* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Download Homework 1 - the GMU ECE Department
Stepper motor wikipedia , lookup
Three-phase electric power wikipedia , lookup
Electrical substation wikipedia , lookup
Electrical ballast wikipedia , lookup
Power inverter wikipedia , lookup
Variable-frequency drive wikipedia , lookup
History of electric power transmission wikipedia , lookup
Immunity-aware programming wikipedia , lookup
Integrating ADC wikipedia , lookup
Power MOSFET wikipedia , lookup
Current source wikipedia , lookup
Resistive opto-isolator wikipedia , lookup
Schmitt trigger wikipedia , lookup
Power electronics wikipedia , lookup
Surge protector wikipedia , lookup
Stray voltage wikipedia , lookup
Voltage regulator wikipedia , lookup
Voltage optimisation wikipedia , lookup
Switched-mode power supply wikipedia , lookup
Alternating current wikipedia , lookup
Portable appliance testing wikipedia , lookup
Mains electricity wikipedia , lookup
Buck converter wikipedia , lookup
Chapter 1 Homework Problems Reading Assignment: Chapters 1 and 2 of course text Due Date: 2/8/10 1. Compare hardware testing (final) to software testing. 2. For a given product, the test specification for a given input device is a maximum leakage of 3.0mA when 2.5V. This is tested by forcing a given voltage and measuring the resultant current. The tester to be used has the following accuracy: forcing voltage +/-(0.1% +4mV+0.6mV/10mA), measured current: +/-(0.2%+4uA+1uA/V) . What forcing voltage and current limit should be set to ensure no bad product passes? Where should it be set to ensure that no good product fails? 3. Repeat question 2, but assume that the 3.0mA spec is a minimum spec 4. In the pin electronics schematic in the class slides, the output comparator circuitry contains two comparators, one for Voh (output high), and the other for Vol. During functional testing, why are two comparators necessary (instead of just one)?