• Study Resource
  • Explore Categories
    • Arts & Humanities
    • Business
    • Engineering & Technology
    • Foreign Language
    • History
    • Math
    • Science
    • Social Science

    Top subcategories

    • Advanced Math
    • Algebra
    • Basic Math
    • Calculus
    • Geometry
    • Linear Algebra
    • Pre-Algebra
    • Pre-Calculus
    • Statistics And Probability
    • Trigonometry
    • other →

    Top subcategories

    • Astronomy
    • Astrophysics
    • Biology
    • Chemistry
    • Earth Science
    • Environmental Science
    • Health Science
    • Physics
    • other →

    Top subcategories

    • Anthropology
    • Law
    • Political Science
    • Psychology
    • Sociology
    • other →

    Top subcategories

    • Accounting
    • Economics
    • Finance
    • Management
    • other →

    Top subcategories

    • Aerospace Engineering
    • Bioengineering
    • Chemical Engineering
    • Civil Engineering
    • Computer Science
    • Electrical Engineering
    • Industrial Engineering
    • Mechanical Engineering
    • Web Design
    • other →

    Top subcategories

    • Architecture
    • Communications
    • English
    • Gender Studies
    • Music
    • Performing Arts
    • Philosophy
    • Religious Studies
    • Writing
    • other →

    Top subcategories

    • Ancient History
    • European History
    • US History
    • World History
    • other →

    Top subcategories

    • Croatian
    • Czech
    • Finnish
    • Greek
    • Hindi
    • Japanese
    • Korean
    • Persian
    • Swedish
    • Turkish
    • other →
 
Profile Documents Logout
Upload
Aalborg Universitet during Grid Fault
Aalborg Universitet during Grid Fault

... The second chapter elucidates recent thinking in the area of grid connection by discussing several grid codes or grid requirements. In the discussion it is tried to present the view of the transmission line operators as well as the challenges wind turbine manufacturers such as Vestas faced. Modellin ...
BAUR cable testing and diagnostics.
BAUR cable testing and diagnostics.

... through the overall measurement procedure and shows partial discharges clearly over the entire cable length. PD diagnostics can be carried out simultaneously with cable testing. ...
Interleaving Contributes Unique Benefits to Forward and Flyback
Interleaving Contributes Unique Benefits to Forward and Flyback

... Interleaving Contributes Unique Benefits to Forward and Flyback Converters Brian Shaffer ABSTRACT A 200-W interleaved forward converter design example illustrates how an interleaved topology can reduce the size and cost of power filtering components and also enhance dynamic load response. In this co ...
Current Control of VSI-PWM Inverters
Current Control of VSI-PWM Inverters

... Simulation results for the hysteresis controller with three dependent controls and the programmed application of the zero voltage vector indicate that the magnitude and phase error in the line currents are small. Also, the current errors remain within the hysteresis band. The average inverter switch ...
IMPLEMENTATION OF 4-BIT TWO STEP FLASH ADC
IMPLEMENTATION OF 4-BIT TWO STEP FLASH ADC

... implemented separately. The chosen technology as with the scale of operating voltages to low values down to 2 V, it ensures a high performance circuit. The considered mechanisms are best suitable for a whole Flash ADC. The table I crates a comparison between delay, conversion time and power dissipat ...
SKY77435 数据资料DataSheet下载
SKY77435 数据资料DataSheet下载

... Information in this document is provided in connection with Skyworks Solutions, Inc. (“Skyworks”) products or services. These materials, including the information contained herein, are provided by Skyworks as a service to its customers and may be used for informational purposes only by the customer. ...
neutral grounding resistors
neutral grounding resistors

... An ungrounded system is one in which there is no intentional connection between the conductors and earth ground. However, in any system, a capacitive coupling exists between the system conductors and the adjacent grounded surfaces. Consequently, the “ungrounded system” is, in reality, a “capacitivel ...
Firewire 800 Fiber Optic Extender
Firewire 800 Fiber Optic Extender

... hard disk drives and printers. Boasting incredible transfer rates of up to 800 Mbps the Firewire 800 Fiber Optic Extender is the perfect solution for a wide variety of applications, such as video editing and broadcasting, networking, and security systems. ...
1. WHAT IS METER
1. WHAT IS METER

SKY77732 数据资料DataSheet下载
SKY77732 数据资料DataSheet下载

Telemetry Manual
Telemetry Manual

... The power supply must be used with the on-board deck cable supplied with the system because the cable forms an interlock between the supply and the load. Using another type of cable will either not work, may damage equipment, and/or pose a safety hazard. The interlock system is designed to turn the ...
MAX8716/MAX8717/MAX8756/MAX8757 Interleaved High-Efficiency, Dual Power-Supply Controllers for Notebook Computers General Description
MAX8716/MAX8717/MAX8756/MAX8757 Interleaved High-Efficiency, Dual Power-Supply Controllers for Notebook Computers General Description

... step-down, interleaved, fixed-frequency, switch-mode power-supply (SMPS) controllers with synchronous rectification. The MAX8716/MAX8717/MAX8756/MAX8757 are intended for main (5V/3.3V) power generation, while the MAX8756 is optimized for I/O power rails in batterypowered systems. Fixed-frequency ope ...
PWM, Step-Down DC-to-DC Controller with Margining and Tracking ADP1822
PWM, Step-Down DC-to-DC Controller with Margining and Tracking ADP1822

... PWM, Step-Down DC-to-DC Controller with Margining and Tracking ADP1822 The ADP1822 regulated output can track another power supply and can be dynamically adjusted up or down with the controller’s margining-control inputs, making it ideal for high reliability applications. It is well suited for a wid ...
P83911
P83911

... NOTE: This equipment has been tested and found to comply with the limits for a Class B digital device, pursuant to Part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference in residential installation. This equipment generates, uses and can rad ...
UNIVERSITY OF CALIFORNIA, SAN DIEGO CMOS Power Amplifiers for Wireless Communications
UNIVERSITY OF CALIFORNIA, SAN DIEGO CMOS Power Amplifiers for Wireless Communications

... Comparison of the calculated and simulated IM3 of the load voltage at 2ω1 − ω2 versus peak-envelope output power. . . . . . . . . . . . . . . . . . . . . . . . . . 129 Contributions to the load-voltage IM3 from the g2 , g3 , and Ceff nonlinearities.130 Die microphotograph of the highly integrated an ...
AN77900 - PSoC® 3 and PSoC 5LP Low
AN77900 - PSoC® 3 and PSoC 5LP Low

Protection Fundamentals - Levine Lectronics and Lectric
Protection Fundamentals - Levine Lectronics and Lectric

... • Assemblies containing electrical switching, protection, metering and management devices • Used in three-phase, high-power industrial, commercial and utility applications • Covers a variety of actual uses, including motor control, distribution panels and outdoor switchyards • The term "switchgear" ...
SKY77735 数据资料DataSheet下载
SKY77735 数据资料DataSheet下载

LTC3788 - 2-Phase, Dual Output Synchronous
LTC3788 - 2-Phase, Dual Output Synchronous

... Note 2: The LTC3788 is tested under pulsed load conditions such that TJ ≈ TA. The LTC3788E is guaranteed to meet specifications from 0°C to 85°C junction temperature. Specifications over the –40°C to 125°C operating junction temperature range are assured by design, characterization and correlation w ...
Protective Relay Application Guide
Protective Relay Application Guide

... The selection of protective devices is based on: ...
The following article was offered on the
The following article was offered on the

... rectifier. The rotor and stator are windings made up of varnished copper wires; the varnish acts as an insulator. The rectifier is made up of six diodes, arranged in pairs. Each pair of diodes rectifies the current from each of the fixed phase windings in the stator. Most alternators do not have fix ...
thecnical and manteinance manual
thecnical and manteinance manual

TPS777/8xx: Fast-Transient-Response 750
TPS777/8xx: Fast-Transient-Response 750

... Input voltage range(2), VI . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . −0.3 V to 13.5 V Voltage range at EN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ...
INTERNATIONAL STANDARD IEC 60076-1
INTERNATIONAL STANDARD IEC 60076-1

... When IEC standards do not exist for such categories of transformers, this part of IEC 60076 may still be applicable either as a whole or in part. For those categories of power transformers and reactors which have their own IEC standards, this part is applicable only to the extent in which it is spec ...
Silent Runner Inverter/Charger Power System
Silent Runner Inverter/Charger Power System

... Mode’ whenever the inverter is ON and the AC load has been less than 5 watts for approximately 5 seconds. While in the ‘Load Demand Mode’ the inverter does not produce 120 volts AC but instead produces pulses of 120 volts AC which the inverter uses to look for a load at a one second rate. When an AC ...
< 1 ... 78 79 80 81 82 83 84 85 86 ... 1128 >

Power engineering



Power engineering, also called power systems engineering, is a subfield of energy engineering that deals with the generation, transmission, distribution and utilization of electric power and the electrical devices connected to such systems including generators, motors and transformers. Although much of the field is concerned with the problems of three-phase AC power – the standard for large-scale power transmission and distribution across the modern world – a significant fraction of the field is concerned with the conversion between AC and DC power and the development of specialized power systems such as those used in aircraft or for electric railway networks. It was a subfield of electrical engineering before the emergence of energy engineering.Electricity became a subject of scientific interest in the late 17th century with the work of William Gilbert. Over the next two centuries a number of important discoveries were made including the incandescent light bulb and the voltaic pile. Probably the greatest discovery with respect to power engineering came from Michael Faraday who in 1831 discovered that a change in magnetic flux induces an electromotive force in a loop of wire—a principle known as electromagnetic induction that helps explain how generators and transformers work.In 1881 two electricians built the world's first power station at Godalming in England. The station employed two waterwheels to produce an alternating current that was used to supply seven Siemens arc lamps at 250 volts and thirty-four incandescent lamps at 40 volts. However supply was intermittent and in 1882 Thomas Edison and his company, The Edison Electric Light Company, developed the first steam-powered electric power station on Pearl Street in New York City. The Pearl Street Station consisted of several generators and initially powered around 3,000 lamps for 59 customers. The power station used direct current and operated at a single voltage. Since the direct current power could not be easily transformed to the higher voltages necessary to minimise power loss during transmission, the possible distance between the generators and load was limited to around half-a-mile (800 m).That same year in London Lucien Gaulard and John Dixon Gibbs demonstrated the first transformer suitable for use in a real power system. The practical value of Gaulard and Gibbs' transformer was demonstrated in 1884 at Turin where the transformer was used to light up forty kilometres (25 miles) of railway from a single alternating current generator. Despite the success of the system, the pair made some fundamental mistakes. Perhaps the most serious was connecting the primaries of the transformers in series so that switching one lamp on or off would affect other lamps further down the line. Following the demonstration George Westinghouse, an American entrepreneur, imported a number of the transformers along with a Siemens generator and set his engineers to experimenting with them in the hopes of improving them for use in a commercial power system.One of Westinghouse's engineers, William Stanley, recognised the problem with connecting transformers in series as opposed to parallel and also realised that making the iron core of a transformer a fully enclosed loop would improve the voltage regulation of the secondary winding. Using this knowledge he built a much improved alternating current power system at Great Barrington, Massachusetts in 1886. In 1885 the Italian physicist and electrical engineer Galileo Ferraris demonstrated an induction motor and in 1887 and 1888 the Serbian-American engineer Nikola Tesla filed a range of patents related to power systems including one for a practical two-phase induction motor which Westinghouse licensed for his AC system.By 1890 the power industry had flourished and power companies had built thousands of power systems (both direct and alternating current) in the United States and Europe – these networks were effectively dedicated to providing electric lighting. During this time a fierce rivalry in the US known as the ""War of Currents"" emerged between Edison and Westinghouse over which form of transmission (direct or alternating current) was superior. In 1891, Westinghouse installed the first major power system that was designed to drive an electric motor and not just provide electric lighting. The installation powered a 100 horsepower (75 kW) synchronous motor at Telluride, Colorado with the motor being started by a Tesla induction motor. On the other side of the Atlantic, Oskar von Miller built a 20 kV 176 km three-phase transmission line from Lauffen am Neckar to Frankfurt am Main for the Electrical Engineering Exhibition in Frankfurt. In 1895, after a protracted decision-making process, the Adams No. 1 generating station at Niagara Falls began transmitting three-phase alternating current power to Buffalo at 11 kV. Following completion of the Niagara Falls project, new power systems increasingly chose alternating current as opposed to direct current for electrical transmission.Although the 1880s and 1890s were seminal decades in the field, developments in power engineering continued throughout the 20th and 21st century. In 1936 the first commercial high-voltage direct current (HVDC) line using mercury-arc valves was built between Schenectady and Mechanicville, New York. HVDC had previously been achieved by installing direct current generators in series (a system known as the Thury system) although this suffered from serious reliability issues. In 1957 Siemens demonstrated the first solid-state rectifier (solid-state rectifiers are now the standard for HVDC systems) however it was not until the early 1970s that this technology was used in commercial power systems. In 1959 Westinghouse demonstrated the first circuit breaker that used SF6 as the interrupting medium. SF6 is a far superior dielectric to air and, in recent times, its use has been extended to produce far more compact switching equipment (known as switchgear) and transformers. Many important developments also came from extending innovations in the ICT field to the power engineering field. For example, the development of computers meant load flow studies could be run more efficiently allowing for much better planning of power systems. Advances in information technology and telecommunication also allowed for much better remote control of the power system's switchgear and generators.