49526 Simplified Procurement Plan I. General 1. Project information: Mozambique: Water Services and Institutional Support Project (P0104566) 2. Bank’s approval Date of the procurement Plan: April 4, 2007 3. Date of General Procurement Notice: March 23, 2007 4. Period covered by this procurement plan: April 2007 - September 2010 II. 1. Goods and Works and non-consulting services. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procurement Method 1. 2. ICB (Goods) ICB (Works) Prior Review Threshold (US$ Equivalent) = or >200,000 = or >500,000 Comments All All 2. Prequalification. There will be no prequalification of bidders. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: N/A. 4. Reference to (if any) Project Operational/Procurement Manual: Procurement Manual no objection given on 11th May 2008. 5. Any Other Special Procurement Arrangements: FIPAG and CRA will handle their own procurement processing while DNA will process procurement through CRA. 6. Procurement Packages with Methods and Time Schedule 1 2 3 4 5 6 7 Ref. No. Contract (Description) Procureme nt Method Domestic Preference (yes/no) Review by Bank (Prior / Post) Expected BidOpening Date Comment s ICB Yes Prior 15-02-10 ICB Yes Prior 23-01-10 NCB No Post 23-04-10 Design and Construct: 15 km of 500 mm DI distribution pipeline to replace the LicuariNicoadala pipeline for Nicoadala village, cerâmica, Domela, Namuinho, 1o de Maio, Mercado do lixo, Sagrada família ICB Yes Prior 11-09-09 Purchase of 4 Vehicles NCB No Post 25-10-09 Purchase of 8 Motorcycles IS No Post 25-10--09 Supply of Chemicals for 2009 ICB No Prior 17-07-09 Supply of Chemicals for 2010 ICB No Prior 17-12-09 Supply of Equipment and Spare parts (Such as valves, pumps, pipes etc) LOT 1 Supply of Equipment and Spare parts (Such as valves, pumps, pipes etc) LOT 2 Supply of Equipment and Spare parts (Such as valves, pumps, pipes etc) LOT 3 Supply of Meters NCB No Post 26-10-09 NCB No Post 28-12-09 ICB No Prior 19-03-10 ICB No Prior 20-02-10 Supply of Fittings for the New Connections ICB No Prior 24-07-09 FIPAG WORKS FIPAG/W ASIS/W3/07 FIPAG/W ASIS/W4/07 Construction of Water Distribution Centre at Quelimane Expansion of EB4 Nampula Distribution Centre NEW INVESTMENTS FIPAG/W Construction of Distribution ASIS/WReservoir at Dondo 5/08 Distribution Centre, Beira FIPAG/W ASIS/W6/08 GOODS FIPAG/W ASIS/G01/07 FIPAG/W ASIS/G02/07 FIPAG/W ASIS/G05/07 FIPAG/W ASIS/G06/07 FIPAG/W ASIS/G07/07 FIPAG/W ASIS/G08/07 FIPAG/W ASIS/G09/07 FIPAG/W ASIS/G15/07 FIPAG/W ASIS/G16/08 FIPAG/W ASIS/G11/07 FIPAG/W ASIS/G12 B/08 FIPAG/W ASIS/G12 C/08 FIPAG/W ASIS/G13/08 FIPAG/W ASIS/G13/08 Supply of Chemicals for 2011 ICB No Prior 27-10-10 Supply of Submersible pumps & fittings to Quelimane and pump fittings to Pemba Supply of Submersible pumps and fittings to Nampula Supply and installation of valves and dosing equipment for Beira NS No Post 24-07-09 NS No Post 14-09-09 NCB No Post 04-11-09 ICB No Prior 20-12-09 Supply of Valves & fittings DNA G11 Purchase of 4 Vehicles NCB No Post 28-01-10 G15 ICB No Prior 04-02-10 ICB No Prior 05-12-10 G19 Supply of Chemicals – For 2010 Supply of Chemicals – For 2011 Supply of Chemicals for 2011 ICB No Prior 28-07-11 G20 Supply of Chemicals for 2012 ICB No Prior 16-04-12 G21 Purchase of 2 Vehicles NCB No Post 19-07-11 Supply of 4 Vehicles Supply of Furniture for CRA Nampula NCB NS No No Post Post 26-08-10 15-09-09 G16 CRA G24 G26 NCB – National Competitive Bidding; NS – National Shopping; ICB – International Competitive Bidding, DC-Direct Contracting III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method 1. 2. 3. Prior Review Threshold (US$ equivalent) = or >100,000 All = or >50,000 QCBS (Firms) Single Source (SS) Firms/Individual Individual Consultant (IC) Comments All All All 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $100,000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: None. 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description of Assignment Selection Method Review by Bank (Prior / Post) Expected Proposals Submission Date Comments CONSULTANTS New Investments FIPAG/W Supervision of the new ASIS/CON distribution DI pipeline -8/07 at Licuári, Quelimane FIPAG/W Financial Audit for FY ASIS/CON 2009 and 2010 9/09 FIPAG/W Financial Audit for FY ASIS/CON 2010 and 2012 10/10 FIPAG/W Independent Audit of ASIS/CON Operators for Northern 13/07 Cities until 2012 QCBS Prior 18-10-09 LCS Post 11-08-09 LCS Post 03-07-10 QCBS Prior 06-11-09 TA for AIAS QCBS Prior 24-09-09 CON15 Regulatory frameworks & Implementation units design QCBS Prior 04-08-09 CON16 CON17 CON18 **CON19 Technical Coordinator Secretary Services Umbrella TA IC IC QCBS IC Prior Post Prior Post 10-03-10 10.03.10 26-01-10 30-04-12 QCBS Prior 22-07-09 DNA CON9 CRA CON20 Short term Consultancies below 50,000 each Tariff Study Implementation ** List of short term consultancies will be supplied later Note: QCBS- Quality and Cost Based Selection SS-Single Source Selection CQ – Selection Based on Consultant’s Qualification IC – Individual Consultant IV. Implementing Agency Capacity Building Activities with Time Schedule 1. In this section the agreed Capacity Building Activities (some items could be from CPAR recommendation) are listed with time schedule