Survey
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Mayor’s Report to the Assembly, 21st February 2006 APPENDIX B Background Document – List of Decisions recorded between 12th January 2006 to 7th February 2006 Ref Decision Date Approved by MA 2350 Agreed: 24/01/06 Ken Livingstone 1. The establishment of an annual State of Race Equality in London Conference to take place in March each year to observe the UN International Day for the Elimination of Racial Discrimination. 2. The first annual State of Race Equality in London conference to take place on Saturday 25 March 2006 at City Hall. 3. The lead officer to carry out a procurement process and award the contract, based on the evaluation of the tenders received, for a consultation to research and produce the conference report. The contract will be signed on behalf of the Policy Director/ Financial Implications Mayoral Adviser Lee Jasper The estimated gross and net cost of this project to the GLA is £40,000 and will be met from the following budgets: 2005/06 Project Development Fund (£20,000). 2005/06 Equalities Programme Budget (£10,000). 2005/06 Stakeholders Programme Budget (£10,000). In order to facilitate budget monitoring the contributions from the Equalities and Stakeholders Programme Comments GLA according to the approved financial delegation levels. 4. The allocation of £20,000 from the 2005/06 Project Development Fund to cover the costs of event planning, management, production and delivery of the conference on 25 March 2006. 5. Virements of £10,000 from the Equalities & Stakeholders Programme budgets to the Project Development Fund to meet some of the costs of the event. 6. Any savings made on this project will be transferred back to the budgets contributing to this event in the proportions that were originally contributed (Project development Fund 50%, Equalities Programme budget 25%, Stakeholders Programme budget 25%). The proportion of savings from the Project Development Fund will be transferred to the General budgets will be vired to the Project Development Fund. Allocation within the Project Development fund and be made available for reallocation to other projects in accordance with recommendations by the Finance Sub-Group allocation process and subject to Mayoral Approval. MA 2356 Agreed for the GLA to make a contribution to the charity organisation ‘Beatbullying Ltd’ for the Listen up London Campaign and launch event scheduled for March 2006. 02/02/06 Ken Livingstone Mark Watts MA 2427 Agreed the Road Traffic (Special 10/01/06 Parking Area) (London Borough of Hillingdon) Order 1994 Variation Order 2006 in order to modify the boundary of the existing SPA so far as it relates to Heathrow Airport including the proposed extension for Terminal 5, the Parkway, and the West End Road south of the A40. Ken Livingstone Redmond O’Neill MA 2453 Approved the timetable for review 13/01/06 of the Mayor’s Municipal Waste Ken Livingstone John Duffy The GLA will be making a contribution of £15,000 to ‘Beatbullying Ltd’ and this will be met from the 2005/06 Children and Young Peoples Programme budget. TfL currently enforce restrictions on the whole of the TLRN including these roads but some ambiguity exists regarding their legal right to do so. Without the proposed amendment there is a risk of legal costs being incurred if a penalty notice were to be challenged. There are no direct financial costs associated Management Strategy. MA 2455 Approved: 1. The receipt of £40,000 funding from the London Recycling Fund for the purposes of providing internal kitchen waste separation bins for the London university halls of residence recycling project and the entry into a funding agreement with London waste Action to cover the grant. 2. The granting of the funding received from the London Recycling Fund to CRISP for the purpose of carrying out the procurement and distribution of the waste separation bins and the entry into a funding agreement to cover the payment. 3. The GLA’s sponsorship team and waste policy team with approving the timetable for review of the Mayor’s Municipal Waste Management Strategy to the GLA. 10/01/06 Ken Livingstone John Duffy The estimated gross cost of this project is £40,000 and the net cost to the GLA is nil. This project is will funded by the grant of £40,000 from the London Recycling Fund. providing officer time to assist CRISP with seeking additional funding to continue the expansion of the London university halls recycling project in future years. MA 2466 Approved: 1. The establishment, with the ALG, of a Commission on Child Poverty to be chaired by an independent person. 2. The appointment of Carey Oppenheim to the office of Chair of the Commission, for up to a two-year period from 1 November 2005, on the terms and conditions set out in this MAF. 10/11/05 Ken Livingstone Murziline Parchment The establishment of the Commission is being undertaken jointly with the ALG and the costs will be met equally between the two organisations. All costs will be initially met by the GLA and 50% reimbursed by the ALG. The costs of the Commission are currently established to be some £52,000 in a full year with a net cost to the GLA of £26,000 and will be met from the following budgets: Health & Social Inclusion (£10,000). Tackling Poverty (£16,000). MA 2472 Approved: 10/01/06 Ken Livingstone John Ross 12/01/06 Ken Livingstone Mark Watts 1. That Peter Lewis represents the Mayor on the Board of Directors of the London Marathon. The costs of the Commission will be reviewed in 2006/07 and the funding for future years will be subject to the annual budget and decision-making process. There are no direct financial implications arising form these proposals to the GLA. 2. That Judith Woodward represents the Mayor on the Board of Trustees of ALM London. MA 2494 Agreed: 1. The GLA enter into detailed analysis and planning negotiations with Fretwork Downing Informatics Ltd (FDI) for the supply, The estimated gross and net cost of this project to the GLA is £115,000 and will span two financial years as follows: 2005/06 £80,000 2006/07 £35,000 development and implementation of the OLIB library management system software. The costs of this project will be met from the Capital Programme in each subsequent year. 2. To expend up to £10,000, if required to FDI in payment for the work to be carried out by technical staff during the planning and analysis stage. MA 2511 3. On successful conclusion of the planning and analysis stage, to award the contract to FDI for the supply, development and implementation of a new Library Management System subject to the total cost of the system not exceeding £115,000. Approved two new Transport Strategy Implementation Targets to assist implementation of the Mayor’s Transport Strategy through TfL’s Business Plan and Borough Local Implementation Plans: Borough Bus Target 10/01/06 Ken Livingstone Redmond O’Neill There are no direct financial implications to the GLA. MA 2515 MA 2517 Road Safety Target Agreed for the GLA to allow the 17/01/06 charity Community Network to use London’s Living Room free of charge (and agreed a waiver of the fees and charges policy for this purpose) to host a reception to launch its new London Friendship Link Project. The reception took place on the 9 February 2006. Agreed for the GLA to allow the charity, Greater London Volunteering, to use London’s Living Room free of charge (and agreed a waiver of the fees and charges policy for this purpose) to host a reception for a Year of the Volunteer celebration event. This reception took place on 30 January 2006. 12/01/06 Ken Livingstone Redmond O’Neill Ken Livingstone Neale Coleman The total 2005/06 hire charge for the hire of London’s Living Room at City Hall for this event is £5,535 which will be income forgone. The 2005/06 income target is £116,000. Waiving the hire fee will have a negative impact on this income target. To date a total of £230,036 of income has been forgone in 2005/06 in relation to the waiving of room hire charges at City Hall. The total 2005/06 hire charge for the hire of London’s Living Room at City Hall for this event is £5,535 which will be income forgone. The 2005/06 income target is £116,000. Waiving the hire fee will have a negative impact on this income target. To date a total of £230,036 of income has been forgone in MA 2529 Approved the consultation paper, which includes the draft Capital Spending Plan for 2006/07 and proposals in respect of borrowing limits for the GLA and functional bodies, for circulation to the Assembly and functional bodies for comment. 12/01/06 Ken Livingstone Neale Coleman MA 2530 Approved the appointment of the following individuals as independent members of the Authority’s Standards Committee: 24/01/06 Ken Livingstone N/A Professor Malcolm Grant (to serve from February 2006 until January 2008). Ms Jean E Weir (to serve from February 2006 until January 2008). Mr Simon Green (to serve from February 2006 until January 2010). Ms Claer Lloyd-Jones (to serve 2005/06 in relation to the waiving of room hire charges at City Hall. There are no direct financial implications arising from this proposal. The draft capital-spending plan sets out the functional bodies and the GLA’s proposed capital programme and borrowing limits for 2006/07. Expenses and attendance allowances for all independent members will be contained within existing Assembly budgets. These appointment s were agreed by Assembly on the 25th January 2006. from February 2006 until January 2010). MA 2531 Approved: 1. On behalf of the Capital Standards Network, the GLA running two more street Academy courses to train approximately 20 London Borough Enforcement Officers that were not trained as planned over the summer of 2005. 2. The award of this additional work to Park Hearne, the contractor awarded the 2005 contract through MA2018. 3. A waiver of the GLA’s Contracts Code of Practice to allow the contract to be awarded directly to Park Hearne without the GLA conducting a competitive procurement process. 13/01/06 Ken Livingstone John Duffy The estimated cost of this project is £6,400 and will be met from funds held by Capital Standards. MA 2533 MA 2534 MA 2536 MA 2541 Approved a financial contribution 17/01/06 of £15,000 to HACAN ClearSkies in respect of carrying out a study and production of a popular report on Heathrow noise contours, flight paths and the wider noise environment. Agreed to grant the London 06/02/06 Development Agency consent to acquire one preferred share in a training company set up by the Centre for Engineering and Manufacturing Excellence. Noted the work of the London 06/02/06 Equalities Commission to date and the proposed work programme for 2006. Agreed the appointments of Commissioners to the 31 March 2007 and that the filling of future vacancies be delegated to the Director of Equalities and Policing within the approved framework. Agreed: 1. To extend the Event Organisation Agreement for Events in Trafalgar Square 31/01/06 Ken Livingstone John Duffy The GLA’s contribution of £15,000 will be met from the 2005/06 Environment Programme budget. Ken Livingstone John Ross There are no direct financial implications to the GLA. Ken Livingstone Lee Jasper The GLA provides secretariat support for the Commission. The budget to support the Commission is currently £8,000 and forms part of the Equalities Programme budget. The current spend at the time of Quarter Three Budget monitoring was £2,371. Ken Livingstone Judith Woodward The estimated gross cost of the cultural events is £405,000 and the net cost to the GLA is £313,000. The balance of £92,000 with Greenwich & Docklands Festivals (GDF) to design, manage and deliver the agreed programme of events in Trafalgar Square for 2006. will be met from sponsorship and sales income. The GLA’s net cost of £313,000 will be met from the 2006/07 Cultural Events Programme budget. 2. To release £313,000 from the 2006/07 Cultural Events Programme budget for the following Cultural Events: Trafalgar Square Festival (£223,000). Liberty Disability Rights Festival (£90,000). MA 2542 Agreed: 1. For the GLA to enter into a contract with Ebb&Flow for the provision of additional creative support of the Department of Constitutional Affairs-led publicity drive to increase voter registration in the capital targeted at London 24/01/06 Ken Livingstone Redmond O’Neill The estimated gross and net cost of this project to the GLA is £80,000 and will be met from the following budgets: 2005/06 Project Development Fund (£30,000). 2005/06 Marketing budget (£50,000). urban youth at a cost of up to £80,000. 2. The award of this contract to Ebb&Flow be exempt from the provisions of the contracts code of practice for reasons of urgency and consistency with the provision of services under a pre-existing contract between Ebb&Flow and the Department of Constitutional Affairs (DCA) for the wider voter registration campaign. This project will be managed within the Marketing team. In order to facilitate effective project and budget monitoring a virement of £30,000 from the Project Development fund to a new budget line entitled ‘voter registration’, within the 2005/06 Marketing budget has been agreed. 3. A virement of £30,000 from the 2005/06 Project Development Fund ‘PDF General’ allocation to a new budget line entitled ‘Voter Registration’ within the 2005/06 Marketing budget. MA 2545 Agreed: 1. To commission Three Dragons Consultants to carry out the annual update of the GLA’s Development Control Toolkit to 2006/07 costs and values. The toolkit is used to assess the 02/02/06 Ken Livingstone Alex Bax The estimated gross and net cost of this project to the GLA is £14,310 and will be met from the 2005/06 London Plan Programme budget. viability of affordable housing contributions in development proposals. 2. To charge potential purchases of the upgraded toolkit at £125 per copy (excluding London Boroughs). 3. To waive the GLA’s Contracts Code of Practice requiring three written quotes in relation to commissioning this work. MA 2546 Agreed: 1. To publish a 24-page March 06 edition of The Londoner. 2. To delegate to the Director of Public Affairs & Transport, in consultation with the Director of Finance & Performance, the authority to increase or decrease the pagination of future editions of The Londoner according to editorial demands within the existing Londoner budget. 02/02/06 Ken Livingstone Redmond O’Neill The estimated gross cost of publishing a 24-page March 06 edition of The Londoner is £64,280 and the net cost to the GLA is Nil. These costs will be met entirely by TfL. MA 2550 MA 2553 Noted the content of TfL’s Report 25/01/06 to the Mayor on Consultation, relating to consultation with the London Assembly and Functional Bodies on Transport and Air Quality Strategy Revisions: London Low Emission Zone and approved the amended text of the document as per TfL’s recommendations, for the purposes of stakeholder and public consultation pursuant to sections 42(1) and 142 of the Greater London Authority Act 1999. Agreed Transport for London 02/02/06 (TfL) under section 38(1) of the Greater London Authority Act 1999 to exercise the Mayor’s powers under section 30 of the GLA Act to do all things necessary to facilitate and deliver the start of the Tour de France (Le Grand Depart) in London 2007 including: Entering into the Protocol and the main contract with the Amaury Sport Organisation Ken Livingstone Mark Watts There are no direct financial implications to the GLA. Ken Livingstone Mark Watts There are no direct financial implications to the GLA. (the organisers of the Tour de France). Entering into any other necessary contracts and agreements in relation to the delivery, co-ordination and promotion of Le Grand Depart. Carrying out marketing and advertising activities in relation to the promotion of Le Grand Depart 2007. MA 2559 DA 1534 DA 1541 Agreed to ratify any steps taken in anticipation and preparation of this delegation. Approved the Mayor’s response to 02/02/06 the London Pensions Fund Authority’s Strategic Policy Statement 2006-09 and the Budget Statement 2006-07. Approved an additional £10,500 17/01/06 for the completion of the research project on the London Plan sub regions. Approved the award of a contract 12/01/06 up to a value of £35,000 for a consultancy project to develop a number of scenarios to inform the Ken Livingstone Neale Coleman There are no direct financial implications to the GLA. David Lunts N/A The additional £10,500 will be met by Planning Delivery Grant. David Lunts N/A The estimated gross and net cost of this project to the GLA is £35,000 and will be met from the first review of the London Plan. DA 1547 Agreed to host a London Sikh community conference to debate and address issues affecting London’s Sikh community. 02/02/06 Redmond O’Neill N/A DA 1548 Agreed to procure consultants to undertake research into the implementation of the UK Sustainable Development Strategy in London. 09/01/06 David Lunts N/A DA 1550 DA 1552 Approved Surrender of the lease of 81 Black Prince Road with effect from March 2006 in accordance with the delegated authority agreed in MA2315. Part 2 of the report is confidential under the FOI Act. Agreed to final changes to the Pandemic Flu Response Plan 19/01/06 Anne McMeel N/A 01/02/06 Anne McMeel N/A 2005/06 London Plan Research budget. The estimated gross and net cost of this project to the GLA is £5,000 and will be met from the 2005/06 Stakeholders Programme budget. The estimated gross cost of this project is £20,000 and the net cost to the GLA is £10,000. The balance will be met by GOL. The GLA’s net cost of £10,000 will be met from the 2005/06 Sustainable Development Programme Budget. The financial implications are confidential under the FOI Act. The plan included some initial estimates of the prior to ratification by the Functional Bodies. DA 1554 Agreed to hold and fund the GLA’s Holocaust Memorial Day Ceremony on 24 January 2006 at City Hall. 24/01/06 Mark Roberts N/A costs that may be incurred. Further refinement of these estimates will be carried out during the ratification process. The estimated gross and net cost of this project to the GLA is £3,000 and will be met from the following budgets: 2005/06 Assembly Members Budget (£2,543). 2005/06 Director of Secretariat Budget (£457). DA 1557 Agreed: 1. That the GLA commission consultancy on the scope for small and medium scale demonstration photovoltaic noise barrier projects at surface locations on the London Underground system. 30/01/06 David Lunts N/A The estimated gross and net cost of this project to the GLA is £14,000 and will be met from the 2005/06 Environment Programme Budget. 2. To waive the GLA’s Contracts Code of Practice in respect of appointing TRL to carry out this specialist consultancy work. DA 1558 Approved: 01/02/06 Janet Worth N/A 1. The programme of weekend openings at City hall for 2006/07. 2. The participation in London Open House programme, including Maggie’s Charity night opening. The estimated gross and net cost of the programme of openings of City Hall and London Open House weekend is £44,700 and will be met from the following 2006/07 budgets subject to annual budget process: 2006/07 City Hall Events & Letting Budget (£41,150). DA 1559 Agreed to commission consultants 03/02/06 to conduct research into the nature of the planning system in London and its impact on housing delivery. David Lunts N/A 2006/07 City Hall Amenities Budget (£3,550). The estimated gross and net cost of this project to the GLA is £25,000 and will be met from the 2005/06 Housing Programme budget. DA 1560 Approved a variation of the contract costs for DA1546 for public opinion polling of a sample of 1,000 residents in specified districts of West London beneath the westerly landing flight paths, on aircraft noise, with particular reference to public perceptions regarding alternation in use of Heathrow’s two main runways. 02/02/06 David Lunts N/A The estimated gross and net cost of this contract is £15,700 and will be met from the following budgets: 2005/06 Environment Programme budget (£11,200). 2005/06 Public Consultation Programme budget (£4,500).