Download Test Procedure for the NCP2823BGEVB Evaluation Board

Survey
yes no Was this document useful for you?
   Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Document related concepts

Electrification wikipedia , lookup

Opto-isolator wikipedia , lookup

Pulse-width modulation wikipedia , lookup

Electrical substation wikipedia , lookup

History of electric power transmission wikipedia , lookup

Power engineering wikipedia , lookup

Three-phase electric power wikipedia , lookup

Power over Ethernet wikipedia , lookup

Immunity-aware programming wikipedia , lookup

Rectifier wikipedia , lookup

Portable appliance testing wikipedia , lookup

Power electronics wikipedia , lookup

Voltage optimisation wikipedia , lookup

Alternating current wikipedia , lookup

Buck converter wikipedia , lookup

Power supply wikipedia , lookup

AC adapter wikipedia , lookup

Switched-mode power supply wikipedia , lookup

Mains electricity wikipedia , lookup

Transcript
Test Procedure for the NCP2823BGEVB Evaluation Board
A power supply set to 3.6 V and current limit set to at least 1.5 A must be connected to J15 connector
to powering the NCP2823EVB/D. Also to compensate for parasitic inductance of wires between the power
supply and the evaluation board it is highly recommended to connect a 470 µF electrolytic capacitor to bypass
J11 terminal. Like this the device can be evaluate under powering condition very similar that battery power
supplies.
These tests are provided in order to guarantee a good assembly of the NCP2823 on its dedicated
board, it do not consist in parametric test which is already done at chip level.
1. SHUTDOWN TEST
Jumper setup for shutdown test:
Symbol
Switch Descriptions
J1
Must be connected to ground (low side) (off position)
All other switches must be kept floating.
Tests:
1.
2.
Set the switches in the configuration
Power the board with a 3.6V power supply limited at 1.5A and bypassed by a 470µF
electrolytic capacitor.
Measure the current on the power supply (must be inferior to 1µA)
3.
2. Wake up test
Switches setup for wire mode test:
Symbol
J1
Switch Descriptions
Must be connected to VDD (high side)
All other switches must be kept floating.
Tests:
4.
5.
Set the switches in the configuration.
Power the board with a 3.6V power supply limited at 1.5A and bypassed by a 470µF
electrolytic capacitor.
Measure DC Output voltage on J12 on J13 and GND. DC Voltage must be equal to 1.8V
Measure DC input voltage on J5-2 on J6-2 and GND. DC Voltage must be equal to 1.26V
6.
7.
SUMMARY:
Test
Shutdown test
Wake up test
3/26/2011
Measurement
I Supply
VOUTP, VOUTN
VJ9,J10
Results of successful test
I<1µA
VDC=1.8V
VDC=1.26V
www.BDTIC.com/ON/
-1-
www.onsemi.com