• Study Resource
  • Explore Categories
    • Arts & Humanities
    • Business
    • Engineering & Technology
    • Foreign Language
    • History
    • Math
    • Science
    • Social Science

    Top subcategories

    • Advanced Math
    • Algebra
    • Basic Math
    • Calculus
    • Geometry
    • Linear Algebra
    • Pre-Algebra
    • Pre-Calculus
    • Statistics And Probability
    • Trigonometry
    • other →

    Top subcategories

    • Astronomy
    • Astrophysics
    • Biology
    • Chemistry
    • Earth Science
    • Environmental Science
    • Health Science
    • Physics
    • other →

    Top subcategories

    • Anthropology
    • Law
    • Political Science
    • Psychology
    • Sociology
    • other →

    Top subcategories

    • Accounting
    • Economics
    • Finance
    • Management
    • other →

    Top subcategories

    • Aerospace Engineering
    • Bioengineering
    • Chemical Engineering
    • Civil Engineering
    • Computer Science
    • Electrical Engineering
    • Industrial Engineering
    • Mechanical Engineering
    • Web Design
    • other →

    Top subcategories

    • Architecture
    • Communications
    • English
    • Gender Studies
    • Music
    • Performing Arts
    • Philosophy
    • Religious Studies
    • Writing
    • other →

    Top subcategories

    • Ancient History
    • European History
    • US History
    • World History
    • other →

    Top subcategories

    • Croatian
    • Czech
    • Finnish
    • Greek
    • Hindi
    • Japanese
    • Korean
    • Persian
    • Swedish
    • Turkish
    • other →
 
Profile Documents Logout
Upload
International Electrical Engineering Journal (IEEJ) Vol. 7 (2016) No.3, pp. 2173-2181
International Electrical Engineering Journal (IEEJ) Vol. 7 (2016) No.3, pp. 2173-2181

... generator apparent power (0.4 pu considering the machine apparent power as a base power for the system). III. FUZZY LOGIC CONTROLLER DESIGN The fuzzy logic is dissimilar from the crispy logic in boolean theory which uses only two logic levels (0 or 1) in that it uses infinite logic levels (from 0 to ...
Is-limiter The world fastest limiting and switching device
Is-limiter The world fastest limiting and switching device

... able to carry a high rated current but having a low switching capacity, and a high rupturing capacity (HRC) fuse arranged in parallel. In order to achieve the desired short opening time, a small charge is used as the energy store for opening of the switch (main conductor). When the main conductor is ...
IOSR Journal of Electrical and Electronics Engineering (IOSR-JEEE)
IOSR Journal of Electrical and Electronics Engineering (IOSR-JEEE)

... reuse of their switching frequency. Consequently, the delivered trapezoidal voltage pulses reach considerably high values of dv/dt (often more than 10 kv/μs). Situated in a system consisting of the PWM inverter, feeding cable and induction motor (IM) is then strongly influenced by its leakage capaci ...
Overcoming Communications Challenges in Software for Monitoring and Controlling Power Systems
Overcoming Communications Challenges in Software for Monitoring and Controlling Power Systems

... trying to make sense of an evolving power shortage or some other slower contingency involves tracking data that evolves over periods measured in minutes. Still other forms of data change over hours or days. Our focus here is on the second case (minutes). Our group has also looked at problems on shor ...
(LDC) Form B
(LDC) Form B

... Assessment (“CIA”) or Detailed Technical Connection Assessment (“DTCA”) on behalf of a generation proponent connecting to the LDC’s Distribution System. This application is to be accompanied with the LDC’s generation connection application as completed by the generation proponent, which must provide ...
Post Glover Dynamic Braking Resistors
Post Glover Dynamic Braking Resistors

... All resistors are factory tested before shipment. This includes a hi-pot test at 2.5 kV for ten seconds on all designs, insuring compatibility for drives systems from 240 to 600V. ...
one hundred user manual
one hundred user manual

... interior with clean, perforated front bezel houses your components in style, while the four top USB ports with audio in/out and handy storage tray bring convenience and accessibility to the package. Finally, the bottom PSU mount and two included TwoCool™ fans keep your system cool and quiet. The One ...
Evaluation Board User Guide UG-186
Evaluation Board User Guide UG-186

... one of the GND pads on the evaluation board. Connect the positive terminal (+) of the main voltage source to the VIN and VIN3 pads of the evaluation board. Connect the positive terminal (+) of the bias voltage source to the VBIAS pad of the evaluation board. Set the bias voltage supply to a voltage ...
STGW20NC60VD
STGW20NC60VD

... Updated Figure 16: Emitter-collector diode characteristics and package mechanical data. Minor text changes to improve readability. ...
Local Distribution Company (LDC) Form B
Local Distribution Company (LDC) Form B

... Assessment (“CIA”) or Detailed Technical Connection Assessment (“DTCA”) on behalf of a generation proponent connecting to the LDC’s Distribution System. This application is to be accompanied with the LDC’s generation connection application as completed by the generation proponent, which must provide ...
TPA3122D2 数据资料 dataSheet 下载
TPA3122D2 数据资料 dataSheet 下载

... is a rise in the local supply voltage due to energy being driven back to the supply by operation of the class-D amplifier. This phenomenon is most evident at low audio frequencies and when both channels are operating at the same frequency and phase. At low levels, power-supply pumping results in dis ...
Distribution Transformers
Distribution Transformers

Electrical Signature Analysis Part 1
Electrical Signature Analysis Part 1

Electrical Surge-Protection Devices for Industrial
Electrical Surge-Protection Devices for Industrial

... they provide. Field experience has revealed serious safety issues related to the SPD operation, particularly during its end-of-life situation. Power surges can cause failure, permanent degradation, or temporary malfunction of electronic devices and systems. The development of an effective SPD is of ...
Local Distribution Company (LDC) Form B
Local Distribution Company (LDC) Form B

... Assessment (“CIA”) or Detailed Technical Connection Assessment (“DTCA”) on behalf of a generation proponent connecting to the LDC’s Distribution System. This application is to be accompanied with the LDC’s generation connection application as completed by the generation proponent, which must provide ...
Dielectric Properties at High Frequencies of Douglas Fir 20
Dielectric Properties at High Frequencies of Douglas Fir 20

... properties that are important in dielectric heating are the "dielectric constant" and "power factor" of the dielectric. It is necessary that both of these quantities be determined in order to perform calculations for a particular dielectric material. if a potential difference is impressed on two 2. ...
The Use of Low-Voltage Current-Limiting Fuses to Reduce Arc-Flash Energy Kenneth Borgwald
The Use of Low-Voltage Current-Limiting Fuses to Reduce Arc-Flash Energy Kenneth Borgwald

... incident energy from arcs produced by three-phase 600-V circuits with fuses in them. Within their current-limiting range, the fuses introduce additional impedance into the circuit and reduce the amount of energy that is produced by a three-phase arc. Persons who design, operate, and maintain electri ...
FAN23SV10M TinyBuck™ 10 A Integrated Synchronous Buck Regulator F A
FAN23SV10M TinyBuck™ 10 A Integrated Synchronous Buck Regulator F A

... connected from VIN to the EN pin. With VIN > 5.5V a series resistor is required to limit the current flow into the EN pin clamp to less than 24 µA to keep the internal clamp within normal operating range. The resistor value can be calculated from the following equation: ...
PDF
PDF

... integrated with a power supply rated 12 V @ 0.8 A. This power supply is just barely enough to support a speaker load. The unit was reported as having a short, but in fact, there was an operational problem. Basically, the power supply needs to stabilize before the amplifier starts switching. Otherwis ...
LED Driver with Integrated MOSFET General Description Features
LED Driver with Integrated MOSFET General Description Features

... for MR16 and Other 12V AC Input Lamps The IC has a control pin, REFI, to program the input current. The IC regulates the average voltage on FB to 200mV if REFI is left open. A control voltage on REFI can be used to control the input current. The average voltage on FB is regulated to VREFI/6, where V ...
IOSR Journal of VLSI and Signal Processing (IOSR-JVSP)
IOSR Journal of VLSI and Signal Processing (IOSR-JVSP)

... Here power gating technique is applied on 10T13A full adder by using high threshold voltage PMOS and NMOS transistors switches for providing VDD voltage supply and ground voltage supply respectively for low threshold voltage PMOS and NMOS transistors based full adder load circuit [11]. The transisto ...
Current-Mode Processor in the Era of Deeply Scaled CMOS
Current-Mode Processor in the Era of Deeply Scaled CMOS

Stray voltage
Stray voltage

SGA8543Z HIGH IP , MEDIUM POWER DISCRETE SiGe TRANSISTOR
SGA8543Z HIGH IP , MEDIUM POWER DISCRETE SiGe TRANSISTOR

... Exceeding any one or a combination of the Absolute Maximum Rating conditions may cause permanent damage to the device. Extended application of Absolute Maximum Rating conditions to the device may reduce device reliability. Specified typical performance or functional operation of the device under Abs ...
Protection, Control, and Automation System for a
Protection, Control, and Automation System for a

... capabilities within the 61850 standard could be named GOOSE. Both 61850 GOOSE and GSSE are useful, co-exist on Ethernet networks, and are collectively known as GSE (Generic Substation Events). For the purpose of this specific design, either could have been chosen. Some design selections predated the ...
< 1 ... 270 271 272 273 274 275 276 277 278 ... 1128 >

Power engineering



Power engineering, also called power systems engineering, is a subfield of energy engineering that deals with the generation, transmission, distribution and utilization of electric power and the electrical devices connected to such systems including generators, motors and transformers. Although much of the field is concerned with the problems of three-phase AC power – the standard for large-scale power transmission and distribution across the modern world – a significant fraction of the field is concerned with the conversion between AC and DC power and the development of specialized power systems such as those used in aircraft or for electric railway networks. It was a subfield of electrical engineering before the emergence of energy engineering.Electricity became a subject of scientific interest in the late 17th century with the work of William Gilbert. Over the next two centuries a number of important discoveries were made including the incandescent light bulb and the voltaic pile. Probably the greatest discovery with respect to power engineering came from Michael Faraday who in 1831 discovered that a change in magnetic flux induces an electromotive force in a loop of wire—a principle known as electromagnetic induction that helps explain how generators and transformers work.In 1881 two electricians built the world's first power station at Godalming in England. The station employed two waterwheels to produce an alternating current that was used to supply seven Siemens arc lamps at 250 volts and thirty-four incandescent lamps at 40 volts. However supply was intermittent and in 1882 Thomas Edison and his company, The Edison Electric Light Company, developed the first steam-powered electric power station on Pearl Street in New York City. The Pearl Street Station consisted of several generators and initially powered around 3,000 lamps for 59 customers. The power station used direct current and operated at a single voltage. Since the direct current power could not be easily transformed to the higher voltages necessary to minimise power loss during transmission, the possible distance between the generators and load was limited to around half-a-mile (800 m).That same year in London Lucien Gaulard and John Dixon Gibbs demonstrated the first transformer suitable for use in a real power system. The practical value of Gaulard and Gibbs' transformer was demonstrated in 1884 at Turin where the transformer was used to light up forty kilometres (25 miles) of railway from a single alternating current generator. Despite the success of the system, the pair made some fundamental mistakes. Perhaps the most serious was connecting the primaries of the transformers in series so that switching one lamp on or off would affect other lamps further down the line. Following the demonstration George Westinghouse, an American entrepreneur, imported a number of the transformers along with a Siemens generator and set his engineers to experimenting with them in the hopes of improving them for use in a commercial power system.One of Westinghouse's engineers, William Stanley, recognised the problem with connecting transformers in series as opposed to parallel and also realised that making the iron core of a transformer a fully enclosed loop would improve the voltage regulation of the secondary winding. Using this knowledge he built a much improved alternating current power system at Great Barrington, Massachusetts in 1886. In 1885 the Italian physicist and electrical engineer Galileo Ferraris demonstrated an induction motor and in 1887 and 1888 the Serbian-American engineer Nikola Tesla filed a range of patents related to power systems including one for a practical two-phase induction motor which Westinghouse licensed for his AC system.By 1890 the power industry had flourished and power companies had built thousands of power systems (both direct and alternating current) in the United States and Europe – these networks were effectively dedicated to providing electric lighting. During this time a fierce rivalry in the US known as the ""War of Currents"" emerged between Edison and Westinghouse over which form of transmission (direct or alternating current) was superior. In 1891, Westinghouse installed the first major power system that was designed to drive an electric motor and not just provide electric lighting. The installation powered a 100 horsepower (75 kW) synchronous motor at Telluride, Colorado with the motor being started by a Tesla induction motor. On the other side of the Atlantic, Oskar von Miller built a 20 kV 176 km three-phase transmission line from Lauffen am Neckar to Frankfurt am Main for the Electrical Engineering Exhibition in Frankfurt. In 1895, after a protracted decision-making process, the Adams No. 1 generating station at Niagara Falls began transmitting three-phase alternating current power to Buffalo at 11 kV. Following completion of the Niagara Falls project, new power systems increasingly chose alternating current as opposed to direct current for electrical transmission.Although the 1880s and 1890s were seminal decades in the field, developments in power engineering continued throughout the 20th and 21st century. In 1936 the first commercial high-voltage direct current (HVDC) line using mercury-arc valves was built between Schenectady and Mechanicville, New York. HVDC had previously been achieved by installing direct current generators in series (a system known as the Thury system) although this suffered from serious reliability issues. In 1957 Siemens demonstrated the first solid-state rectifier (solid-state rectifiers are now the standard for HVDC systems) however it was not until the early 1970s that this technology was used in commercial power systems. In 1959 Westinghouse demonstrated the first circuit breaker that used SF6 as the interrupting medium. SF6 is a far superior dielectric to air and, in recent times, its use has been extended to produce far more compact switching equipment (known as switchgear) and transformers. Many important developments also came from extending innovations in the ICT field to the power engineering field. For example, the development of computers meant load flow studies could be run more efficiently allowing for much better planning of power systems. Advances in information technology and telecommunication also allowed for much better remote control of the power system's switchgear and generators.
  • studyres.com © 2026
  • DMCA
  • Privacy
  • Terms
  • Report