• Study Resource
  • Explore
    • Arts & Humanities
    • Business
    • Engineering & Technology
    • Foreign Language
    • History
    • Math
    • Science
    • Social Science

    Top subcategories

    • Advanced Math
    • Algebra
    • Basic Math
    • Calculus
    • Geometry
    • Linear Algebra
    • Pre-Algebra
    • Pre-Calculus
    • Statistics And Probability
    • Trigonometry
    • other →

    Top subcategories

    • Astronomy
    • Astrophysics
    • Biology
    • Chemistry
    • Earth Science
    • Environmental Science
    • Health Science
    • Physics
    • other →

    Top subcategories

    • Anthropology
    • Law
    • Political Science
    • Psychology
    • Sociology
    • other →

    Top subcategories

    • Accounting
    • Economics
    • Finance
    • Management
    • other →

    Top subcategories

    • Aerospace Engineering
    • Bioengineering
    • Chemical Engineering
    • Civil Engineering
    • Computer Science
    • Electrical Engineering
    • Industrial Engineering
    • Mechanical Engineering
    • Web Design
    • other →

    Top subcategories

    • Architecture
    • Communications
    • English
    • Gender Studies
    • Music
    • Performing Arts
    • Philosophy
    • Religious Studies
    • Writing
    • other →

    Top subcategories

    • Ancient History
    • European History
    • US History
    • World History
    • other →

    Top subcategories

    • Croatian
    • Czech
    • Finnish
    • Greek
    • Hindi
    • Japanese
    • Korean
    • Persian
    • Swedish
    • Turkish
    • other →
 
Profile Documents Logout
Upload
JEDEC STANDARD
JEDEC STANDARD

Full-power converter based test bench for low voltage
Full-power converter based test bench for low voltage

... the voltage dip seen at the wind turbine power converter terminal is taken into account in the fullpower converter based test bench by the inductance L1, value of which is selected to be equal to the transformer short-circuit reactance. Naturally, the need of inductance L1 between the grid emulator ...
Section 26 36 23 - AUTOMATIC TRANSFER SWITCHES
Section 26 36 23 - AUTOMATIC TRANSFER SWITCHES

8. TESTING POWER TRANSFORMERS
8. TESTING POWER TRANSFORMERS

... When transformers are received from the factory or reallocated from another location it is necessary to verify that each transformer is dry, no damage has occurred during shipping, internal connections have not been loosened, the transformer’s ratio, polarity, and impedance agree with its nameplate, ...
Users Manual - Test Equipment Depot
Users Manual - Test Equipment Depot

... Read “Safety Information” before using the meter. The Fluke 789 ProcessMeter (referred to as “the meter”) is a handheld, battery-operated tool for measuring electrical parameters, supplying steady or ramping current to test process instruments, and providing a > 24 V loop power supply. It has all t ...
EIAJ ED-4701/300
EIAJ ED-4701/300

... storage of SMD in the dry pack (the worst case is 30°C, 30%RH) shall be performed, and subsequently, the second stage moisture soaking corresponded to the allowable maximum storage condition after opening the dry pack (Floor life) shall be started within 4h after finishing the first stage moisture s ...
EMC Directive 2004/108/EC
EMC Directive 2004/108/EC

... telecommunications or other equipment • Has a level of immunity to electromagnetic disturbances expected in it’s intended environment ...
TS®100 Cable Fault Finder
TS®100 Cable Fault Finder

Page 1 of 12
Page 1 of 12

... control interface allow programming of equipment functions from an external computer. ...
Fuel Cell Specification Notes
Fuel Cell Specification Notes

... from -50F to 135F at sea level; and from -50F to 95F at 4,000 feet. High temperature requirement remains at 95F at altitudes above 4,000 feet. Altitudes up to & including 10,000 feet. Rated load may be reduced by 3.5 percent for each 1,000 foot increment above 4,000 feet, e.g., at 10,000 feet r ...
IS 6008 (1989): Arc Welding Power Source, Single Operator
IS 6008 (1989): Arc Welding Power Source, Single Operator

... means of indicating the load current which takes into account the relationship between conventional load voltage and conventional welding current as given in Table 1. The accuracy of this indication shall be within &lo percent of the true value unless the maximum output current exceeds ten times the ...
ppt - SLAC
ppt - SLAC

RevG_158_Attach
RevG_158_Attach

... Electrical Power Input Parameter Limits (dc) ..................................................................... 16-23 16.6.1 Normal Operating Conditions (dc) ................................................................................... 16-24 16.6.1.1 Voltage (Average Value dc) ............. ...
a 1 pC Charge Injection, 100 pA Leakage CMOS ADG604
a 1 pC Charge Injection, 100 pA Leakage CMOS ADG604

... Positive Supply Current Negative Supply Current Source Terminal. May be an input or output. Drain Terminal. May be an input or output. Ohmic Resistance between D and S On Resistance Match between any two channels, i.e., RON Max – RON Min Flatness is defined as the difference between the maximum and ...
Insulation monitoring Vigilohm Merlin Gerin
Insulation monitoring Vigilohm Merlin Gerin

TRANSIENT VOLTAGE SURGE SUPPRESSORS 16709
TRANSIENT VOLTAGE SURGE SUPPRESSORS 16709

... Any SPD which shows evidence of failure or incorrect operation during the ten year warranty period shall be repaired or replaced at no expense to Owner including labor and materials. Since "Acts of Nature" or similar statements include the lightning threat to which these suppression devices shall be ...
On the selection and installation of surge protection devices in a TT
On the selection and installation of surge protection devices in a TT

... through the SPD at Zone-1 gives rise to the voltage V1 which is predominately determined by the inductance of the current path. Hence, the contribution of the mostly uniform continuing current to the voltage V1 is insignificant compared to that of the impulse component. SPDs in Zones-2 and 3 are subj ...
Using Electrostatic Discharge Test Method for Full
Using Electrostatic Discharge Test Method for Full

... usually designed within the specific process and or between two processes. In current practice, the choice of dissipative materials relies on the DC resistance measurement or test [4] at a single voltage point. This may also be complimented by a charge decay time test using a Charge Plate Monitor [5 ...
Battery Charge Regulator (BCR)
Battery Charge Regulator (BCR)

... The four BCR from the same production lot are required, and then one sample is taken for inspection of completeness documentation and marking. ...
Keysight Technologies Right Load Switching and Simulation Design
Keysight Technologies Right Load Switching and Simulation Design

... For a typical mechatronic device under test (DUT) such as engine control unit (ECU), it usually has 200 to 450 pins. To make the situation tougher, this kind of DUT usually involves high power testing with many pins that carry current of more than 5 Amps. By taking the ECU example, to check pin by p ...
Annex (A), Technical Specifications
Annex (A), Technical Specifications

... All equipment, including accessories, shall be packed and securely clamped against movement in robust, non-returnable packing cases to ensure safe transit from the manufacturer's works to the agreed point of delivery. The base of the packing case shall be strong enough to carry the weight of the tra ...
CM-Line Catalog
CM-Line Catalog

Datasheet
Datasheet

... Vishay makes no warranty, representation or guarantee regarding the suitability of the products for any particular purpose or the continuing production of any product. To the maximum extent permitted by applicable law, Vishay disclaims (i) any and all liability arising out of the application or use ...
JDSU datasheet template
JDSU datasheet template

... Full duplex, hands-free, self-powered communications Link up to four units together for party-line use Built-in ringer and ability to signal other end Works with any two unused wires, including coax, romex, UTP, STP ...
1 - Fel Zcu - Západočeská univerzita
1 - Fel Zcu - Západočeská univerzita

< 1 ... 20 21 22 23 24 25 26 27 28 ... 171 >

Portable appliance testing



Portable appliance testing (commonly known as ""PAT"", ""PAT Inspection"" or ""PAT Testing"") is the name of a process in the United Kingdom, the Republic of Ireland, New Zealand and Australia by which electrical appliances are routinely checked for safety. The correct term for the whole process is ""in-service inspection & testing of electrical equipment"".Similar procedures exist in other countries, for example, testing of equipment according to DGUV Vorschrift 3 in Germany.Health and safety regulations require that electrical appliances are safe and maintained to prevent harm to workers. Many equipment manufacturers recommend testing at regular intervals to ensure continual safety; the interval between tests depending on both the type of appliance and the environment in which it is to be used. The European Low Voltage Directive governs the manufacture or importation of electrical appliances. Compliance to this has to be declared and indicated by the display of the CE mark on the product. The responsibility for this lies with the manufacturer or the importer and is policed by Trading Standards.Testing equipment has been specifically developed for PAT inspections, based on the testing equipment used by manufacturers to ensure compliance with the British Standard Code of Practice and European product standards relevant to that type of appliance. This in turn allows testing and the interpretation of results to be de-skilled to a large extent. The inspection of the appliances can largely be carried out in-house in many organisations. This can result in cost savings and more flexibility as to exactly when a PAT is carried out.
  • studyres.com © 2025
  • DMCA
  • Privacy
  • Terms
  • Report