• Study Resource
  • Explore
    • Arts & Humanities
    • Business
    • Engineering & Technology
    • Foreign Language
    • History
    • Math
    • Science
    • Social Science

    Top subcategories

    • Advanced Math
    • Algebra
    • Basic Math
    • Calculus
    • Geometry
    • Linear Algebra
    • Pre-Algebra
    • Pre-Calculus
    • Statistics And Probability
    • Trigonometry
    • other →

    Top subcategories

    • Astronomy
    • Astrophysics
    • Biology
    • Chemistry
    • Earth Science
    • Environmental Science
    • Health Science
    • Physics
    • other →

    Top subcategories

    • Anthropology
    • Law
    • Political Science
    • Psychology
    • Sociology
    • other →

    Top subcategories

    • Accounting
    • Economics
    • Finance
    • Management
    • other →

    Top subcategories

    • Aerospace Engineering
    • Bioengineering
    • Chemical Engineering
    • Civil Engineering
    • Computer Science
    • Electrical Engineering
    • Industrial Engineering
    • Mechanical Engineering
    • Web Design
    • other →

    Top subcategories

    • Architecture
    • Communications
    • English
    • Gender Studies
    • Music
    • Performing Arts
    • Philosophy
    • Religious Studies
    • Writing
    • other →

    Top subcategories

    • Ancient History
    • European History
    • US History
    • World History
    • other →

    Top subcategories

    • Croatian
    • Czech
    • Finnish
    • Greek
    • Hindi
    • Japanese
    • Korean
    • Persian
    • Swedish
    • Turkish
    • other →
 
Profile Documents Logout
Upload
Contracting Strategy of Project Management
Contracting Strategy of Project Management

... the profit of his current contract, and his bonus is directly linked to his company’s profitability. Therefore the way to maximize profitably is to build as low cost as possible while meeting the contract specifications and company’s project quality inspections. Reimbursable Cost (RC) Reimbursable C ...
Software Project Management (Lecture 9)
Software Project Management (Lecture 9)

... intermediate COCOMO models Both models: consider a software product as a single homogeneous entity: However, most large systems are made up of several smaller sub-systems. Some sub-systems may be considered as organic type, some may be considered embedded, etc. for some the reliability requirem ...
Chapter 7
Chapter 7

... be paid when the building is handed over, so that they do not part with their money until the time when they should be receiving an income from the building or have the benefit of occupation of it. • The method of paying for the work has to be related to the circumstances of each contract. The contr ...
Chapter 14 - Webcourses
Chapter 14 - Webcourses

... Where q = quantity, f = fixed setup cost, M = total units produced annually, k = cost of storing one unit for one year. ...
BCF Capabilities Brief 2015 - Charleston Defense Contractors
BCF Capabilities Brief 2015 - Charleston Defense Contractors

... requisite project management support staff in order to plan and manage the ITER Project Baseline. Project support will be required in multiple areas including: • Business Process assessment, planning & reporting, and implementation • Document processes that are not identified in the existing Operati ...
OPERATIONS MANAGEMENT: Break-Even Analysis Advantages
OPERATIONS MANAGEMENT: Break-Even Analysis Advantages

... fixed and variable costs. The introduction of semi-variable costs will make the technique more complicated. ...
FACTORS AFFECTING the EXIT of MICRO and SMALL
FACTORS AFFECTING the EXIT of MICRO and SMALL

... High tax rates ...
ABDEGIJK is the project`s critical path
ABDEGIJK is the project`s critical path

... All activities on the critical path have zero slack Slack defines how long non-critical activities can be delayed without delaying the project Slack = the activity’s late finish minus its early finish ...
job costing - GEOCITIES.ws
job costing - GEOCITIES.ws

... the allocation basis used to allocate the costs in the cost pool to the cost object. For example, machine hours might be the cost-allocation base used to allocate equipment maintenance costs to the products produced since there is usually a cause-and-effect relationship between the number of machine ...
Contract Issues that Affect Project Management
Contract Issues that Affect Project Management

... • No adjustment based on actual cost ...
Designer-Led Design/Build – No Finger Pointing During Construction
Designer-Led Design/Build – No Finger Pointing During Construction

... traditional design-bid-build and design-build. In a typical CM/GC scenario, the owners of a project hire either a general contractor or design firm to serve as the construction manager, placing responsibility for design review, design modifications, system integration, and construction with that sin ...
Improve the capital investment decision-making process
Improve the capital investment decision-making process

... must prepare for change-order negotiation from a position of strength. The only knowledgeable path forward for an organization is to approach this challenge through a united, interdisciplinary project team using a standard basis for decision-making. Such a team can define the impact on project econo ...
Marginal costing
Marginal costing

... prior to production rather than to control out cost during the production phase. Negotiate with the customer before making the decision about whether to go ahead with the project. With target costing there is focus on. (1) Price - led costing (2) Customers, customer’s requirements for quality, cost ...
Project planning - Marwah Alaofi
Project planning - Marwah Alaofi

...  Estimates are made to discover the cost of producing a software system: Hardware, software, travel, training and effort costs.  There is not a simple relationship between the development cost and the price charged to the customer.  Broader organisational, economic, political and business conside ...
Chap014bb (3)
Chap014bb (3)

... Part 3 If 15,000 BDs are produced, we would expect the cost of the plastic for the BDs to increase to $1,500 (15,000 BDs x $0.10/BD), but the cost per unit to stay at $0.10 per BD. Variable costs increase in total as the number of units produced increases, but the unit cost remains constant. Part 4 ...
TenStep Methodology Recommendation
TenStep Methodology Recommendation

... The TenStep Project Management Process is a methodology for managing work as a project. TenStep provides the information necessary to successfully manage projects, including processes, procedures, techniques, best practices training and templates. This is by far their most popular product. ProgramSt ...
Project Management
Project Management

... PERT – Program Evaluation and Review Technique – probabilistic When considering a particular activity, every other activity can be classified with respect to it: Predecessor activity – one that must be completed before the given activity can be started Successor activity – can be started only after ...
Q-MAC Electronics - AT
Q-MAC Electronics - AT

... Exports to 107 Countries International Dealer and Support Network In-house Research, Design and Marketing ...
17_Ch10
17_Ch10

... Quality and IT Projects Customers have difficulty explaining exactly what they want in an IT project. ...
Financial analysis
Financial analysis

... Permanent staff: Civil servants Besides all documents required for permanent staff we also require the following: • In case of over-time – proof of payment of overtime or proof of the additional days granted by the public body for compensating the overtime worked in the project • In case the person ...
introduction
introduction

... management decisions because the decisions are based on contribution margin rather than product costs. By subtracting the relevant fixed costs from the contribution margin, different contribution margins or different layers can be obtained. Example: If there are fixed Research and Development or Adv ...
UWA Full Costing on External Research Grants
UWA Full Costing on External Research Grants

... In many collaborative external grant applications it may be the case that fully costed staff time can be counted as a cash rather than in-kind commitment to the project. Increasingly we are finding that our partners are doing this with the quite reasonable justification that staff time bares a real ...
ppt - UCT
ppt - UCT

...  Project size: as size increases the interdependency of elements also grows. Watch out for scope creep (when customers change requirements mid-cycle)  The degree of structural uncertainty: the degree to which requirements are solidified and the ease of functional decomposition ...
What is project management?
What is project management?

... Define the design brief or quality objectives Create quality outcomes or Build a quality specification Monitor quality outputs during project delivery to ensure compliance and adjust if needed • Identify defects and manage rectification • Operational systems training • Handover meeting with client/ ...
class group cases – acct 2302
class group cases – acct 2302

... 4. An unfavorable change in business is remotely possible; in this case, production and sales volume for 2015 could fall to 12,000 units. How much income (or loss) from operations would occur if sales volume falls to this level? CLASS GROUP CASES – ACCT 2302 ...
< 1 ... 3 4 5 6 7 8 9 10 11 13 >

Cost estimate

A cost estimate is the approximation of the cost of a program, project, or operation. The cost estimate is the product of the cost estimating process. The cost estimate has a single total value and may have identifiable component values. A problem with a cost overrun can be avoided with a credible, reliable, and accurate cost estimate. An estimator is the professional who prepares cost estimates. There are different types of estimators, whose title may be preceded by a modifier, such as building estimator, or electrical estimator, or chief estimator. Other professional titles may also prepare estimates or contribute to estimates, such as quantity surveyors, cost engineers, etc. In the US, there were 185,400 cost estimators in 2010. There are around 75,000 professional quantity surveyors working in the UK.