• Study Resource
  • Explore
    • Arts & Humanities
    • Business
    • Engineering & Technology
    • Foreign Language
    • History
    • Math
    • Science
    • Social Science

    Top subcategories

    • Advanced Math
    • Algebra
    • Basic Math
    • Calculus
    • Geometry
    • Linear Algebra
    • Pre-Algebra
    • Pre-Calculus
    • Statistics And Probability
    • Trigonometry
    • other →

    Top subcategories

    • Astronomy
    • Astrophysics
    • Biology
    • Chemistry
    • Earth Science
    • Environmental Science
    • Health Science
    • Physics
    • other →

    Top subcategories

    • Anthropology
    • Law
    • Political Science
    • Psychology
    • Sociology
    • other →

    Top subcategories

    • Accounting
    • Economics
    • Finance
    • Management
    • other →

    Top subcategories

    • Aerospace Engineering
    • Bioengineering
    • Chemical Engineering
    • Civil Engineering
    • Computer Science
    • Electrical Engineering
    • Industrial Engineering
    • Mechanical Engineering
    • Web Design
    • other →

    Top subcategories

    • Architecture
    • Communications
    • English
    • Gender Studies
    • Music
    • Performing Arts
    • Philosophy
    • Religious Studies
    • Writing
    • other →

    Top subcategories

    • Ancient History
    • European History
    • US History
    • World History
    • other →

    Top subcategories

    • Croatian
    • Czech
    • Finnish
    • Greek
    • Hindi
    • Japanese
    • Korean
    • Persian
    • Swedish
    • Turkish
    • other →
 
Profile Documents Logout
Upload
AC Direct Off-Line Power Supplies
AC Direct Off-Line Power Supplies

... indicates a high leakage current potential and shock hazard. Note: Any metallic part that reads overrange on the CURRENT/POWER LCD (blank display with a digit "1" on the left) is connected directly to one side of the AC line. ...
UF4004
UF4004

... or sustain life, or (c) whose failure to perform when properly used in accordance with instructions for use provided in the labeling, can be reasonably expected to result in significant injury to the user. ...
FB2202B Digital Output with Position Feedback
FB2202B Digital Output with Position Feedback

an enhanced voltage sag compensation scheme for dynamic
an enhanced voltage sag compensation scheme for dynamic

Transformers
Transformers

PDF Download(PDF Type, 13Kbyte)
PDF Download(PDF Type, 13Kbyte)

... The progress of system LSI performance has opened doors to increasing the functionality of cellular phones and is sustaining a rapidly expanding market. System-on-chip (SoC) performance is measured by factors such high-speed, as well as low-power consumption, which determines the battery life of cel ...
Crouzet SSR & IO Presentation
Crouzet SSR & IO Presentation

EE 1122628
EE 1122628

Low-Output-Impedance RF System for the ISIS Second
Low-Output-Impedance RF System for the ISIS Second

FB2201B Digital Output with Position Feedback
FB2201B Digital Output with Position Feedback

Energy and Power
Energy and Power

... current that each appliance takes is calculated and then added to the others. The total current should not exceed the safe load current of the circuit Lighting circuits are usually fused for a maximum current of 5 amps and power or heating circuits for 10 or 15 amps. ...
L550A_M5400EX (Page 1)
L550A_M5400EX (Page 1)

... 3 Reduces Cross-Contamination Between Components The M5400-EX is designed to provide noise isolation between 5 isolated outlet banks including 2 high current outlets so that any noise created by an A/V component cannot contaminate the power going to equipment plugged into the other outlet banks. ...
Low Voltage Sequential Circuit With a Ring Oscillator Clock
Low Voltage Sequential Circuit With a Ring Oscillator Clock

Energy and Power Energy
Energy and Power Energy

... current that each appliance takes is calculated and then added to the others. The total current should not exceed the safe load current of the circuit Lighting circuits are usually fused for a maximum current of 5 amps and power or heating circuits for 10 or 15 amps. ...
   Techforum Newsletter August 2011
   Techforum Newsletter August 2011

Electric Equipment Guarding and Workspaces
Electric Equipment Guarding and Workspaces

Datasheet - identWERK Bad Rappenau
Datasheet - identWERK Bad Rappenau

PSURGE 30.2 3OkV SURGE TEST SYSTEM ONE SOLUTION
PSURGE 30.2 3OkV SURGE TEST SYSTEM ONE SOLUTION

... n Emergency switch ...
BP5034D24
BP5034D24

Jun 1999 The LT1576: 200kHz, 1.5A Monolithic
Jun 1999 The LT1576: 200kHz, 1.5A Monolithic

... RFI radiation from the loop created by this path. These traces have a parasitic inductance of approximately 20nH/inch, which can cause an additional problem at higher operating voltages. At switch-off, the current flowing in the trace inductance causes a voltage spike. This is in addition to the inp ...
Auxiliary Power Generator Products BLCD-20B
Auxiliary Power Generator Products BLCD-20B

... emergency lighting fixtures and energizing them when normal utility power has been lost. The unit shall consist of relay switching circuitry, a test switch, a normal power indicator light and an alternate power indicator light contained in one 1.7”x 2.97”x 1.64” enclosure; shall sense normal power a ...
Project Helios
Project Helios

... • The multiplexer that was • An EN input on the device chosen for this project is used to enable or was the ADG409 by disable the device. When Analog Devices. disabled, all channels are switched off. • This part is a analog multiplexer with four differential channels. • The ADG409 switches one of fo ...
BP5047A24
BP5047A24

... "Products"). If you wish to use any such Product, please be sure to refer to the specifications, which can be obtained from ROHM upon request. Examples of application circuits, circuit constants and any other information contained herein illustrate the standard usage and operations of the Products. ...
Lecture2
Lecture2

Technical Series, Edition 1
Technical Series, Edition 1

< 1 ... 581 582 583 584 585 586 587 588 589 ... 717 >

Distribution management system

In the recent years, utilization of electrical energy increased exponentially and customer requirement and quality definitions of power were changed enormously. As the electric energy became an essential part of the daily life, its optimal usage and reliability became important. Real-time network view and dynamic decisions have become instrumental for optimizing resources and managing demands, thus making a distribution management system which could handle proper work flows, very critical.
  • studyres.com © 2025
  • DMCA
  • Privacy
  • Terms
  • Report