* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Download SOFIA Engineering Meeting 12-May-2011
Survey
Document related concepts
Transcript
SOFIA Proposal Engineering Meeting 12-May-2011 U d t since Updates i last l t meeting ti • CDL Two science teleconferences held – Astronomers involved include Al Wooten, Todd Hunter, Yancy Shirley, Tony Remijan, Ted Bergin, Gary Melnick, Bryan Butler, and Mark Gurwell – Increased sensitivity of SIS over HEB really really wanted – Need to have at least order-of-magnitude improvement over GREAT without sacrificingg frequency q y agility g y • Since we can’t yet get this improvement in sensitivity, get it in mapping speed with more pixels SOFIA Proposal Engineering Meeting 12-May-2011 2 U d t since Updates i last l t meeting ti • • • CDL Expanded science case – SOFIA is an observatory, not a mission – Given constraints of airplane, flight plans, etc., need to observe multiple p targets g each flight g to maximize relativelyy small observingg time (only 1000 hours per year in full opertations) Al working on sensitivity calculator for SOFIA with 1000K and 300K DSB noise temperature p Met with Ed Tong from SAO who has been working with HEB mixers – 0.5 K/GHz is current state-of-the-art for HEB mixers • Gives 700K for 11.4 4 THz, THz plus allowances for optics optics, etc., etc 1000K is reasonable spec for 1.2-1.5 THz SOFIA Proposal Engineering Meeting 12-May-2011 3 CDL 4 CDL 5 CDL 6 CDL SOFIA Completes p First Flight g of GREAT April 7, 2011 SOFIA Proposal Engineering Meeting 12-May-2011 7 CDL 8 CDL Current Strawman Specs p for NRAO Instrument • • • • • • • • Facility Instrument 8 pixels balanced HEB Single-polarization 1218-1492 GHz 1.5-3.0 GHz 1st IF 1000K DSB S Spectrometer – 1.5 GHz, 2048 channels (732 kHz resolution) with 187.5 MHz zoom mode (92 kHz resolution) • At 1.4 THz, 300 km/s range with 18 m/s resolution in zoom mode SIS is an upgrade path SOFIA Proposal Engineering Meeting 12-May-2011 9 SOFIA Call C ll for f Proposals P l • • • • CDL Scheduled to be released June 30 Final proposal then due Sept 30 $35M spread over FY12-FY18 – One investigation to begin mid-FY12, mid-FY12 additional investigations to begin one year later One new instrument commissioned per year starting FY15 SOFIA Proposal Engineering Meeting 12-May-2011 10 S i Science IInstrument t t System S t • • • • • • CDL SI assembly (cryostat, optics, electronics) mounted at the instrument flange of the Telescope Assembly “Counterweight Rack” mounted on Telescope Assembly which can be populated with SI equipment. 19-inch rack frame provided by NASA Up to three “PI Racks” of SI equipment installed over center wing section of main deck. Dual-bay, short, 19-inch rack frames provided by NASA Chopper pp interface electronics (optional) ( p ) to drive Telescope p Assemblyy secondary mirror chopper SI Installation Cart to transport the SI through ground facility, onto aircraft,, and install on Telescope p Assemblyy instrument flange g Any lab stands or ground support equipment required for routine maintenance of instrument SOFIA Proposal Engineering Meeting 12-May-2011 11 NASA Furnished F i h dE Equipment i t • • • • • • CDL PI rack(s) PI rack installation dolly Counterweight rack Counterweight rack installation cart Lab space at DAOF for integration activities Lab technicians and supplies to support integration SOFIA Proposal Engineering Meeting 12-May-2011 12 CDL T i pertaining Topics t i i to t airworthiness i thi off SI • • • • • • • • • • Anything that can cause injury to personnel Anything that can cause a fire Commands by one system to others that result in hazardous conditions Systems that monitor, monitor provide warning of of, or prevent hazardous conditions Anything that affects the aircraft pressure boundaries Foreign Object Damage and equipment security Pressure systems Cryogens Toxic substances Radiation, both ionizing and non-ionizing SOFIA Proposal Engineering Meeting 12-May-2011 13 I t Instrument t Interfaces I t f - Optical O ti l • • • • • CDL SOFIA telescope is a two mirror bent Cassegrain with single Nasmyth instrument mount fed by a flat tertiary Effective aperture is 2.5m and provides f/19.5 beam to instruments Secondaryy mirror pprovides p-p p p chopp amplitude p of 10’ between 0-20 Hz – Secondary mirror chopper triggered from TTL waveform from SI Dichroic tertiary for optical imaging and guiding cameras No window installed in optical path, path i.e. i e the SI is the pressure barrier to the main cabin SOFIA Proposal Engineering Meeting 12-May-2011 14 I t Instrument t Interfaces I t f - Electrical El t i l • • • • • • CDL Connections to SI include power, LAN, GPS, and IRIG-B timing – Provided at PI patch panel near PI racks PI racks and telescope assembly separated by ~25 feet SOFIA provides cables from PI patch panel to Telescope Assembly (TA) patch panel routed under the cabin deck SI and counterweight rack connect to TA patch panel Currently a total of 5 KVA available for SI use Intent is to provide up to 15 KVA for new instruments SOFIA Proposal Engineering Meeting 12-May-2011 15 I t Instrument t Interfaces I t f - Software S ft • • • • CDL Observatory is controlled by the Mission Command and Control System (MCCS) which coordinates the aircraft, telescope, and science instrument (SI) SI issues commands to the observatory via the SOFIA Command Language (SCL), which are then executed by the MCCS MCCS provides housekeeping data to SI for reducing data and populating FITS headers SOFIA Data Cycle System (DCS) provides long-term archival and retrieval functions for raw and reduced SI data (data stored in FITS files) SOFIA Proposal Engineering Meeting 12-May-2011 16 Commissioning g and Guaranteed Observing • • CDL Proposers shall estimate number of flight hours needed for commissioning In addition, PI is granted 50 hours of guaranteed observing time SOFIA Proposal Engineering Meeting 12-May-2011 17 Proposal p Requirements q • CDL Scientific/Technical Investigation (20 page limit) – Overview – Scientific Goals and Objectives – Investigation Requirements • Must include “Traceability Traceability Matrix” Matrix describing required “objectivesobjectives to-measurement-to-mission traceability” – Measurement Data and Other Investigation Products – Descope Options SOFIA Proposal Engineering Meeting 12-May-2011 18 P Proposal l Requirements R i t • CDL Scientific/Technical Investigation continued… – Implementation: Instrumentation • Preliminary description with a block diagram showing interfaces, alongg with description p of estimated performance p • All enabling technologies required to be at TRL 6 or higher – TRL 6: “System/subsystem model or prototype demonstration in a relevant environment environment” • Data analysis and archiving • Science/Technology Team SOFIA Proposal Engineering Meeting 12-May-2011 19 P Proposal l Requirements R i t • CDL Investigation Implementation (20 page limit) – Heritage and maturity of mission elements – Reliability measures (use of redundancy, etc.) – Instrument assembly, assembly testing, testing and calibration – Technology Development (discouraged) • Plan for bringing identified items to TRL 6 – Product P d Assurance A – Risk Identification and Mitigation – Identification of instrument to aircraft interfaces SOFIA Proposal Engineering Meeting 12-May-2011 20 P Proposal l Requirements R i t • CDL Investigation Implementation continued… – Management and Schedule – Cost and Estimating Methodology • Highly encouraged to provide the following (not counted against page limit) – MEL – WBS – WBS Dictionary – WBS Cost Table – Basis of Estimate Details SOFIA Proposal Engineering Meeting 12-May-2011 21 P Proposal l Requirements R i t • • CDL EPO Plan not needed (SOFIA provides) Appendices – Letter(s) of Commitment – SOWs – Resumes – Heritage – References R f SOFIA Proposal Engineering Meeting 12-May-2011 22 I t Instrument t Design D i - Optics O ti • • • CDL Need to couple 8 beams from feedhorn to Telescope Assembly optics Baseline is waveguide balanced mixer, fallback is single-ended mixer with LO beamsplitter For p proposal, p , want ppreliminaryy design g with Inventor drawings g SOFIA Proposal Engineering Meeting 12-May-2011 23 I t Instrument t Design D i - Mixer Mi • • • • • • • CDL HEB Mixers – NbN p-HEB fabricated at UVA – Edward Tong (SAO) is lead on this NTC shop to fabricate prototype mixer block of E. E Tong Tong’ss design this summer E. Tong already has some HEB mixer chips (quartz) Will perform noise measurement at SAO this summer, summer with results in time for proposal HEB then will be redesigned on SOI, first single-ended then balanced I Integrated d Feedhorn/Mixer/LNA F dh /M /LNA Integrate 4 or 8 pixels into single block? SOFIA Proposal Engineering Meeting 12-May-2011 24 CDL I t Instrument t Design D i – Local L lO Oscillator ill t • • • • ALMA Front End LO Design, using YIG-tuned oscillator with x3 AMC and PA MMICs in PA block will use GaN rather than GaAs – W-band GaN MMICs available from HRL or Quinstar Q – Trying for demonstration this summer Use VDI x2-x3-x3 frequency multipliers with 67.8-82.8 GHz driver (same as ALMA LO Band 4/8/9) >10 W over full band (enough for balanced SIS or single-ended HEB with coupler/beamsplitter) SOFIA Proposal Engineering Meeting 12-May-2011 25 CDL 26 I t Instrument t Design D i - IF • • • CDL 1.5-3.0 GHz IF No isolator, use either SiGe HBT or balanced HFET cold LNA Recently delivered HBTs from ST wafer give Tmin of 1K at 4 GHz – Matt Morgan has 1.7-2.6 1 7-2 6 GHz LNA design using these devices • Results from this LNA can be used in proposal SOFIA Proposal Engineering Meeting 12-May-2011 27 CDL Instrument Design g – Digitization g & Spectrometer • • • • • 1.5 GHz is current capability of CASPER hardware Digitize in second Nyquist zone Capitalize on GUPPI and new GBT spectrometer experience Can also use “off-the-shelf” off-the-shelf spectrometer from RPG or Omnisys as benchmark for costing and power consumption Rich Lacasse working on this SOFIA Proposal Engineering Meeting 12-May-2011 28 C Cryogenics i and d Mechanical M h i l Design D i • • • • CDL Current instruments (GREAT and CASIMIR) use liquid He filled Dewars Increase from 5 KVA to 15 KVA allows use of Sumitomo refrigerator “The design and operations of SOFIA Science Instruments shall permit installation on the SOFIA aircraft,, optical p alignment, g , cryogenic y g servicingg and cold functional check-out of Science Instruments within an 8 hour period.” – Therefore,, receiver must be cold before movingg onto pplane and installation For proposal, need some initial drawings, calculations, and cost estimates for design g and airworthiness qualification q SOFIA Proposal Engineering Meeting 12-May-2011 29 S ft Software & Data D t Pipeline Pi li • • CDL Help! For proposal, need plan and cost estimates SOFIA Proposal Engineering Meeting 12-May-2011 30 C lib ti Calibration • • CDL Help! “SOFIA Science Instrument astronomical data shall be flux calibratable to within 20% RMS.” SOFIA Proposal Engineering Meeting 12-May-2011 31 N t steps Next t • • • CDL Preliminary costing Sensitivity calculator for next Science meeting Awaiting release of “Science Instrument Developers Handbook” SOFIA Proposal Engineering Meeting 12-May-2011 32