Download COUNTY OF FAIRFAX, VIRGINIA DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES

Survey
yes no Was this document useful for you?
   Thank you for your participation!

* Your assessment is very important for improving the work of artificial intelligence, which forms the content of this project

Transcript
COUNTY OF FAIRFAX, VIRGINIA
DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES
LAND DEVELOPMENT SERVICES
2016 COMPREHENSIVE UNIT PRICE SCHEDULE
EFFECTIVE FEBRUARY 1, 2016
ENGLISH UNIT
PRICE
CATEGORY
UNIT
SIDEWALKS AND TRAILS
Sidewalk
4" Concrete, No Reinforcement and no Base
Concrete 4" - no reinforcement and no base
Bituminous concrete -2" with 4" base
Bituminous concrete -2" with 4" base
Concrete 4" - no reinforcement and no base
Concrete 4" with WWF and no base
Handrail 3 Rail 1-1/4" Finish
Handrail 3 rail 1-1/4" finish
Underdrains, Sidewalk (UD-3)
Underdrains, Sidewalk (UD-3)
Concrete yard steps with railings
4' wide, 3 steps
4' wide, 5 steps
Pedestrian bridge, prefabricated
Bridge abutments
4' wide
8' wide
Fair weather crossing
Steel frame with wood deck (PA-1)
4' wide
8' wide
Trails - INCLUDES excavation and grading
Bituminous concrete - Type I, TX-2
Up to 10' wide
Concrete trail with gravel base
Type IV, 4' - 6' Wide
Earth trail, Type VI, 6' Wide
Seal coat with 4" soil cement base
Type III, TX-2, 6' Wide
Stone dust with blue stone chip base
Type II, TX-2, 6' wide
Wood chip, 4' wide
Woodchip trail with gravel base
Type VII, 6'- 8' Wide
Page 41 of 44
$
48.47
SY
$
35.11
SY
$
52.66
SY
$
112.84
LF
$
19.11
LF
$
$
1,504.55
2,194.13
EA
EA
$
$
$
3,134.46
5,642.03
1,765.33
EA
EA
LF
$
$
752.27
1,128.40
LF
LF
$
57.67
SY
$
$
67.70
15.05
SY
SY
$
18.81
SY
$
$
15.67
20.56
SY
SY
$
18.81
SY
Similar