Download Power Point Presentation

Survey
yes no Was this document useful for you?
   Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Document related concepts
no text concepts found
Transcript
COST EFFECTIVE SOFTWARES IN ENGINEERING
SUPER CIVIL CD- Single Point Solution To Your Civil Engineering Needs
SUPER RATE ANALYSIS - Rate Analysis Of 1299 Nos. Of Civil Engineering Items
2D FRAME ANALYSIS - Discover The Beauty Of Structural Analysis
R C F - A Software for Analysis, Design, Estimation & Costing of RCC Floors
S S F - Analysis, Design, Estimation & Costing of Steel Buildings, revised as per IS 800 : 2007
QTY
- Quantity Estimation & Cost, Project Control
SUPER REAL VALUATION - A Software For Immovable Properties
ROADS - Pavement Design & Rate Analysis Of Road Items
ROAD ESTIMATE - Quantity Estimation & Cost, Project Control For Road
ELECTRIC COST - Costing, Project Control & MDS For Electrical Projects
HVAC COST - Costing, Project Control & Design For HVAC Engineers
BILLING JI
- A Database Management Software For General Billing
RA BILL - A Database Management Software For Item Rate Contract Billing
Previous Slide : Backspace Key
Next Slide : Space Key
Exit : Esc Key
COST EFFECTIVE SOFTWARES IN ENGINEERING
BUILDERS BILL - A Database Management Software for Billing of Lump sum Contracts
BID ANALYSIS - A Software For Technical & Commercial Tender Analysis
RAFT FOUNDATION - Analysis, Design, Estimation, Costing & Drawing of RCC Raft Foundation
STEEL_2007 - Limit State design of Steel as per IS 800 : 2007
SITE CONTROL - A Management Software for Resource Control At Site
DESIGN & DRG CONTROL - A DBM Software for Control of Design & Drawing Manhours
COMPOSITE - A Software for Analysis, Design, Costing & Drawing of Composite Floor Buildings
INSTA COST - A Software for Estimating Project Cost & Tender SOQ Instantly
FLAT SLAB - A Software for Analysis, Design, Estimation, Costing & Drawings of Flat Slabs
FLAT RAFT - A Software for Analysis, Design, Estimation, Costing & Drawings of Rigid RCC Flat Rafts
OPTIMIZE_BAR - A Software for Optimization of Reinforcements from Existing Bar Bending Schedule
OPTIMIZE_STEEL - A Software for Optimization of Steel Sections from Existing Fabrication Drawing
Previous Slide : Backspace Key
Next Slide : Space Key
Exit : Esc Key
AUTOQTY
A Software for Automatic Quantity and Cost Calculations from AutoCAD Drawings
Using, AutoQty Software Quantities can be calculated directly from drawings.
AutoQty will eliminate the need to input L, B, and D values for Quantity Estimation.
However, for Items that cannot be calculated directly from Drawings, a separate user friendly interface is
provided.
AutoQty also has a facility to 'Create your own items of Estimation', apart from items of Estimation
calculated by AutoQty.
STEPS IN QUANTITY ESTIMATION
DRAWING
PREPARATION
ADD / IMPORT
SCHEDULES
Previous Slide : Backspace Key
SCAN &
CALCULATE
Next Slide : Space Key
REPORTS
Exit : Esc Key
STEP 1
DRAWING PREPARATION
This is the most important step in Calculation of Quantities
Drawing Preparation implies carefully arranging the drawing Components (Beam / Slab/
Column / texts etc in case of RCC Drawings and Plasters/ Walls / etc in case of Architectural
Drawings) in their respective layers.
For every drawing component a Layer has been specified by AutoQty
Previous Slide : Backspace Key
Next Slide : Space Key
Exit : Esc Key
RCC DRAWING PREPARATION
Original RCC Plan
Save the Drawing in AutoCAD DXF
Format
Previous Slide
Create Layers in RCC Plan
Arrange the Drawing components in their
respective Layers
: Backspace Key
Next Slide : Space Key
Exit : Esc Key
ARCHITECTURAL DRAWING PREPARATION
Original Architectural Plan
Create Layers in Architectural Plan
Save the Drawing in AutoCAD DXF
Format
Previous Slide : Backspace Key
Arrange the Drawing components in their
respective Layers
Next Slide : Space Key
Exit : Esc Key
STEP 2
ADD PROJECT AND COMPANY
DETAILS
Previous Slide : Backspace Key
Next Slide : Space Key
Exit : Esc Key
PROJECT DETAILS
Select Create New From File
Enter Other Project Details and click on
Save
Previous Slide : Backspace Key
Enter a new File Name
Add Floor Code, Description, Height for
each Floor Level
Next Slide : Space Key
Exit : Esc Key
COMPANY DETAILS
Select Company Details from Project Details Option and Enter the Company Details as Below:
The Company Details Tab
The Notes Tab
The Signatures Tab
The Client Tab
Previous Slide : Backspace Key
The Email Details Tab
The Logo Tab
Next Slide : Space Key
Exit : Esc Key
CONCRETE GRADES
Select Concrete Grade from Project Details Option and Select Beam /Slab or Column / Footing or
Concrete Grade Rates
Add Concrete Grade for Beam/ Slab/ Chajja/ Loft for each Floor Code
Add Concrete Grade for Column & Footing
for each Floor Code
Add Concrete Grade Rates
Previous Slide : Backspace Key
Next Slide : Space Key
Exit : Esc Key
STEP 3
ADD RCC SCHEDULES
Previous Slide : Backspace Key
Next Slide : Space Key
Exit : Esc Key
RCC SCHEDULES
Select RCC From Add / Edit Schedules :
Footing Schedule
Beam Schedule
Column Schedule
Slab Schedule
STEP 4
SCANNING AND CALCULATING RCC
QUANTITIES
Previous Slide : Backspace Key
Next Slide : Space Key
Exit : Esc Key
SCAN DRAWINGS AND CALCULATE QUANTITIES
Click on Select DXF file Button
Select an AutoCAD Drawing for the Floor
The Drawing path appears beside the Floor code
Similarly Select AutoCAD Drawing for each Floor
Code and Enter the Drawing Scale, Units, etc
Now, Click on Scan
Wait for AutoQty to scan the RCC Drawings
Now, Click on Calculate button & Wait for AutoQty
to calculate RCC Quantities
Previous Slide : Backspace
Next Slide : Space
Exit : Esc
STEP 5
VIEW RCC QUANTITIES
Previous Slide : Backspace
Next Slide : Space
Exit : Esc
RCC CONCRETE QUANTITIES
Select Concrete from Display RCC Quantities Option :
Footing Concrete Quantities
Beam Concrete Quantities
Column Concrete Quantities
Slab Concrete Quantities
RCC REINFORCEMENT QUANTITIES
Select Reinforcement from Display RCC Quantities Option :
Footing Reinforcement Quantities
Column Reinforcement Quantities
Beam Reinforcement Quantities
Slab Reinforcement Quantities
STEP 6
ADD ARCHITECTURAL SCHEDULES
Previous Slide : Backspace Key
Next Slide : Space Key
Exit : Esc Key
ARCHITECTURAL SCHEDULES
Select Architectural From Add / Edit Schedules
Wall Schedule
Plaster Schedule
Paint Schedule
Door Schedule
ARCHITECTURAL SCHEDULES
Select Architectural From Add / Edit Schedules
Window Schedule
Flooring Schedule
Opening Schedule
Dado & Skirting Schedule
ARCHITECTURAL SCHEDULES
Select Architectural From Add / Edit Schedules
Special Finishing's Schedule
Miscellaneous Blocks Schedule
False Ceiling Schedule
Water Proofing Schedule
Miscellaneous ItemsSchedule
STEP 7
SCANNING AND CALCULATING
ARCHITECTURAL QUANTITIES
Previous Slide : Backspace Key
Next Slide : Space Key
Exit : Esc Key
SCAN DRAWINGS AND CALCULATE QUANTITIES
Click on Select DXF file Button
Select an AutoCAD Drawing for the Floor
The Drawing path appears beside the Floor code
Similarly Select AutoCAD Drawing for each Floor
Code and Enter the Drawing Scale, Units, etc
Now, Click on Scan
Wait for AutoQty to scan the RCC Drawings
Now, Click on Calculate button & Wait for AutoQty
to calculate Architectural Quantities
Previous Slide : BackSpace
Next Slide : Space
Exit : Esc
STEP 8
VIEW ARCHITECTURAL QUANTITIES
Previous Slide : Backspace
Next Slide : Space
Exit : Esc
ARCHITECTURAL QUANTITIES
Select Display Architectural Quantities
Wall Quantities
Plaster Quantities
Paint Quantities
Door Quantities
ARCHITECTURAL QUANTITIES
Select Display Architectural Quantities
Window Quantities
Flooring Quantities
Opening Quantities
Dado & Skirting Quantities
ARCHITECTURAL QUANTITIES
Select Display Architectural Quantities
Special Finishing's Quantities
Miscellaneous Blocks Quantities
Previous Slide : Backspace Key
False Ceiling Quantities
Water Proofing Quantities
Next Slide : Space Key
Exit : Esc Key
ARCHITECTURAL QUANTITIES
Select Display Architectural Quantities
Lintel Quantities
Loft Quantities
Chajja Quantities
Miscellaneous Items Quantities
STEP 9
REPORTS
Previous Slide : Backspace Key
Next Slide : Space Key
Exit : Esc Key
PROJECT SUMMARY (RCC)
Select Project Summary (RCC) and click on Show Report
Previous Slide : Backspace
Next Slide : Space
Exit : Esc
PROJECT SUMMARY (RCC)
Select Project Summary (RCC) and click on Show Report
Previous Slide : Backspace
Next Slide : Space
Exit : Esc
FLOOR WISE QUANTITY AND COST
Select Floor Wise Quantity & Cost and click on Show Report
Previous Slide : Backspace Key
Next Slide : Space Key
Exit : Esc Key
TOTAL QUANTITY AND COST
Select Total Quantity & Cost and click on Show Report
CEMENT/ SAND / AGGREGATE CONSUMPTION
Select Cement / Sand /Aggregate consumption and click on Show Report
SUMMARY OF REINFORCEMENT
Select Summary of Reinforcement and click on Show Report
PROJECT SUMMARY
Select Project Summary and Click on Show Report