Survey
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Power engineering wikipedia , lookup
History of electromagnetic theory wikipedia , lookup
Immunity-aware programming wikipedia , lookup
Alternating current wikipedia , lookup
Smart meter wikipedia , lookup
History of electric power transmission wikipedia , lookup
Mains electricity wikipedia , lookup
Distribution management system wikipedia , lookup
Rectiverter wikipedia , lookup
Sound level meter wikipedia , lookup
Electricity market wikipedia , lookup
Electrification wikipedia , lookup
THREE-PHASE MULTI-TARIFF ELECTRICTY METER СТЭМ-3А TECHNICAL CERTIFICATE CONTENT 1. Appointment and sphere of application__________________________________ 2. Technical specifications _____________________________________________ 3. Device and principle of operation ______________________________________ 4. Interfaces and record of load profile______________________________ 5. Self-Diagnostics __________________________________________________ 6. Software __________________________________________________ ______ 7. Overall and mounting dimensions ____________________________________ 8. Wiring diagram _______________________________________________ 9. The procedure of preparation and installation ___________________________ 10. Calibration ______________________________________________________ 11. Safety requirements _________________________________________________ 12. Sales Package_____________________________________________________ 13. Package _________________________________________________________ 14. Trasnsportation ___________________________________________________ 15. Storage _________________________________________________________ 16. Manufacturer's warranty ___________________________________________ 17. Certificate of acceptance __________________________________________ _ 2 3 3 4 7 7 7 8 8 9 9 9 10 10 10 10 10 11 1. Appointment and sphere of application Three-phase multi-tariff electricity meter СТЭМ-3А (Three-phase Multi-function Electricity Meter TMEM-3A) is a multi-function, programmable electricity meter of direct switching with a microprocessor, which is dedicated for accounting active energy of AC with frequency of 50Hz, as well as to work as part of an Automated Energy Control and Metering System. Electricity meter is designed for use in enclosed spaces. Requirements for meter accuracy and accuracy testing correspond to GOST 30206-94 standards, and other requirements (definition, technical and etc.) to GOST 52320-2005 standards. Safety degree of exploitation of this electricity meter corresponds to the 2nd class of protection by GOST 26104 standards, and the degree of protection by IP51 scale, coded in accordance with GOST 14254. 2. Technical specifications 2.1. Nominal Voltage, V 2.2. Nominal current, A 2.3. Max. current, A 2.4. Nominal frequency, Hz 2.5. The gear ratio, imp / kWh 2.6. Storing data in the absence of main power, not less than, years 2.7. The sensitivity threshold, not more than, W 2.8. The number of tariffs, up to 2.9. The number of tariff zones, up to 2.9. Accuracy class 2.10. The data transfer speed, bps 2.11. Self-propelled meter 2.12. Power consumption, not more than, V*A 2.13. Self-control, a / d 2.14. The level of information security 2.15. Temperature operating range, C 2.16. Relative humidity, at 25 C, % 2.17. The atmospheric pressure, kPa (mmHg.) 2.18. Weight, not more than, kg 2.19 Overall dimensions, mm 2.20. Calibration interval, years 2.21. Warranty period, years 2.22 Service lifetime, years 3 3х220х280 5 10/50/80 50±5% 10000 6 1.25 4 24 0.2S, 0.5S 9600 no 5 1 3 -20+55 90 70-106,7 (537-800) 1 280х173х70 5 3 25 3. Device and principle of operation 3.1. Main units The meter consists of a case, an electronic unit and terminal. 3.1.1. Case The case of electricity meter correspond to requirements of GOST 30207-94 standards. On the front side of the case are liquid crystal display (LCD), LED interface and scoreboard with appropriate information in accordance with GOST 25372 standards. LCD, LED and name plate installed behind high-strength window, which is sealed from inside by the manufacturer. On the bottom on the case fixed an e-node and terminal, through which the electricity meter is connected to the electrical, data and calibration circuits. Terminal closes with a separate cover, which can be sealed. The case cover being sealed by the manufacturer and the National Standards Body, and the terminal cover by the parties concerned (electricity network, power control, etc.). 3.1.2. Electronic unit The electronic unit consists of microprocessor and LCD boards. On the microprocessor board are located power supply capacitor, electronic button, manual button of operation behind the front cover of the electricity meter, specialized super-power (VLSI) integrated circuit, 8-bit microcontroller for data processing and logging, electrically reprogrammable ROM (EEPROM) for storage of load profile, configuration data and auxiliary constants, EEPROM reset scheme, shunt resistor, resistive voltage divider, quartz generator and powerful lithium battery. On the LCD board are located LCD and LED.. 3.2. Principle of operation Information about the measurable values of voltage and current through a voltage divider and shunt resistor arrives at the VLSI, where is the analog-to-digital conversion. After that, the recieved digital information is programmed in the microprocessor, which determines the current tariff, provides and coordinates the work EEPROM, LCD and interfaces. The electronic unit is mainly powered from electrical network, using a capacitor power supply. During the periods of the main power absence the built-in lithium battery provides the operation of internal electronic clock, and the non-volatile memory provides the data storage, including information about the software presets during the operation of the meter. LCD displays the necessary information. Data on the LCD display has two modes - automatic and manual. Amount of displayed information and its sequence determined by the software. 3.3. Block diagram of the electricity meter 4 ROM (EEPROM) I1, I2, I3 Current transformator crystals Ib VLSI U1, Ic U2, U3 Resistive measurement Microcontro ller Interfaces divider LCD Power Lit. Supply Battery 3.4. Protection of electricity meter and data security In order to protect electricity meter from unauthorized access to their operation we implemented design, software and technical solutions that provide the protection of eclectricity meters and data. • In addition, that each electricity meter has individual password used for communication with external devices (portable device PRO UNIT or PC) the programs also have passwords. The meter records the opening of the cover (authorized and unauthorized) and the last date of opening. Case design and used materials do not allow unauthorized access without dealing mechanical damage to the case or disrupting seals. Provided the data storage in case of main power absence, as well as in case of lithium battery replacement. Electricity meter records the date of turning on/off phases and zero, interruption and restore of main power. 3.5. Display of information Display of the required information is on the LCD, which consists of 8-digit digital segments and additional inscriptions. Using the digital segment, additional inscriptions and the ability of programmable periodic indication of each information from 1 to 127 seconds, the LCD indicates the information with the following sequence and configuration: The table shows a diagram of the LCD display of three-phase meter and description of the parameters. 5 Параметр Left side Center Date 12.03.2005 Time 12:12:12 Total Active Total energy 888888.88 T1 Active Tariff 1 888888.88 T2 Active Tariff 2 888888.88 T3 Active Tariff 3 888888.88 T4 Active Tariff 4 888888.88 Active Total Power P 88.888 Cos CosA, Active PowerA 0.00 8.888 Cos CosB, Active PowerB 0.00 8.888 Cos CosC, Active PowerC 0.00 8.888 Total Reactive Total energy 888888.88 T1 Reactive Tariff 1 888888.88 T2 Reactive Tariff 2 888888.88 T3 Reactive Tariff 3 888888.88 T4 Reactive Tariff 4 888888.88 Reactive Total Power P 88.888 Cos SinA, Reactive Power A 0.00 8.888 Cos SinB, Reactive Power B 0.00 8.888 Cos SinC, Reactive Power C 0.00 8.888 Total Power P 88.888 Total Power A 8.888 Total Power B 8.888 Total Power C 8.888 Angle AB 888.8 o Angle BC 888.8 o Angle AC 888.8 o VoltageA, CurrentA 0.00A 888 VoltageB, CurrentB 0.00A 888 VoltageC, CurrentC 0.00A 888 Frequency F 88.88 Note: 1. Underlined characters are flashing Right side KW h KW h KW h KW h KW h KW h kW kW kW kVarh kVarh kVarh kVarh kVarh kVar kVar kVar kVar VA VA VA VA V V V Hz Description Дата Время Всего по всем тарифам (активная) Всего по первому тарифу (активная) Всего по второму тарифу (активная) Всего по третьему тарифу (активная) Всего по четвертому тарифу (активная) Общая активная мощность Косинус фи и мощность фазы А Косинус фи и мощность фазы В Косинус фи и мощность фазы С Всего по всем тарифам (реактивная) Всего по первому тарифу (реактивная) Всего по второму тарифу (реактивная) Всего по третьему тарифу (реактивная) Всего по четвертому тарифу (реактивная) Общая реактивная мощность Синус фи и мощность фазы А Синус фи и мощность фазы В Синус фи и мощность фазы С Общая полная мощность Полная мощность фазы А Полная мощность фазы В Полная мощность фазы С Угол между фазами А и В (в градусах) Угол между фазами В и С (в градусах) Угол между фазами А и С (в градусах) Ток и напряжение фазы А (ампер, вольт) Ток и напряжение фазы B (ампер, вольт) Ток и напряжение фазы C (ампер, вольт) Частота сети 2. means the phase "A", etc. 3.5.3. In addition to the information listed in paragraph 3.5.2., the following information is also displayed on the LCD: Information about the need to replace the lithium battery is displayed on the left side of the digital segments with inscription com, which flashes at a frequency of 1 Hz. Information about error found during self-diagnostics, is displayed on the right side of the digital segments with inscription Error, which flashes at a frequency of 1 Hz. 6 Information about the current tariff is displayed at the bottom of the digital segments during the whole period of validity of the tariff with inscription (T1, T2, etc.), which flashes at 1 Hz. Opening of the case cover (authorized and unauthorized) causes flashing of all digital segments and additional inscriptions on LCD with a frequency of 1 Hz. 3.5.4. Duration of displaying data on LCD, the number of tariffs and the time of their action are programmed according to customer requirements. 4. Interfaces and load profile record 4.1. Interfaces Depending on the modification electricity meter can have different interfaces (Data exchange). 4.1.1. Digital serial interface The digital serial interface that is used in the meter could be of type "Current Loop" or optocoupler. 4.1.2. Optical interface The appointment of interface is to provide data exchange with the meter. For the connection is used portable device PRO UNIT (with the corresponding optical sensor) or PC with special software. 4.1.2. Interfaces of control of the electricity meter For electricity meter calibration is used telemetry interface. 4.2. Record Of the load curve The load curve record is carried out in specially allocated memory 300 and allows to record the daily load curve with 30-minute intervals. Reading the load curve is carried out by external devices (portable device PRO UNIT or PC) using a software package SEMNET. 5. Self-Diagnostics of the meter 5.1. Electricity meter is equipped with self-diagnostics system, which is activated and works once a day, as well as every time when the meter is switched in electrical network. During the self-diagnostics are tested all the main sectors: microcontroller, EEPROM, LCD, etc. If the meter detects a condition that affects its normal functioning, then the LCD displays message about error. 5.2. During the self-diagnostics the battery level is also checked. Information about the need to replace the lithium battery is displayed a month before full battery depletion. Battery replacement during this period of time will provide uninterrupted work of the meter. Lifetime of lithium battery is 10 years. 5.3. Self-diagnostic results are recorded in the meter and can be read by external devices, via appropriate interface. 5.4. The information about the condition that affects normal functioning of the meter will stay on the LCD until the removal of cause of error. 6. Software 6.1. The measurement process is a continuous measurement of signals received from the VLSI. Using the software, we compute all the necessary parameters. 7 6.2. The basic configuration of the electricity meter is programmed by the manufacturer in accordance with the requirements of the Customer. The protection system allows you to access different levels of programming and reading. 6.3. Each electricity meter has a password that is used for data exchange between the meter and the external devices (portable device PRO UNIT or PC). 7. Overall and mounting dimensions Mounting dimensions and position of the LCD is fully correspond to installation dimensions and position of scoreboard of three-phase induction meters. 220 280 155 70 173 8 8. Wirig diagram of electricity meter Transformer connection of the meter to electrical, information and control circuits is executed via terminal block, according to the following scheme: Telemetric output Digital Serial interface 1 2 3 4 5 6 131212121111112131113 7 8 9 10 11 12 13 A B C N L O A D Direct connection of the meter to electrical, information and control circuits is executed via terminal block, according to the following scheme: Telemetric output Digital Serial interface 1 2 3 4 5 6 13 131212121111112131113 A B C N 7 8 9 10 11 12 L O A D 9 9. The procedure for preparation and installation 9.1. Before installing the meter it is necessary to inspect and verify that there is no mechanical damage, and the seal which is specified by the manufacturer and the National Standards Body is not broken. 9.2. The meter can be installed and exploited in enclosed spaces, in compliance with following conditions: Temperature operating range, C Relative humidity, at 25 C, % The atmospheric pressure, kPa (mmHg.) -20+55 90 70-106,7 (537-800) 9.3. Open the cover of terminal 9.4. Install the electricity meter and fasten with three screws 9.5. Check and verify the absence of voltage in the external electric circuit. 9.6. Using the connection diagram, which is represented in this passport and can found on the nameplate of electricity meter, connect meter to electrical, information and control circuits and firmly tighten the wires to the terminals. 9.7. Supply voltage. The LCD will display information, the value and sequence of which is given in paragraph 3.5. 9.8. In the presence of load, flashing LED indicates the process of electricity metering. 10. Calibration 10.1. The electricity meter shall be subject to the state primary periodic verification. 10.2. Calibration is performed according to the Calibration Method __________________ 10.3. Calibration interval is _____ years. 10.4. The meter is equipped with a telemetry interface and LED for calibration. 11. Safety requirements 11.1. Safety degree of exploitation of this electricity meter corresponds to the 2nd class of protection by GOST 26104 standards, and the degree of protection by IP51 scale, coded in accordance with GOST 14254. 11.2. The electrical resistance between the shell and the electrical circuits shall not be less than: 20 Megohms - under normal climatic conditions 5 Megohms - with an upper value of the operating temperature and relative humidity of not more than 80%. 11.3. Electrical isolation of circuits upon the shell and with each other under normal test conditions, must withstand during one minute impact test voltage AC sinusoidal form 2000 v at 45-55 Hz. 11.4. Installation, connection and exploitation of the electricity meter should be carried out strictly in accordance with "Rules of technical exploitation of electrical installations" and the provisions of this technical certificate. 11.5. In order to avoid breakage and electric shock, it is strictly prohibited: To put or hang any items on the electricity meter To hit the shell and conjugation devices 10 12. Sales Package 12.1. Three-phase multi-tariff electricity meter CТЭМ-3А (TMEM-3A) 12.2. Terminal cover with a screw 12.3. Technical certificate 12.4. Warranty card 12.5. Packing box -1pc. -1pc. -1pc. -1pc. -1pc. 13. Package The electricity meter is packed into a cardboard box with a size of 300х190х100 mm. For transportation they stack 10 pieces of electricity meters in additional cardboard shipping container with a size of 380х300х500 mm. 14. Transportation 14.1. The climatic conditions of transportation must satisfy the following conditions: Temperature operating range, C Relative humidity, at 25 C, % The atmospheric pressure, kPa (mmHg.) -50+70 95 70-106,7 (537-800) 14.2. The meter can be transported by any means of transport, provided protection from the direct influence of atmospheric precipitation and compliance with the abovementioned conditions of transportation. 15. Storage 15.1. Before starting operation the meter should be stored in a box in storage, where the temperature is 0-40 C, and the relative humidity at 35 C should be 80. 15.2. The meter without packaging can be stored at a temperature of 10-35 °C and relative humidity of 80% at 25 °C. 16. Manufacturer’s warranty 16.1. The warranty period of exploitation is ____ years from the date of sale of electricity meter. 16.2. After the warranty period, for repairing of the meter pays the Customer/Consumer. 16.3. During the lifetime of the meter the manufacturer provides repairing and modernization of the meter, even if the meter is out of production. For post-warranty repair and modernization pays the Customer/Consumer. 16.4. The manufacturer must provide warranty repair of the meter: If you abide the terms of transportation, storage, installation and exploitation contained in this technical certificate. If the manufacturer's seals are not disrupted In the absence of physical damage of the shell and the viewing window If you have this technical certificate and the warranty card 11 17. Certificate of acceptance Three-phase multi-tariff electricity meter СТЭМ-3А with the serial number _____________ verified and corresponds to GOST 30206-94, GOST 30207-94 standards, and is valid for operation. Stamp of the main controller ______________________________ Date of production ________________ Stamp and signature of the seller Date of Sale _________________________ ______________________ Warranty service is valid until __________________________ 12