Microsoft ® Word version
... be shipped separately with the chassis. Where >100A main fuses are specified, equipment shall be shipped with main fuses installed. Where <=100A main fuses are specified, fuses shall be shipped separately with the chassis. ...
... be shipped separately with the chassis. Where >100A main fuses are specified, equipment shall be shipped with main fuses installed. Where <=100A main fuses are specified, fuses shall be shipped separately with the chassis. ...
Eaton Presentation from May 2014
... 1.1 These requirements cover ignition transformers for use with gas burners and oil burners and specialty step-up transformers used in applications such as insect electrocuting. Transformers incorporating overcurrent or over-temperature protective devices, transient voltage surge protectors, or powe ...
... 1.1 These requirements cover ignition transformers for use with gas burners and oil burners and specialty step-up transformers used in applications such as insect electrocuting. Transformers incorporating overcurrent or over-temperature protective devices, transient voltage surge protectors, or powe ...
Microwave Generator For Scientific And Medical Applications
... Abstract. Nowadays power microwave radiation is widely used in medical applications as hyperthermia, diathermy or ablation and for scientific applications such as plasma generation, digestion, or as a catalyst in green chemistry. Nevertheless, designing a suitably adapted microwave generator that me ...
... Abstract. Nowadays power microwave radiation is widely used in medical applications as hyperthermia, diathermy or ablation and for scientific applications such as plasma generation, digestion, or as a catalyst in green chemistry. Nevertheless, designing a suitably adapted microwave generator that me ...
R280-90-7
... A transient fault is one that does not require corrective action to remove the fault from the system. If the arc can be cleared quickly, before burning into a permanent fault, the cause of the fault is gone. Since no equipment damage has occurred, the circuit can be re-energized immediately and serv ...
... A transient fault is one that does not require corrective action to remove the fault from the system. If the arc can be cleared quickly, before burning into a permanent fault, the cause of the fault is gone. Since no equipment damage has occurred, the circuit can be re-energized immediately and serv ...
DCA-20PC Series - Murata Power Solutions
... designed to measure. This current enters TB-1 (-SHUNT), passes through the ammeter’s built-in shunt and exits via TB1-2 (+SHUNT). For all models, this same fullscale load current can also be routed, if the user so chooses, through TB2-1 and TB2-2 (connection to positive rail of power supply). See de ...
... designed to measure. This current enters TB-1 (-SHUNT), passes through the ammeter’s built-in shunt and exits via TB1-2 (+SHUNT). For all models, this same fullscale load current can also be routed, if the user so chooses, through TB2-1 and TB2-2 (connection to positive rail of power supply). See de ...
DESIGN OF TRANSFORMER
... capability of withstanding forces produced under short circuit as these windings are surrounded and supported by the core. But in a core type transformer windings have a poorer mechanical strength. ...
... capability of withstanding forces produced under short circuit as these windings are surrounded and supported by the core. But in a core type transformer windings have a poorer mechanical strength. ...
ElEctricity
... Italian Alessandro Volta (1745–1827) thought electricity came only from contact between two metals; he called it metallic electricity. He was not absolutely correct, either. But Volta did invent the earliest electric cell, which became known as the voltaic pile. It used two different metals, separat ...
... Italian Alessandro Volta (1745–1827) thought electricity came only from contact between two metals; he called it metallic electricity. He was not absolutely correct, either. But Volta did invent the earliest electric cell, which became known as the voltaic pile. It used two different metals, separat ...
BU52072GWZ - ROHM Semiconductor
... Ensure that the direction and position are correct when mounting the IC on the PCB. Incorrect mounting may result in damaging the IC. Avoid nearby pins being shorted to each other especially to ground, power supply and output pin. Inter-pin shorts could be due to many reasons such as metal particles ...
... Ensure that the direction and position are correct when mounting the IC on the PCB. Incorrect mounting may result in damaging the IC. Avoid nearby pins being shorted to each other especially to ground, power supply and output pin. Inter-pin shorts could be due to many reasons such as metal particles ...
Outline of Content - College of Micronesia
... The basic operation and maintenance of manufacturer recommendations, safety and statutory requirements the systems in 7.1 in accordance with are demonstrated. Common electrical faults, their causes, effects, basic fault finding procedures, and ...
... The basic operation and maintenance of manufacturer recommendations, safety and statutory requirements the systems in 7.1 in accordance with are demonstrated. Common electrical faults, their causes, effects, basic fault finding procedures, and ...
SABS 1574 (2001)
... A cable, the conductors, insulation and covering of which are such as to afford flexibility. Circuit-breaker 断路器 A switch suitable for opening a circuit automatically, as a result of predetermined conditions such as those of over-current or under-voltage, or by some form of external control. Class I ...
... A cable, the conductors, insulation and covering of which are such as to afford flexibility. Circuit-breaker 断路器 A switch suitable for opening a circuit automatically, as a result of predetermined conditions such as those of over-current or under-voltage, or by some form of external control. Class I ...
MAX8830 LED Light Management IC in 2.5mm x 2.5mm UCSP General Description
... loads, such as audio amplifiers. The output voltage is programmable from 3.8V to 5.2V (in 100mV steps) through the I2C port. If the output voltage is not programmed, the step-up converter remains off; however, if any of the current regulators are programmed, the boost converter p-channel synchronous ...
... loads, such as audio amplifiers. The output voltage is programmable from 3.8V to 5.2V (in 100mV steps) through the I2C port. If the output voltage is not programmed, the step-up converter remains off; however, if any of the current regulators are programmed, the boost converter p-channel synchronous ...
SEL-787 Transformer Protection Relay Data Sheet
... restraint. Phase, negative-sequence, residual-ground, and neutral-ground overcurrent elements for backup protection. Breaker failure protection for two three-pole breakers. Optional Protection Features. Use the SEL-787 with optional voltage inputs to provide volts/hertz protection with frequency tra ...
... restraint. Phase, negative-sequence, residual-ground, and neutral-ground overcurrent elements for backup protection. Breaker failure protection for two three-pole breakers. Optional Protection Features. Use the SEL-787 with optional voltage inputs to provide volts/hertz protection with frequency tra ...
MC34653, 1.0 A Negative Voltage Hot Swap Controller
... Charging Current Limit, respectively. The device then initiates the start-up timer (Point A in Figure 6) and checks for the start-up conditions (see next paragraph). The duration of the timer is a default value. For undervoltage and overvoltage faults during power up the 34652 retries infinitely unt ...
... Charging Current Limit, respectively. The device then initiates the start-up timer (Point A in Figure 6) and checks for the start-up conditions (see next paragraph). The duration of the timer is a default value. For undervoltage and overvoltage faults during power up the 34652 retries infinitely unt ...