• Study Resource
  • Explore Categories
    • Arts & Humanities
    • Business
    • Engineering & Technology
    • Foreign Language
    • History
    • Math
    • Science
    • Social Science

    Top subcategories

    • Advanced Math
    • Algebra
    • Basic Math
    • Calculus
    • Geometry
    • Linear Algebra
    • Pre-Algebra
    • Pre-Calculus
    • Statistics And Probability
    • Trigonometry
    • other →

    Top subcategories

    • Astronomy
    • Astrophysics
    • Biology
    • Chemistry
    • Earth Science
    • Environmental Science
    • Health Science
    • Physics
    • other →

    Top subcategories

    • Anthropology
    • Law
    • Political Science
    • Psychology
    • Sociology
    • other →

    Top subcategories

    • Accounting
    • Economics
    • Finance
    • Management
    • other →

    Top subcategories

    • Aerospace Engineering
    • Bioengineering
    • Chemical Engineering
    • Civil Engineering
    • Computer Science
    • Electrical Engineering
    • Industrial Engineering
    • Mechanical Engineering
    • Web Design
    • other →

    Top subcategories

    • Architecture
    • Communications
    • English
    • Gender Studies
    • Music
    • Performing Arts
    • Philosophy
    • Religious Studies
    • Writing
    • other →

    Top subcategories

    • Ancient History
    • European History
    • US History
    • World History
    • other →

    Top subcategories

    • Croatian
    • Czech
    • Finnish
    • Greek
    • Hindi
    • Japanese
    • Korean
    • Persian
    • Swedish
    • Turkish
    • other →
 
Profile Documents Logout
Upload
Instrument Transformer Basic Technical
Instrument Transformer Basic Technical

... voltages from one magnitude to another or to perform an isolating function, that is, to isolate the utilization current or voltage from the supply voltage for safety to both the operator and the end device in use. Instrument transformers are designed specifically for use with electrical equipment fa ...
PPT - Snowmass 2001
PPT - Snowmass 2001

... ”Well, let’s layout some gates and we are done…” ...
stray voltage problems in agriculture
stray voltage problems in agriculture

emergency power systems
emergency power systems

... The status report shall be sent to 6 user defined locations. These locations can be preprogrammed at factory, programmed on site by customer, or remotely programmed by factory once system is installed. The self/diagnostic facsimile shall allow for remote monitoring and troubleshooting of any abnorma ...
Performance of Line-start Permanent Magnet Synchronous Motor
Performance of Line-start Permanent Magnet Synchronous Motor

... attention of a large number of scholars and manufacturers, for its advantages of high efficiency, high power factor and wide economic operation range [1-3]. The LSPMSM, which inherits the structure characteristic of induction motor and synchronous motor, consists of permanent magnets and aluminum wi ...
Protection from the harmful effects of arcing faults
Protection from the harmful effects of arcing faults

... The ability to mount devices on circuit breaker doors helps to minimize equipment size for two-high configurations Ability to mount protective relays, meters and other controls on each of the three compartment doors allows for more compact switchgear designs ...
Design Considerations for an LLC Resonant Converter
Design Considerations for an LLC Resonant Converter

... Vin min = VO. PFC 2 − ...
atwinc1500 - Atmel Corporation
atwinc1500 - Atmel Corporation

Coaxial Transmitting Chokes
Coaxial Transmitting Chokes

SKY77182 数据资料DataSheet下载
SKY77182 数据资料DataSheet下载

BDTIC www.BDTIC.com/infineon B u c k   C o n v... P h a s e   N o d...
BDTIC www.BDTIC.com/infineon B u c k C o n v... P h a s e N o d...

... Unfortunately many times these considerations are not part of the design process and the undershoot issue will be found once the board is being tested. A typical countermeasure is the addition of an external gate resistor ...
Slip Ring Assembly Systems - Stemmann
Slip Ring Assembly Systems - Stemmann

... Slip Ring Assembly Systems ...
PDF
PDF

... volume, low main-tenance requirements, and low electromagnetic-interference problems [1]. These BLDC motors are not limited to household applications, but these are suitable for other applications such as medical equipment, transportation, HVAC, motion control, and many industrial tools [2]–[4]. A B ...
Ampere Interrupting Capacity Calculations Or……
Ampere Interrupting Capacity Calculations Or……

... percent R are used and converted to X and R values on a per unit basis. And instead of using a defined constant for conductors, the impedance for conductors within the electrical system are also broken down into X and R components of the impedance. The ratio of reactance to resistance, or X/R, deter ...
LTC3550-1
LTC3550-1

... Maximum Rating condition for extended periods may affect device reliability and lifetime. Note 2: Guaranteed by long term current density limitations. Note 3: The LTC3550E-1 is guaranteed to meet the performance specifications from 0°C to 70°C. Specifications over the –40°C to 85°C operating temperatu ...
FAN102 Primary-Side-Control PWM Controller FA N
FAN102 Primary-Side-Control PWM Controller FA N

... output voltage and diode forward voltage drop is reflected to the auxiliary winding side as (VO+VF)× NA/NS. Since the diode forward voltage drop decreases as current decreases, the auxiliary winding voltage reflects the output voltage best at the end of diode conduction time where the diode current ...
Principles of Electrostatic Chucks
Principles of Electrostatic Chucks

... operation, chuck end-of-life detection, and in some chucks for grip confirmation detection, voltage and current monitoring is required. Power supplies for rf chucks must float with rf bias. Such floating power can be rf-decoupled with filters as in the DR4/BD3 system, or isolated, as in the DR5VI an ...
A new ZVT PWM DC-DC converter
A new ZVT PWM DC-DC converter

... with hard switching, and the parasitic capacitors of the switches discharge through the switches [3], [5]. In addition, most active snubber cells are seriously criticized due to their complexity and thus high cost and difficult control, a large amount of circulating energy and so excessive voltage a ...
UM1452
UM1452

... In operation, the STM32100B-MCKIT starter kit has noninsulated wires, moving or rotating parts (when connected to a motor), as well as hot surfaces. In case of improper use, incorrect installation or misuse, there is danger of serious personal injury and damage to property. All operations, installat ...
FPF2193 / FPF2194 / FPF2195 — Full Function Load Switch wit
FPF2193 / FPF2194 / FPF2195 — Full Function Load Switch wit

... The FPF2193, FPF2194, and FPF2195 form a series of load switches that provides full protection to systems and loads that may encounter large current conditions. These devices contain a 55 mΩ current-limited Pchannel MOSFET that can operate over an input voltage range of 1.8 to 5.5 V. Internally, cur ...
The Glass Industry - Electric Melter Design
The Glass Industry - Electric Melter Design

LC5901S DATA SHEET Rev.1.5
LC5901S DATA SHEET Rev.1.5

... The control of this IC is adopting "PRC method". The "PRC method" of this product, under the condition of fixed "OFF-Period" by external setup resistor RRT , and by controlling "ON-Period", the LED current will be controlled constant current value. It is possible that a system is constructed at a lo ...
FREQUENTLY ASKED QUESTIONS – PERMANENT MAGNET AC
FREQUENTLY ASKED QUESTIONS – PERMANENT MAGNET AC

Generator Power Control
Generator Power Control

Low Power Very High Frequency Switch-Mode Power
Low Power Very High Frequency Switch-Mode Power

... far into the MHz range, magnetic core losses increases rappidly and becomes unacceptably high for most core materials [2]. At this point air core and PCB embedded inductors becomes a viable solutions, as the inductances needed at these frequencies can be made in a small physical size and the core lo ...
< 1 ... 247 248 249 250 251 252 253 254 255 ... 1128 >

Power engineering



Power engineering, also called power systems engineering, is a subfield of energy engineering that deals with the generation, transmission, distribution and utilization of electric power and the electrical devices connected to such systems including generators, motors and transformers. Although much of the field is concerned with the problems of three-phase AC power – the standard for large-scale power transmission and distribution across the modern world – a significant fraction of the field is concerned with the conversion between AC and DC power and the development of specialized power systems such as those used in aircraft or for electric railway networks. It was a subfield of electrical engineering before the emergence of energy engineering.Electricity became a subject of scientific interest in the late 17th century with the work of William Gilbert. Over the next two centuries a number of important discoveries were made including the incandescent light bulb and the voltaic pile. Probably the greatest discovery with respect to power engineering came from Michael Faraday who in 1831 discovered that a change in magnetic flux induces an electromotive force in a loop of wire—a principle known as electromagnetic induction that helps explain how generators and transformers work.In 1881 two electricians built the world's first power station at Godalming in England. The station employed two waterwheels to produce an alternating current that was used to supply seven Siemens arc lamps at 250 volts and thirty-four incandescent lamps at 40 volts. However supply was intermittent and in 1882 Thomas Edison and his company, The Edison Electric Light Company, developed the first steam-powered electric power station on Pearl Street in New York City. The Pearl Street Station consisted of several generators and initially powered around 3,000 lamps for 59 customers. The power station used direct current and operated at a single voltage. Since the direct current power could not be easily transformed to the higher voltages necessary to minimise power loss during transmission, the possible distance between the generators and load was limited to around half-a-mile (800 m).That same year in London Lucien Gaulard and John Dixon Gibbs demonstrated the first transformer suitable for use in a real power system. The practical value of Gaulard and Gibbs' transformer was demonstrated in 1884 at Turin where the transformer was used to light up forty kilometres (25 miles) of railway from a single alternating current generator. Despite the success of the system, the pair made some fundamental mistakes. Perhaps the most serious was connecting the primaries of the transformers in series so that switching one lamp on or off would affect other lamps further down the line. Following the demonstration George Westinghouse, an American entrepreneur, imported a number of the transformers along with a Siemens generator and set his engineers to experimenting with them in the hopes of improving them for use in a commercial power system.One of Westinghouse's engineers, William Stanley, recognised the problem with connecting transformers in series as opposed to parallel and also realised that making the iron core of a transformer a fully enclosed loop would improve the voltage regulation of the secondary winding. Using this knowledge he built a much improved alternating current power system at Great Barrington, Massachusetts in 1886. In 1885 the Italian physicist and electrical engineer Galileo Ferraris demonstrated an induction motor and in 1887 and 1888 the Serbian-American engineer Nikola Tesla filed a range of patents related to power systems including one for a practical two-phase induction motor which Westinghouse licensed for his AC system.By 1890 the power industry had flourished and power companies had built thousands of power systems (both direct and alternating current) in the United States and Europe – these networks were effectively dedicated to providing electric lighting. During this time a fierce rivalry in the US known as the ""War of Currents"" emerged between Edison and Westinghouse over which form of transmission (direct or alternating current) was superior. In 1891, Westinghouse installed the first major power system that was designed to drive an electric motor and not just provide electric lighting. The installation powered a 100 horsepower (75 kW) synchronous motor at Telluride, Colorado with the motor being started by a Tesla induction motor. On the other side of the Atlantic, Oskar von Miller built a 20 kV 176 km three-phase transmission line from Lauffen am Neckar to Frankfurt am Main for the Electrical Engineering Exhibition in Frankfurt. In 1895, after a protracted decision-making process, the Adams No. 1 generating station at Niagara Falls began transmitting three-phase alternating current power to Buffalo at 11 kV. Following completion of the Niagara Falls project, new power systems increasingly chose alternating current as opposed to direct current for electrical transmission.Although the 1880s and 1890s were seminal decades in the field, developments in power engineering continued throughout the 20th and 21st century. In 1936 the first commercial high-voltage direct current (HVDC) line using mercury-arc valves was built between Schenectady and Mechanicville, New York. HVDC had previously been achieved by installing direct current generators in series (a system known as the Thury system) although this suffered from serious reliability issues. In 1957 Siemens demonstrated the first solid-state rectifier (solid-state rectifiers are now the standard for HVDC systems) however it was not until the early 1970s that this technology was used in commercial power systems. In 1959 Westinghouse demonstrated the first circuit breaker that used SF6 as the interrupting medium. SF6 is a far superior dielectric to air and, in recent times, its use has been extended to produce far more compact switching equipment (known as switchgear) and transformers. Many important developments also came from extending innovations in the ICT field to the power engineering field. For example, the development of computers meant load flow studies could be run more efficiently allowing for much better planning of power systems. Advances in information technology and telecommunication also allowed for much better remote control of the power system's switchgear and generators.
  • studyres.com © 2026
  • DMCA
  • Privacy
  • Terms
  • Report