpacked. Instructions and literature packed with the breaker should be kept with the unit. The cabinet provides a convenient place to keep this instruction book, a copy of the schematic, connection diagram and the breaker test report. Additional copies of these documents may be obtained upon request from the local ABB Sales Office. If the breaker is not to be placed in service immediately, it is essential that proper care be exer cised in the handling and storage to ensure good operating conditions in the future. (see section ) The RMAG breaker comes with two brackets attached to the sides of the cabinet which provide for lifting the breaker. A twopoint lift is recommended using these brackets. (see ) For prolonged storage, indoor storage is recommended. The mechanism and control compartment is equipped with heaters to reduce condensation. The highvoltage section of the RMAG breaker consists of three individual phase assemblies. Each phase of the RMAG consists of a single vacuum interrupter, flexible shunt and operating rod. The doors of the breaker housing are removable and retained by hinge pins. The position indicator is visible through the rear door. The breaker nameplate showing rating information, serial number and shop order number is mounted on the side of the housing. The magnetic actuator incorporates a very powerful permanent magnet assembly. When the armature is in contact with the upper plate, the magnet produces a holding force in excess of 2700 lbs. The actuator connects to the crankshaft through a coupling connected to the upper end of the actuator shaft. The manual trip is decoupled from the actuator shaft and is controlled by its own stored spring energy being released against a dedicated lobe on the crankshaft. The magnetic actuator has no user serviceable parts and therefore no lubrication or mainte nance is required. Should an actuator fail to operate, please immediately contact ABB for service. The permanent magnets inside the actuator are extremely powerful, with the potential to trap fingers. The actuator control board in the RMAG breaker consists of a power supply, position indication, switching assembly and capacitor charging system. Refer to Appendix A for an overview of the actuator controller. Standard production tests include: 1. Verification of all wiring per connection diagrams. 2. Electrical Operation: Close and trip. Overcurrent response and automatic closing, with relaying control option. 3. Functional check of all manual controls: Local/remote, nonreclosing, ground fault bypass, etc. 4. Current Path Resistance Test: Three readings are made on each phase of the breaker using a Biddle “Ductor”. Typical values do not exceed 150 micro ohms. 5. Voltage Withstand: The complete breaker is tested between live parts and tank, across open contacts and between phases. In compliance with ANSI C37.09 and IEC, an AC dielectric withstand test at 80 kV is performed. Test duration is one minute. 6. Wiring Insulation: The terminal block connections are given an overpotential test of 1800 volts AC to ground (for 1 sec). In the open position, the magnetic actuator’s armature rests against the bottom plate in the actuator assembly. The armature is held there by the force developed by the magnet. When the top coil is energized, the magnetic flux generated is in the same direction as the magnet assembly. The armature is drawn into the coil and brought into contact with the upper plate. In this position, the coil is deenergized and the armature is held in position by the magnets alone. As the armature is drawn into the coil, the operating rod, which is attached to the top guide rod, moves the moving contact of the vacuum interrupter towards the closed position. The actuator has more stroke than the vacuum interrupter and the interrupter contacts make contact before the actuator has completed the stroke. The additional movement of the operating rod after the contact closing causes the contact pressure spring to compress at the top of the operating rod. This wipe allows for contact wear in service. When the bottom coil is energized, the magnetic flux opposes the force generated by the magnet assembly. This reduces the holding force, the armature is released and the coil attracts the armature to the bottom plate. Once there, it is held open by the magnet. The trip handle for the 38 kV RMAG has two states: Normal and Trip/Close Block, which are described below in further detail. The breaker should be tested for mechanical and electrical operation before delivery to the installation site. Make the necessary control power connections. Open the door of the low voltage compartment to observe the mechanical operations. A manual trip handle is provided on the outside of the cabinet. (see Observe the positionindicator located on the front of the actuator cover plate. If the panel is green, the breaker is open, and if the panel is red, the breaker is closed (on breakers configured per IEEE standard). To perform a close or open, ensure the “Ready” light is illuminated above the Close (1) and Open (0) buttons. Press the appropriate button firmly; keeping hands and loose clothing clear of operating linkages. If the breaker is already open, nothing will happen when the open button is pressed. If the breaker is already closed, nothing will happen when the close button is pressed. In the event of a malfunction or loss of source voltage, the “Ready” light will not be illuminated. The breaker must be vertical, level and securely fastened. Follow your company guidelines and codes for setting the height of the breaker, securing the frame to the pole or foundation, and making connections. The breaker is normally shipped suitable for substation mounting. The following is the recom mended installation procedure. Substation Mounting: 1. With the lifting brackets mounted to the breaker roof, lift the breaker off the pallet and move into desired position. 2. Bolt the legs to the pad and raise the upper portion to the desired height. 3. Bolt the legs to the sides of the breaker. 4. Install “X” braces on all sides of breaker.(see 5. Make sure all hardware is securely tightened. The breaker cabinet includes a standard NEMA twohole stainless steel pad on both side sheets, legs, and on the roof (optional) for grounding. To ensure proper operation of the actuator controller, the side sheet where the actuator controller is mounted must be grounded to the ground grid. For personnel safety it is recommended that the opposite side sheet is also grounded. Ground connections should be made using #6 or larger. If there is ground pad is on the roof, it should also be grounded to the side sheet. ABB recommends that surge arresters be properly applied in the substation. Supply the control power as indicated on the wiring diagram. Verify connections for the heaters before applying power. For breakers not equipped with DINRail style connectors, check all terminal block connections for proper tightness. For details of the overall control circuit, refer to the specific wiring diagrams supplied with the breaker. After installation has been completed and prior to energizing the breaker, the following points of inspection are recommended: 1. Ensure the breaker is properly leveled and securely anchored. 2. Make a final check of tightness of all hardware. 3. Check that the heaters work. 4. Verify that all barriers in high voltage compartment are in place (if removed during inspection) 5. Securely tighten terminal and ground connections. 6. An A/C HiPot test should be performed to verify the vacuum integrity. A successful withstand indicates satisfactory vacuum integrity. Replace interrupters that fail to maintain voltage across the open contacts. Please contact the factory for interrupter replacement. Refer to section for procedure. 7. Make a continuity check, preferably one measuring contact resistance. Measure contact resistance with suitable equipment rated not less than 100 A. The resistance value should not exceed 150 micro ohms. 8. Check control cable entrance fittings for tightness. 9. Operate the breaker from the control box to verify normal operation. 10. Secure all doors and ensure proper gasketing for weather, if supplied. 11. Ensure that all tools are removed. 12. Confirm that all high voltage test connections have been removed. The RMAG breaker is an extremely simple device and requires minimal maintenance, depending on the frequency of operation and local environmental conditions. The safety and successful functioning of any apparatus or system connected with the breaker largely depends on the proper and reliable operation of the unit. To provide long reliable service, the breaker must have systematic inspections at regular inter vals. Operating experience based on environmental conditions, the number of operations, mag nitude of current and any unusual operation, will establish a maintenance schedule that gives assurance of proper breaker reliability. The following check list is a minimum guide: 1. Check the phase assemblies for external damage and clean if contamination is evident. 2. Lubricate wear points and all pins in linkage assemblies with grease (Use only Dow Corning 55 silicone lubricants). 3. Verify that the breaker operates correctly using the electrical controls. 4. An AC HiPot test can be performed to verify the vacuum integrityRefer to section for procedure. A successful withstand indicates satisfactory vacuum integrity. Replace interrupters that fail to maintain voltage across the open contacts. Please contact the factory for interrupter replacement. 5. 6. Check heaters to verify proper operation. 7. When inspecting breaker, verify torque on current carrying parts are within tolerances: .500 13 (or 12mm) threaded bus connections. 6580 ftlbs 1. With the breaker in the open position, jumper both sets of three top terminals (bushings 13 5 together and bushings 246 together). Ground one set of terminals and the housing. Connect the high voltage to the other set of terminals. See Figure 11 and Figure 12 A for positioning. 2. Stand clear more than one meter from the breaker before energizing the high voltage source. 3. Do not exceed 64 kV. Test duration is one minute. 4. If internal flashover occurs, isolate the phases and test each one independently to identify the defective interrupter. Any defective pole assembly must be replaced prior to the breaker being placed in service. The desired overtravel (wipe) for 38 kV RMAG breakers should be within 0.157 in – 0.177 in (4.0 mm – 4.5 mm). The following steps must be performed to measure the contact travel. 1. The faceplate from the mechanism covers one of the rod’s ends. Remove the front panel to access the rod. 2. Connect the transducer to the rod’s end as shown below: 3. Connect the transducer to the motion analyzer. ABB utilizes a Kocos – ACTAS P14: 4. Connect the AMP meter to the actuator coil cables: 5. Connect the Kocos to the breaker contacts/bus: 5. If the result is different from the suggested range of 0.157 in – 0.177 in (4.0 mm – 4.5 mm), turn the pushrod’s end clockwise to increase wipe, or counterclockwise to decrease wipe, depending on the adjustment needed to achieve a measurement within the specified range. 100000 10000 1000 100 10 0.1 1 10 100 100000 10000 1000 100 10 0.1 1 10 100 Parameter Rated Maximum Voltage Voltage Range Factor, K Rated Continuous Current Temperature Range Dielectric Strength Dry 60Hz 1 minute Wet 60Hz 10 sec Full Wave Withstand Chopped Wave Withstand Minimum Creep to Ground ANSI Operating Duty Interrupting Time Permissible Tripping Delay (Y) Reclosing Time Interrupting Ratings Symmetrical RMS Asymmetrical RMS Short Timefor Current TRV Peak 100% Terminal Faults TRV Peak to forPeak 100%(T2) Terminal Faults TRV Time TRV Time to Peak (T2) Peak Withstand Current (Same as Close and Latch) Peak Withstand Current (Same asconstant Close and Latch) D.C. Component (referred to time = 45ms D.C. Component (referred to time constant = 45ms Short Line Fault Short Fault Out ofLine Phase Switching Current Out of Phase Switching Double Earth Fault (IEC)Current Double Earth Fault (IEC) Load Current Switching Load RatedCurrent Back toSwitching Back Switching (Class C1) Rated Back to Back Switching Rated Transient Inrush Current(Class peak C1) Rated Transient Inrush Inrush Current peak Rated Transient Frequency Rated Transient Inrush Frequency Rated Isolated Capacitor Bank Current (Class C1) Rated Isolated Capacitor Bank Current C1) Rated Overhead Line Switching Current(Class – ANSI (Class C1) Rated Overhead Line Switching Current – ANSI Rated Cable Switching Current (Class C1) (IEC) (Class C1) Rated CableLife Switching Current (Class C1) (IEC) Mechanical Mechanical Life NoLoad Mechanical (IEC M2) No-Load Mechanical Between Servicing (IEC M2) Between Servicing Continuous Current Switching Continuous Current Switching Inrush Current Switching Inrush Current Switching Seismic Rating (per IEEE 6931997; exceeds previous zone 4 category) Seismic Rating (per IEEE 693-1997; exceeds previous zone 4 category) Rating 38kV 1.0 1250A/2000A* 40C to +40C -40C 80kV 75kV 200kV 258kV 33" O0.3sCO3MinCO**** O-0.3s-CO-3Min-CO 3.0 Cycles 2 seconds 0.3 seconds 31.5kA 36.2kA 31.5kA 71.1kV 71.1kV 63sec 63µsec 81.9kA 81.9kA 40% 40% 28.35kA 28.35kA 7.88kA 7.88kA 27.4kA 27.4kA 1250A/2000A 1250A/2000A 630A 630A 20kA 20kA 4240Hz 4240Hz 630A 630A 100A 100A 50A 50A 10,000 10,000 2000 2000 10,000 10,000 200 200 High High *Continuous current tested at +40C ambient ** Operating duty conforms to old ANSI Standard (actual time can be CO15SecCO) Rated Maximum Voltage Voltage Range Factor, K Rated Continuous Current Temperature Range Dielectric Strength Dry 60Hz 1 minute Wet 60Hz 10 sec Full Wave Withstand Minimum Creep to Ground ANSI Operating Duty Interrupting Time Permissible Tripping Delay (Y) Reclosing Time Interrupting Ratings Symmetrical RMS Short Time Current TRV Peak for 100% Terminal Faults TRV Time to Peak (T3) Peak Withstand Current (Same as Close and Latch) D.C. Component (referred to time constant = 45ms Short Line Fault Out of Phase Switching Current Load Current Switching Rated Overhead Line Switching Current – ANSI (Class C1) Rated Cable Switching Current (Class C1) (IEC) Mechanical Life NoLoad Mechanical (IEC M2) Between Servicing Continuous Current Switching Inrush Current Switching Seismic Rating (per IEEE 6931997; exceeds previous zone 4 category) 38kV 1.0 1250A/2000A 40C to +40C* 80kV 75kV 200kV 33" O0.3sCO3MinCO** 3.5 Cycles 2 seconds 0.3 seconds 40 kA 40 kA 71.7kV 59sec 104kA 40% 36.1kA 10.5kA 1250A/2000A 100A 100A 10,000 2000 10,000 200 High *Continuous current tested at +40C ambient ** Operating duty conforms to old ANSI Standard (actual time can be CO15SecCO) X2X3 505 X2X3 1005 X1X2 1005 X1X1 2005 X1X3 1505 X1X3 3005 X4X5 2005 X4X5 4005 X3X4 2505 X3X4 5005 X2X4 3005 X2X4 6005 X1X4 4005 X1X4 8005 X3X5 4505 X3X5 9005 X2X5 5005 X2X5 10005 X1X5 6005 X1X5 12005 X3X4 3005 X3X4 3005 X1X2 4005 X4X5 5005 X4X5 5005 X3X5 8005 X2X3 8005 X1X2 10005 X2X4 11005 X2X3 12005 X1X3 12005 X2X4 15005 X1X4 15005 X2X5 20005 X2X5 16005 X1X3 22005 X1X5 20005 X1X4 25005 X1X5 30005 • • • Tested per UL Document 1054. AC tests specs with one set of contacts. DC tests specs with two sets of contacts in series. Contacts will carry 140 A for 3 seconds. Overload test – 50 operations at 90 A and 120 VAC. 24/48 VDC 16 16 20 125 VDC 10 10 20 250 VDC 5 5 20 115 VAC 15 15 20 230 VAC 10 10 20 BINARY INPUTS AC KM10051, 2 (INCLUDES TRIP AND CLOSE) 20.4 VOLTS TO 264 VOLTS OPENING COMMANDS CAN GO AS LOW AS 16.8 VAC 20.4 VOLTS TO 264 VOLTS OPENING COMMANDS CAN GO AS LOW AS 16.8 VAC BINARY INPUTS DC – KM10051 (INCLUDES TRIP AND CLOSE) 20.4 VOLTS TO 264 VOLTS OPENING COMMANDS CAN GO AS LOW AS 16.8 VDC **20.4 VOLTS TO 264 VOLTS OPENING COMMANDS CAN GO AS LOW AS 16.8 VDC AUXILIARY POWER AC KM10031 20.4 VOLTS TO 52.8 VOLTS 85 VOLTS TO 264 VOLTS AUXILIARY POWER DC KM10031 16.8 VOLTS TO 75 VOLTS 77 VOLTS TO 280 VOLTS The threshold for the binary inputs occurs at approximately 18 VDC or 19 VAC. The threshold for the protection relay input is approximately 7 VDC. 2 Binary input thresholds depend on filter card jumpers. (see Appendix A section Renewal parts are available exclusively from ABB. Contact your local ABB field sales office for the latest RMAG Spare Parts List. Definitions and regulations of hazardous materials are countryspecific and change when knowledge of materials increases. The materials used in this product are typical for electric and electronic devices. All parts used in this product are recyclable. When disposing of a RMAG or its parts contact a local waste handler who is authorized and specialized in disposing electronic waste including leadacid batteries. These handlers can sort the material by using dedicated sorting processes and dispose of the product according to the local requirements. Table of Contents 1. OVERVIEW ................................................................................................................... 32 2. CONTROL BOARDS AVAILABLE/MAGNETIC ACTUATOR COIL ENERGIZING CAPACITOR ............................................................................................................................. 33 3. BINARY INPUTS ........................................................................................................... 33 3.1 Remote Close (KM1005, CH 1, Pins 1 and 2) .............................................................33 3.2 Remote Open (KM1005, CH 2, Pins 3 and 4) .............................................................33 3.3 Auxiliary Open / Safe Open (KM1005, CH 3, Pins 5 and 6).........................................33 3.4 Protection Trip / Second Trip (KM1005, CH 4, Pins 7 and 8) ......................................34 3.5 Circuit Breaker Close Blocking (KM1005, CH 6, Pins 11 and 12) ................................34 3.6 Under Voltage Trip (KM1005, CH 7, Pins 13 and 14) ..................................................34 4. BINARY OUTPUTS ....................................................................................................... 35 4.1 Circuit Breaker Opened (KM1004 Pins 1 and 2) .........................................................35 4.2 Circuit Breaker Closed (KM1004 Pins 3 and 4) ...........................................................35 4.3 Circuit Breaker Auxiliary Open (KM1004 Pins 5 and 6) ...............................................35 4.4 Circuit Breaker Auxiliary Closed (KM1004 Pins 7 and 8) .............................................35 4.5 Unit Ready (KM1004 Pins 9 and 10) ...........................................................................35 4.6 Unit Not Ready (KM1004 Pins 11 and 12) ..................................................................35 4.7 Circuit Breaker Remote Open (KM1004 Pins 13 and 14) ............................................35 5. FEATURES ................................................................................................................... 37 5.1 Temperature Protection ..............................................................................................37 5.2 Actuator Close and Trip Coil Continuity Monitor ..........................................................37 5.3 Wrong Position Auto Trip ............................................................................................37 5.4 Energy Failure Auto Trip .............................................................................................37 5.5 Reduced Power Consumption ....................................................................................38 5.6 RS232 Port / JTAG Communication Port ...................................................................38 6. POWER CONSIDERATIONS ........................................................................................ 38 6.1 Discharging Storage Unit Capacitors ..........................................................................39 6.2 Capacitor Life..............................................................................................................39 6.3 Breaker Ready / Not Ready Binary Output Contacts and Ready Light Status .............40 7. STANDARD ACTUATOR CIRCUIT BOARD AND CONNECTION DIAGRAM ............... 41 8. CONTROL BOARD CONNECTORS ............................................................................. 42 9. DEFAULT JUMPER AND DIP SWITCH SETTINGS...................................................... 43 10. TROUBLESHOOTING FLOWCHARTS ......................................................................... 44 11. INSTRUCTIONS FOR TROUBLESHOOTING A CONTROL BOARD............................ 47 11.1 READY LIGHT IS OFF ............................................................................................48 11.2 SPECIFIC LINE ITEM CHECK IS SHOWN BELOW ...............................................49 12. INSTRUCTIONS FOR CHANGING OUT A CONTROL BOARD.................................... 52 List of Illustrations Apx Figure 1 Electrical System Block Diagram..........................................................................32 Apx Figure 2 Electrical Load Curves .........................................................................................37 Apx Figure 3 Standard Actuator Circuit Board and Connection Diagram ...................................41 Apx Figure 4 Standard Actuator Circuit Board and DIP Switch Settings ....................................43 Apx Figure 5 Ready LED Continually Flashing ..........................................................................44 Apx Figure 6 Ready LED Off .....................................................................................................45 Apx Figure 7 Conditions for CB Not Opening/Closing ...............................................................46 Apx Figure 8 Standard Actuator Control Board and Pin Assignments .......................................47 Apx Figure 9 Control Board with Terminal Numbering...............................................................54 Apx Figure 10 Control Board, Simplified....................................................................................54 Apx Figure 11 ED2.0 Control Board Parts and Mounting ..........................................................55 List of Tables Apx Table 1 DIP Switch Thresholds ..........................................................................................34 Apx Table 2 Output Contact Specifications ...............................................................................36 Apx Table 3 CB Operation vs. Available Capacitor Charge .......................................................38 Apx Table 4 Circuit Breaker Condition vs. Position ...................................................................40 Apx Table 5 KM1001 Breaker Position (CB Position) ..............................................................42 Apx Table 6 KM1002 Power Output and Capacitor Link .........................................................42 Apx Table 7 Breaker Troubleshooting Guide.............................................................................52 The actuator control board is comprised of a Power Supply Recharge Unit, Control Unit, and FET Switching circuit which connects the Storage Unit Capacitors to the Magnetic Actuator coils. The power supply recharge circuitry adapts whatever input voltage, within the specified range (see is supplied to maintain an 80 V charge voltage across the capacitors. The Control Unit monitors binary inputs and outputs, hardware and software configurations, auxiliary contacts, capacitor charge, and switches the FET circuit to connect the capacitor voltage to the Magnetic Actuator coils following an open or close command. The Capacitor Storage Unit consists of four 0.1 farad aluminum electrolytic capacitors connected in parallel to provide a total capacitance of 0.4 farads. When called to energize the Magnetic Actuator coils, the capacitors will deliver a peak current of up to 100A and a pulse width of 45 milliseconds for opening operations and 60 milliseconds for closing operations. The actuator control board system Block Diagram is given in 1. Low voltage full optional board (17 – 75 VDC or 20 – 52 VAC). 2. High voltage full optional board (77 – 280 VDC or 85 – 264 VAC). 3. 0.1 farad aluminum electrolytic capacitors. There is a removable filter card plugged into the control board. This filter card has five metal jumpers on the board. When these jumpers are cut the binary input threshold is raised by 20 Volts. It is recommended that these jumpers are cut for 125VDC applications. Binary input channels work properly with a voltage range of 24 to 264 VAC/DC regardless of which board is used. All inputs have a low threshold at about 18 VDC and 19 VAC with the exception of the Protection Relay input, which has a low threshold of 7 VDC. To avoid false triggering by noise, the inputs must be active for at least 6 milliseconds. The current draw for most inputs is < 2 milliamperes. The exception is the Remote Open and Remote Close inputs, which draw up to approximately 20 milliamperes. The input impedance (Z) is 300k except for binary inputs 1 and 2 (Remote Open and Remote Close) which are around 14 k input Z. There are seven different input channels. Only six of them are used for the RMAG breaker (channel 5 is not used). The Remote Close input is used to close the breaker remotely. The input impedance is approxi mately 15 k. The Remote Open input is used to trip the breaker remotely. The input impedance is approximately 15 k. When tripping with electromechanical relays, an additional resistor will be required to drop the trip flags. This input can be configured as either an Auxiliary Open function or a Safe Open function. The position of dip switch I10021 determines which is selected. If it is Off, it is used as Auxiliary. If the dip switch is On, it is used as Safe Open. The Auxiliary Open functions the same as the Remote Open function, with the exception of the input impedance which is approximately 300 k. The Safe Open function allows the user to open the circuit breaker when the onboard microcontroller is faulty. During normal conditions, all opening inputs work, but if the microcontroller is damaged, only the Safe Open input can perform the opening command. When the microcontroller is damaged, capacitor monitoring is not active so other inputs will be ignored. In order for the breaker to open correctly, there must be sufficient energy in the capacitors. This input can be configured as either a Protection Trip or Second Trip function. It is programmed via Jumper JP1001 pins 1 and 2 or as a normal input by jumpering JP1001 pins 2 and 3. The Protection Trip input is designed to work at a lower threshold of 7 VDC. This input is provid ed to use with special protection relay requirements. It can also be used as a normal trip input. The Second Trip is often referred to as “Shunt Trip.” It functions the same as the Remote Input with the exception of the input impedance which is 300 k. The circuit breaker Close Blocking feature functions like the familiar 69 switch. The circuit is de energized when the external trip handle is moved from its normal position (i.e., to the trip position). In this position the breaker cannot be either locally or remotely closed. When the circuit breaker is tripped by operating the manual trip handle, the breaker will go into the Close Block mode. This prevents any future closings until the trip handle is returned to the normal position. The manual trip handle must be left in the down position for the switch to remain open (i.e., locked open). There is a padlock provision for locking the manual trip handle in the locked open position. There is a padlock provision for locking the manual trip handle in the locked open position. (see The Under Voltage Trip input will perform an auto trip in the event the voltage source being monitored by this input falls between 35% to 70% of nominal. It is enabled through DIP Switch I1004/234. The response of this input also has a programmable time delay from 50 millisec onds to 5 seconds. The delay is set by the various combinations of DIP Switch I1004/234 (see section ).The Under Voltage Threshold is set by I1001. (see Thresholds 1 100 – 127 VAC/DC 2 48 – 60 VDC 3 24 – 30 VDC NONE 220 – 240 VAC/DC Binary outputs are simply pairs of mechanical wipe relay contacts. They can be employed to switch in other circuitry or to an alarm indicator. See and for the power limitations of the contacts. Notice the flat curve for AC voltage in . On the inside of the low voltage cabinet there is a membrane style button plate that contains a “Ready” LED. The Ready light will either flash or turn off depending on the state of the capacitor voltage and coil continuity. The “Unit Ready” output contact can be used to alarm for the more serious of the three types of problems, but will not signal for all levels of the above problems. (see The Circuit Breaker Opened contacts are normally open. They close only when the circuit breaker is in the Open position. The Circuit Breaker Closed contacts are normally open. They close only when the circuit breaker is in the Closed position. The Circuit Breaker Auxiliary Open contacts close whenever the breaker is in the Open position. An additional set of normally open contacts close whenever the breaker is in the Close position. These contacts are normally open. They close when the breaker is ready. They are used to monitor capacitor charge (OCO operation ready), valid circuit breaker position and coil continuity. The Unit Not Ready contacts are normally closed. They open when the Unit is Ready. These contacts are the inverse (negative) of the Unit Ready contacts. When using the Not Ready contacts to provide an alarm to SCADA, an 8 second delay is recommended since the unit will go to Not Ready when the capacitors are below 49 V. The 8 second delay allows the capacitors to charge prior to alarming. The Circuit Breaker Remote Open contacts are referred to as the “Fleeting Output Contacts.” This means that they only close for 100 milliseconds after a Remote Operation is performed. Maximum Switching Power 1500 VA on Resistive load Maximum Switching Voltage 400 VAC, 300 VDC Maximum Switching Current 6A Maximum Rated Current 6A Maximum On Resistance (Ron) 100 m (measured by voltage drop 6 VDC 1 A) Maximum Capacitance 1.5 pF Maximum Actuating Time 5.0 milliseconds Maximum Releasing Time 3.0 milliseconds Between Contacts and Coil 4000 Vrms (50 Hz/1 min.) Between Open Contact 1000 Vrms (50 Hz/1 min.) Resistance (Roff) >1000 M at 500 VDC Operating Temperature Range 50 to +55 Degrees C Storing Temperature Range 40 to +55 Degrees C Expected contacts life (min. operations) Mechanical (at 180 cpm) 5 million Electrical (6 A / 277 VAC/resistive load) 30,000 *See for specific loads and voltages. The Temperature Protection circuit monitors the average temperature of a critical area on the CONTROL BOARD power supply. The output power will be linearly reduced to zero as the component temperature increases from 78 degrees C to 95 degrees C. See. An Auto Trip command will be issued in the event the breaker does not perform a successful close operation within 95 milliseconds after the close command is issued. The Energy Failure Auto Trip function is selected by Dip Switch I10041 and will cause the breaker to auto trip in the event the capacitor voltage falls below 49 volts. Necessary precautions must be taken when power is removed (e.g., power removed for maintenance) as the breaker will automatically trip if I10041 is in the “On” position. The Reduced Power Consumption setting will lower the power output of the power supply recharge unit on the control board, from 75 W to 33 W. This enables the control board to be supplied with the energy delivered by a voltage transformer if necessary. The Power Supply Recharge Unit is 80% efficient. This means that the Auxiliary Power supply input must be at least 93.75 W for the 75 W setting or 41.3 W for the 33 W setting. The 33 W option is hardware selectable with Jumper JP1019. (see . Used by ABB factory only. The control board power supply recharge unit adapts any voltage within the specified range of the board to maintain 80 V across the capacitors. The following voltage thresholds must be reached to complete the specified operations: 1. The capacitor voltage threshold for an Open operation is 49 volts. 2. The capacitor voltage threshold for a CloseOpen operation is 72.5 volts. 3. The capacitor voltage threshold for an OpenCloseOpen operation is 78 volts. Note: Contact an ABB sales representative for a replacement. Apx Figure 5 Ready LED Continually Flashing and Figure 6 Ready LED Off are provided to indicate the states of the Ready LED, Ready and Not Ready output contacts. Energy sufficient for OCO operations Open allowed Close allowed Energy sufficient for CO operations Open allowed Close allowed Energy sufficient for O operations Open allowed Blocked in open position Energy insufficient for any operation Blocked in closed position or CB opened (depending on dip switch setting I1004) Blocked in open position The actuator control board provides access through KM1003 for discharging the Storage Unit capacitors. Make sure the control board power is removed before attempting to discharge the capacitors. A 10 k capacitor discharge resistor is mounted on the circuit board. Discharging is done by jumpering KM1003 pins 4 and 5. The time constant is 66 minutes. An external resistor can be used for quicker discharging, but the discharge current should be restricted to 10A maximum. This means that no lower than 10 external resistances should be used to perform capacitor discharging. In this case an external 10 , 25 watt resistor can be connected to KM1003 Pins 4 and 6. Approximately 20 seconds is needed to discharge the capacitors using the 10 external resistor. The standard 0.1 farad electrolytic capacitors are designed to be operated in the temperature range of 40°F to 185°F (40°C to 85°C). The endoflife corresponds to the point at which the capacitance decreases by 20% or more. It is recommended that replacement of capacitors be performed every 15 years for tropical cli mates and 20 years for an average yearly temperature (in the outdoor breaker enclosure) of less than 122°F. Extreme temperature capacitors are available as an option. These optional capacitors are rated for operation between 67°F and 221°F. (55°C to 105°C) Capacitor Energy sufficient For O CO operations Ready LED: on Ready contact: closed Not ready contact: opened Ready LED: on Ready contact: closed Not ready contact: opened Capacitor Energy sufficient for CO operations Ready LED: blinking Ready contact: closed Not ready contact: opened Ready LED: blinking Ready contact: closed Not ready contact: opened Capacitor Energy sufficient for O operations Ready LED: blinking Ready contact: closed Not ready contact: opened Ready LED: off Ready contact: opened Not ready contact: closed Capacitor Energy insufficient for any operations Ready LED: off Ready contact: opened Not ready contact: closed Ready LED: off Ready contact: opened Not ready contact: closed Close Coil continuity not right Ready LED: blinking Ready contact: closed Not ready contact: opened Ready LED: off Ready contact: opened Not ready contact: closed Open Coil continuity not right Ready LED: off Ready contact: opened Not ready contact: closed Ready LED: off Ready contact: opened Not ready contact: closed KM10011 ELECTRONIC GRD (0 VDC) KM10012 ELECTRONIC GRD (0 VDC) KM10013 +18 VDC KM10014 +18 VDC KM10015 ON SIGNAL (0 VDC) KM10016 OFF SIGNAL (0 VDC) KM10021 CAPACITOR PLUS (+80 VDC) KM10022 CAPACITOR PLUS (+80 VDC) KM10023 CAPACITOR MINUS (0 VDC) KM10024 CAPACITOR MINUS (0 VDC) KM10025 + CLOSE COIL (+80 VDC) KM10026 + CLOSE COIL (+80 VDC) KM10027 + TRIP COIL (+80 VDC) KM10028 + TRIP COIL (+80 VDC) KM10029 CLOSE COIL KM100210 CLOSE COIL KM100211 TRIP COIL KM100212 TRIP COIL Unless specified by the customer, the Low Energy and Under Voltage trip functions are disabled. Input three is set for Auxiliary trip mode as opposed to the Protection Relay trip mode. The Protection Relay mode has a lower switching threshold (7 VDC). See section 3.0 for the switch and jumper locations. The following represents the functional jumper and dip switch settings which are the shipped configuration. READY LED FLASHING CIRCUIT BREAKER POSITION OPEN NOTE: ENERGY SUFFICIENT ONLY FOR CLOSE OPEN OPERATION CLOSED NOTE: ENERGY SUFFICIENT ONLY FOR OPEN CLOSE OPERATION <15 SEC SINCE ANY OPERATION OR <30 SEC SINCE POWER UP YES NO ISSUE NO CHECK CLOSE COIL CONNECTIONS & CONTINUITY POSSIBLE ISSUES: 1) ED2.0 BOARD BAD* 2) AUX SUPPLY LOW 3) FAULTY CAPACITORS* The Power Supply recharge circuitry either reduces (high voltage board) or increases (low volt age board) input voltage within the specified range supplied to maintain an 80 V charge voltage across the capacitors. The Control Unit monitors binary inputs and outputs, hardware and software configurations, position sensors, capacitor charge, and switches the FET circuit to connect the capacitor voltage to the magnetic actuator coils following an open or close command. Because of the risk of death or serious bodily injury, capacitors must be fully discharged prior to troubleshooting. 1. Use diagram on the previous page for references to troubleshooting the actuator control board. 2. Disconnect source power to outdoor breaker. 3. Warning: removing cover exposes live voltage. 4. Remove the two #4 screws holding on the Push button plate and let it hang down. 5. Remove the four .250 X 20 screws from the corners of the control board cover. Follow these instructions for a quick setup check on a breaker that has operated previously: 1. Check pins 2 and 3 on KM1003 to confirm proper input voltage is applied. 2. Verify that there is 18 VDC on terminals 1 () to 3 (+) on KM1001. 3. Verify there is 80 VDC from KM1002 1 () to 3 (+). 4. If correct voltage is applied and DC is not reading, then the board needs to be replaced. The auxiliary supply voltage is absent. Check pins 2 and 3 on KM1003 to confirm proper input voltage is applied. The magnetic actuator is damaged or not connected. Check the magnetic actuator circuit. Unplug the magnetic actuator from the plug to the left of the mechanism (MA). There are two Phillips head screws that keep the plug held together. The top two wires are red and the bottom two wires are blue. The top red (43) and top blue (45) wire go to the "On" (close) coil. The other two wires go to the off (open) coil. Each of these coils should read approximately 0.3 ohms. The breaker position is not being read correctly. When breaker is verify I1001 shows 18Volts from terminal 1 to terminal 5 and approximately 0 volts from terminal 2 to terminal 6. Reverse this procedure if breaker is open, 0V terminal 1 to 5, 18V terminal 2 to 6. The Under Voltage (UV) function is enabled and input is open. Inspect dip switch I1004. Ensure switches 2, 3, 4 and 5 are in the off (down) position (disables UV), or apply correct input voltage to pins 13 and 14 on KM1005. Ready LED is off (unit not ready) Ready LED is off (unit not ready) The UV function is enabled and the monitored voltage is connected to the UV input, but the voltage is lower than the threshold. The auxiliary supply voltage has been turned off and the voltage on the capacitor is under the OCO levels. Set the correct UV threshold level via DIP switch I1001 or disable UV by putting switches 2, 3, 4 and 5 in the off (down) position on I1004. Check pins 2 and 3 on KM1003 to confirm proper source input voltage is applied. The control panel is damaged or not con nected correctly. Verify the control panel 6pin plug is plugged into KM1007. The circuit breaker is closed and the close coil is disconnected or broken. In this case, only the opening operation is avail able; open the circuit breaker (the ready LED will be turned off) and check the closing coil circuit. Unplug the magnetic actuator from the plug to the left of the mechanism (MA). There are two Phillips head screws that keep the plug held together. The top two wires are red and the bottom two wires are blue. The top red (43) and top blue (45) wire go to the "On" (close) coil. The coil should read approximately 0.3 ohms. The auxiliary supply voltage has been turned off. If the circuit breaker is closed you can perform a COoperation; connect the auxiliary supply. Check pins 2 and 3 on KM1003 to confirm proper input voltage is applied. The capacitor bank is charging during start up or after an opera tion. Wait a few seconds. The opening coil is broken or damaged. In this case, only the closing operation is avail able; open the circuit breaker (the ready LED will be turned off) and check the closing So circuit. Disconnect the magnetic actuator from the plug to the left of the mechanism. There are two Phillips head screws that keep the plug held together. The top two wires are red and the bottom two wires are blue. The top red (43) and top blue (45) wire go to the "On" (close) coil. The coil should approximately 0.3 ohms. The capacitor bank is not connected. Check the capacitor bank circuit. Verify the capacitors are connected to the control board. Ensure that there is 80 VDC across KM1002 ter minals 1 and 3. No external opening input is connected. Verify opening input is wired. The control panel is either damaged or not connected correctly. Verify the control panel 6pin plug is plugged into KM1007. Ready LED is blinking The opening command is not performed The opening command is not performed The voltage on the All indication output capacitor bank is contacts are open under 46 VDC. Connect the auxiliary power supply voltage. The closing command is not performed Capacitor bank is not connected. If it happens immediately when the supply voltage is switched off and the ready LED is immediately turned off, check the capacitor bank circuit. The closing coil is broken or damaged. Check the closing coil circuit. Disconnect the magnetic actuator from the plug to the left of the mechanism. There are two Phillips head screws that keep the plug held together. The top two wires are red and the bottom two wires are blue. The top red (43) and top blue (45) wire go to the "On" (close) coil. The coil should approximately 0.3 ohms. One open input is active. Verify there is not a held trip signal on the CONTROL BOARD board. Verify the voltage across TB18 and TB13 is "0" (KM1005 3, 4), and also across KM1005 5, 6 Safe open (if used), and KM1005 7, 8 second trip (if used). The block in open input is open (manual trip lever). Check the manual trip lever to verify it is in the up (normal) position. If it is, verify the microswitch (mounted on the mechanism side) has continuity across the wires. The capacitor bank is not connected. Check the capacitor bank circuit. Verify the capacitors are connected to the control board. Ensure that there is 80 VDC across KM1002 ter minals 1 and 3. The ready LED on control panel is off. See conditions under "Ready LED is off (unit not ready)". The control panel is damaged or not con nected properly. The energy in the capacitor bank is not enough for a CO operation. The closing command is not performed The circuit breaker closes and then opens during a close operation Verify the control panel 6pin plug is plugged into KM1007. Ensure the auxiliary supply voltage is connected. See "ready light blinking" section. The external close input is not supplied. Verify close command is wired to input. The auxiliary contacts are not operating properly. Verify the close position auxiliary contact. The circuit breaker doesn't reach the cor rect close position. Verify the presence of unwanted objects under the magnetic actuator plunger. The circuit breaker opens if the auxiliary supply is switched off The UV function is active and the auxiliary supply is parallel to this input. Either disable the UV function or connect to a dif ferent voltage source. The energy failure auto trip function is enabled. If possible, disable the function via I10041. Switch 1 should be in the off position. 1. Disconnect the source power to the RMAG. 2. Remove the two #4 screws holding on the push button plate and let it hang down. 3. Remove the four .250 X 20 screws from the corners of the CONTROL BOARD cover. 4. With the cover removed, verify the voltage input to the board is off by measuring the voltage atKM1003 terminals 2 and 3. It should be zero. 5. Before proceeding, discharge the capacitors by placing jumpers on KM1003 pins 4 and 5. The time constant is 66 minutes. A smaller external resistor can be used for a quicker discharge, but the discharge current should be restricted to 10 amperes maximum. This means that no lower than 10 25 watt external resistance should be used to perform capacitor discharging. When discharging with an external capacitor, connect to pins 2 and 3 on KM1002. 6. After the capacitors are discharged, take a small screwdriver and remove the capacitor wires from KM1002 pins 1, 2, 3 and 4. Note how they are connected since they will be reinstalled on the new board. 7. Remove five plugs: KM1001, KM1002, KM1003, KM1004 and KM1005. To remove, loosen holddown screws from each plug. 8. Remove plug for push button plate. This is not held by retainers. 9. Remove four .25020 nut, lock and flat washer from the four corners. Keep the three rubber washers behind each screw. The following basic rules need to be observed: 1. Handling of MABS1 CONTROL BOARD cards during assembly or replacement operation must be limited to the minimum time. 2. Always hold a card by its edges. 3. Avoid touching the components assembled on the module. 4. Take care when connecting or disconnecting cables. 5. Avoid bending the card during wiring connectors insertion. 6. First, fix the control board to the panel. Then insert the filter card (if required) and wire harness connections. 7. Prevent damage to the connectors by aligning connector pins before you connect the cable. 8. Remove and replace the board. 9. Perform this process in reverse order to reinstall the board. Apx Figure 11 ED2.0 Control Board Parts and Mounting 55 All sales are subject to ABB Inc. General Terms and Conditions of Sale. While every effort has been made to assure accuracy, the information in this document is subject to change without notice. 1VAL255104-MB Rev D, March 2013 For more information, please contact: ABB Inc. 655 Century Point Lake Mary, FL 32746 Phone: +1 407-732-2000 ext. 2510 +1 800-929-7947 ext. 5 [email protected] www.abb.com/mediumvoltage