• Study Resource
  • Explore
    • Arts & Humanities
    • Business
    • Engineering & Technology
    • Foreign Language
    • History
    • Math
    • Science
    • Social Science

    Top subcategories

    • Advanced Math
    • Algebra
    • Basic Math
    • Calculus
    • Geometry
    • Linear Algebra
    • Pre-Algebra
    • Pre-Calculus
    • Statistics And Probability
    • Trigonometry
    • other →

    Top subcategories

    • Astronomy
    • Astrophysics
    • Biology
    • Chemistry
    • Earth Science
    • Environmental Science
    • Health Science
    • Physics
    • other →

    Top subcategories

    • Anthropology
    • Law
    • Political Science
    • Psychology
    • Sociology
    • other →

    Top subcategories

    • Accounting
    • Economics
    • Finance
    • Management
    • other →

    Top subcategories

    • Aerospace Engineering
    • Bioengineering
    • Chemical Engineering
    • Civil Engineering
    • Computer Science
    • Electrical Engineering
    • Industrial Engineering
    • Mechanical Engineering
    • Web Design
    • other →

    Top subcategories

    • Architecture
    • Communications
    • English
    • Gender Studies
    • Music
    • Performing Arts
    • Philosophy
    • Religious Studies
    • Writing
    • other →

    Top subcategories

    • Ancient History
    • European History
    • US History
    • World History
    • other →

    Top subcategories

    • Croatian
    • Czech
    • Finnish
    • Greek
    • Hindi
    • Japanese
    • Korean
    • Persian
    • Swedish
    • Turkish
    • other →
 
Profile Documents Logout
Upload
Direct Costs
Direct Costs

... This includes the direct costs of the product/service and the organisation’s overheads – but how do we deal with the overheads? In this section, you will look at three different costing methods, each of which has a specific purpose, and will serve to provide you with answers to this question. The kn ...
Information Technology Project Management * Third Edition
Information Technology Project Management * Third Edition

... PMBOK® Project Cost Management ...
Chapter 23 Alternate Problems - McGraw Hill Higher Education
Chapter 23 Alternate Problems - McGraw Hill Higher Education

... The cost accountant for Blue Pharmaceuticals has informed you that the company’s materials quantity variance for the drug Allegro was exactly equal to its materials price variance for the year. The company’s normal level of production is 50 batches of Allegro per year. However, due to uncertainties ...
Ch17
Ch17

... – Starting and ending times for each activity – Identification of the critical activities (i.e., the ones whose delay necessarily delay the project). – Identification of the non-critical activities, and the amount of slack time available when scheduling these activities. ...
Lecture 1 Title: MIS Concept and Definition
Lecture 1 Title: MIS Concept and Definition

... Activity sequencing: Identifying and documenting the relationships between project activities. Activity resource estimating: Estimating how many resources a project team should use to perform project activities. Activity duration estimating: Estimating the number of work periods that are needed to c ...
to "Earned Value Analysis
to "Earned Value Analysis

... time, $1.05 worth of work was actually done. A SPI greater than one and a positive SV indicates more work has been accomplished than was planned. Note how this is worded since a SPI > 1.0 does not necessarily mean you are ahead of schedule! You can accomplish more work than planned by working on non ...
ANSWERS TO QUESTIONS
ANSWERS TO QUESTIONS

... The specific identification method of inventory costing is subject to manipulation. Manipulation is possible because one can, at the time of each sale, select (pick and choose) from the shelf the item that has the highest or the lowest (or some other) unit cost with no particular rationale for the c ...
Pull planning
Pull planning

... Scheduling for Subcontractors is different from the type of scheduling done for Owners or General Contractors. It usually requires a higher level of detail. Its important that the Subcontractor’s schedule be incorporated into the GC’s master CPM/SIP etc. Having a system to track the GC schedule i ...
Project Sceduling
Project Sceduling

... What is time required for each activity? What other resources (such as labor, raw materials, and machinery) are required for each activity? ...
Chapter 7
Chapter 7

... – be proactive rather than reactive – use information from all available sources. For example: • previous lessons learned files and other historical information about the project and its context • all planning outputs to date including work breakdown structures, schedule and cost plans • the project ...
Diapositiva 1 - Research Programme on Biomedical Informatics
Diapositiva 1 - Research Programme on Biomedical Informatics

... and interactions. Those communications seldom take place based on graphical elements (3D, 2D, images…) that might require strict confidentiality due to their high industrial value. Consequently, the majority of interactions is performed in presence meetings, which is costly and time consuming. The i ...
Pengolahan Sinyal Multimedia
Pengolahan Sinyal Multimedia

... • The project team decides to contract work to a supplier, either because the supplier has skills in that area that the team does not have, or because the team does not have the manpower for the items the contractor will provide. • Usually this in itself reduces the risk, because having work done by ...
Managing AEC Projects to Success
Managing AEC Projects to Success

... facets, each of which is a microcosm of its counterpart in the general environment. The economic environment infringes upon the project in terms of the financial plans and targets. Although economics is a much wider issue than finance, this is the dominant effect. Similarly, in terms of the way in w ...
Set 6
Set 6

... aggregate method: brute force accounting method: assign costs to each operation so that it is easy to sum them up while still ensuring that result is accurate potential method: a more sophisticated version of the accounting method ...
2 Amortized Complexity
2 Amortized Complexity

... operates on a heap with at most n elements Inserting into a heap with n elements takes O(log n) time So total time spent doing the insertions is O(n log n) time But maybe this is an over-estimate! ...
Matrix Evidence - Barrow Cadbury Trust
Matrix Evidence - Barrow Cadbury Trust

... enable new PCs to understand the challenges of working with young adult offenders. It has been assumed that all new PCs would be mentored as part this scheme with either existing PCs or sergeants acting as mentors. This analysis provides evidence that is crucial to informing decisions and ensuring t ...
Full cost pricing and market structure
Full cost pricing and market structure

... Economic theory argues that the Þrm must use a pricing on the basis of marginal (or variable) cost, so that the Þxed costs are not taken into account. In words, the consumer has not to bear the Þxed cost which has to be deduced a posteriori from the overall proÞt. It is known that the Þrms are reluc ...
Project Risk and Cost Management
Project Risk and Cost Management

... 1. The base cost component – Base cost is defined as the likely cost of the planned project if no significant problems occur. 2. The risk (or uncertainty) component. – a list of uncertainties is created of both opportunities and threats, called a “risk register.” ...
Demystifying the Black Art
Demystifying the Black Art

... 4. The Year of Alexander the Great’s birth? 5. Total value of U. S. Currency in circulation in 2004? 6. Total Volume of the Great Lakes? 7. Worldwide box office receipts for the Movie Titanic? 8. Total length of the coastline of the Pacific Ocean? 9. Number of book titles published in the U. S. sinc ...
predetermined overhead rates
predetermined overhead rates

... overhead costs, it will not cause distorted costing if the products all consume overhead in the same proportion as unit-level driven overhead costs. • Product diversity simply means that products consume overhead activities in different proportions. • This can be caused by differences in product siz ...
Power Sector Managing EPC Power Project ABSTRACT
Power Sector Managing EPC Power Project ABSTRACT

... In this type of contracting methods, the project is broken in small packages and awarded to different vendors. The integration is being done by developer. In power sector , the no of packages close to 25 to 40. These packages may be only material supplies or may include Engineering and Supply type c ...
Costs of Software Quality - KSU Faculty Member websites
Costs of Software Quality - KSU Faculty Member websites

... The model further subdivides these classes into subclasses: ■ Costs of control : ■ Prevention costs include investments in quality infrastructure and quality activities that are not directed to a specific project or system, being general to the organization. ■ Appraisal costs include the costs of ac ...
3004-W15-T1-p3(XP and Scrum)
3004-W15-T1-p3(XP and Scrum)

... Early estimates of cost and value, tied to business processes Deliver subsets of functionality prioritized by business value Reassess and re-plan to fit resources, schedule, and discoveries ...
Optimizing the Success Rate of Competitive Construction Bidding
Optimizing the Success Rate of Competitive Construction Bidding

... but the accuracy of these tools is steadily increasing. If enough historical data is available, then these tools can be effective (Seydel, 2003, p. 291). Singh and Shoura (1996) present a different mathematical approach with the same objective. Their specific research was conducted on airport constr ...
9 Things in the PMBOK
9 Things in the PMBOK

... execution of the project • Ensures the project team and stakeholders have an accurate understanding of what has been completed in the project to-date and what will be delivered in total ...
< 1 2 3 4 5 6 7 8 ... 13 >

Cost estimate

A cost estimate is the approximation of the cost of a program, project, or operation. The cost estimate is the product of the cost estimating process. The cost estimate has a single total value and may have identifiable component values. A problem with a cost overrun can be avoided with a credible, reliable, and accurate cost estimate. An estimator is the professional who prepares cost estimates. There are different types of estimators, whose title may be preceded by a modifier, such as building estimator, or electrical estimator, or chief estimator. Other professional titles may also prepare estimates or contribute to estimates, such as quantity surveyors, cost engineers, etc. In the US, there were 185,400 cost estimators in 2010. There are around 75,000 professional quantity surveyors working in the UK.
  • studyres.com © 2025
  • DMCA
  • Privacy
  • Terms
  • Report