Download 7th-ATF2-urakawa

Survey
yes no Was this document useful for you?
   Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Document related concepts

Holography wikipedia , lookup

Thomas Young (scientist) wikipedia , lookup

X-ray fluorescence wikipedia , lookup

Diffraction topography wikipedia , lookup

Optical tweezers wikipedia , lookup

Harold Hopkins (physicist) wikipedia , lookup

Rutherford backscattering spectrometry wikipedia , lookup

Ultraviolet–visible spectroscopy wikipedia , lookup

Nonlinear optics wikipedia , lookup

Gaseous detection device wikipedia , lookup

Laser beam profiler wikipedia , lookup

Transcript
Greeting for 7th ATF2 project meeting
ATF International Collaboration
Oversea collaborators visited ATF for R&D
2000
Persons
days
1500
40
1000
30
20
500
10
0
2005
2006
2007
2008
0
Person-days
Oversea collaborators
visited for R&D at ATF
23 Institutes,
~60 peoples,
~1500 people-days
SLAC
LBNL
FNAL
Cornell Univ.
LLNL
50
Persons
CERN
DESY
LAL, Orsay
Tomsk Polytechnic Univ.
INFN, Frascati
University College London
Oxford Univ.
Royal Holloway Univ.
KEK
Waseda U.
Nagoya U.
Tokyo U.
Kyoto U.
Hiroshima U.
80
PAL
70
IHEP
60
KNU
Meeting for ATF operation in Spring
Accelerator Test Facility
ATF2 beam line (2008~)
Extraction line
Damping Ring
Photo-cathode RF gun
(electron source)
S-band Linac
f ECS for multi-bunch beam
Scaled down model of ILC final
focus (local chromatic correction)
ATF2 –
model
of ILC
BDS
ATF2 goals
(A) Small nominal beam size
Obtain sy ~ 37nm
Maintain for long time
(B) Stabilization of beam center
Down to < 2nm by nano-BPM
Bunch-to-bunch feedback of ILC-like train
ATF – beam operation schedule
ATF2 ON
Commissioning to start in Dec. 2008
We got the temporary permission to operate ATF2 in Dec.. I think we will
get the formal permission from MEXT in Jan..
Then, we can carefully operate ATF2 for beam commissioning. Thank you
for your understanding in this situation.
Necessary Deliverables from TF for BDS and DR
Test Facility
Deliverable
Date
Hardware development, Optics and stabilisation demonstrations:
ATF
ATF2
Demo. of reliable operation of fast kickers meeting the
specifications for the ILC damping ring.
2010
Generation of 1 pm-rad low emittance beam
2009
Demo. of compact Final Focus optics (design demagnification,
resulting in a nominal 35 nm beam size at focal point).
2010
Demo. of prototype SC and PM final doublet magnets
2012
Stabilisation of 35 nm beam over various time scales.
2012
Electron cloud mitigation studies:
CESR-TA
DAΦNE
Re-config. (re-build) of CESR as low-emittance e-cloud test
facility. First meas. of e-cloud build-up using instrumented
sections in dipoles and drifts sections (large emittance).
2008
Achieve lower emittance beams. Meas. of e-cloud build up in
wiggler chambers.
2009
Characterisation of e-cloud build-up and instability thresholds as
a func. of low vertical emittance (≤20 pm)
2010
Fast kicker design and pulser reliability check
2010
Characterisation of e-cloud build-up and instability thresholds
2010
• Thanks to many colleagues from the ATF
Collaboration, those on this photo.
Photo for
7th ATF2 Project Meeting, 15-18 Dec. 2008
I hope we will get a good discussion and
results during ATF2 project meeting and
TB meeting.
Enjoy 忘年会(End year Party) at the end
of this meeting.
Thank you for your attention.