* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Download Test Procedure for the NCP2823BGEVB Evaluation Board
Survey
Document related concepts
Electrification wikipedia , lookup
Opto-isolator wikipedia , lookup
Pulse-width modulation wikipedia , lookup
Electrical substation wikipedia , lookup
History of electric power transmission wikipedia , lookup
Power engineering wikipedia , lookup
Three-phase electric power wikipedia , lookup
Power over Ethernet wikipedia , lookup
Immunity-aware programming wikipedia , lookup
Portable appliance testing wikipedia , lookup
Power electronics wikipedia , lookup
Voltage optimisation wikipedia , lookup
Alternating current wikipedia , lookup
Buck converter wikipedia , lookup
Power supply wikipedia , lookup
Transcript
Test Procedure for the NCP2823BGEVB Evaluation Board A power supply set to 3.6 V and current limit set to at least 1.5 A must be connected to J15 connector to powering the NCP2823EVB/D. Also to compensate for parasitic inductance of wires between the power supply and the evaluation board it is highly recommended to connect a 470 µF electrolytic capacitor to bypass J11 terminal. Like this the device can be evaluate under powering condition very similar that battery power supplies. These tests are provided in order to guarantee a good assembly of the NCP2823 on its dedicated board, it do not consist in parametric test which is already done at chip level. 1. SHUTDOWN TEST Jumper setup for shutdown test: Symbol Switch Descriptions J1 Must be connected to ground (low side) (off position) All other switches must be kept floating. Tests: 1. 2. Set the switches in the configuration Power the board with a 3.6V power supply limited at 1.5A and bypassed by a 470µF electrolytic capacitor. Measure the current on the power supply (must be inferior to 1µA) 3. 2. Wake up test Switches setup for wire mode test: Symbol J1 Switch Descriptions Must be connected to VDD (high side) All other switches must be kept floating. Tests: 4. 5. Set the switches in the configuration. Power the board with a 3.6V power supply limited at 1.5A and bypassed by a 470µF electrolytic capacitor. Measure DC Output voltage on J12 on J13 and GND. DC Voltage must be equal to 1.8V Measure DC input voltage on J5-2 on J6-2 and GND. DC Voltage must be equal to 1.26V 6. 7. SUMMARY: Test Shutdown test Wake up test 3/26/2011 Measurement I Supply VOUTP, VOUTN VJ9,J10 Results of successful test I<1µA VDC=1.8V VDC=1.26V www.BDTIC.com/ON/ -1- www.onsemi.com