Download PUB‐NLH‐360  Island Interconnected System Supply Issues and Power Outages  Page 1 of 1 Asset Management

Survey
yes no Was this document useful for you?
   Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Document related concepts

Power over Ethernet wikipedia , lookup

Mains electricity wikipedia , lookup

Loading coil wikipedia , lookup

Transformer wikipedia , lookup

Power engineering wikipedia , lookup

Transmission line loudspeaker wikipedia , lookup

Alternating current wikipedia , lookup

Transformer types wikipedia , lookup

Telecommunications engineering wikipedia , lookup

Electric power transmission wikipedia , lookup

Amtrak's 25 Hz traction power system wikipedia , lookup

Electrical substation wikipedia , lookup

History of electric power transmission wikipedia , lookup

Transcript
PUB‐NLH‐360 Island Interconnected System Supply Issues and Power Outages Page 1 of 1 1 Q. Asset Management 2 Does Hydro have any underground/submarine transmission lines? If yes, state how 3 many and where they are located and who maintains and replaces them. 4 5 6 A. Hydro's response to DD‐NLH‐068 provides a listing of all Hydro’s 7 underground/submarine cables at the distribution voltage levels. At present, Hydro 8 does not own any underground or submarine cable as part of its main transmission 9 system on the Island portion of the province. However, Hydro does utilize a 10 number of short, underground sections of 66 kV class cable at its Holyrood Thermal 11 Generating Station to connect the 66 kV winding of 230/66 kV transformer T10 and 12 the 66 kV windings of 66/41.6 kV station service transformers SST‐12 and SST‐34 to 13 the 66 kV buses B6 and B7. These 66 kV cables are maintained by Transmission and 14 Rural Operations personnel. 
Related documents
P2‐PUB‐NLH‐7  NLH 2012 Capital Budget Application  Page 1 of 1 Re: 2012 Capital Plan 
P2‐PUB‐NLH‐7  NLH 2012 Capital Budget Application  Page 1 of 1 Re: 2012 Capital Plan 
V-NLH-048 2013 NLH General Rate Application Page 1 of 2 Q.
V-NLH-048 2013 NLH General Rate Application Page 1 of 2 Q.
IN‐NLH‐013  2013 NLH General Rate Application  Page 1 of 2 Re: NLH Evidence, Section 2, p. 2.5, lines 4‐13 
IN‐NLH‐013  2013 NLH General Rate Application  Page 1 of 2 Re: NLH Evidence, Section 2, p. 2.5, lines 4‐13 
CA‐NLH‐012  Holyrood Blackstart Diesel Units Application  Page 1 of 1 Q. 
CA‐NLH‐012  Holyrood Blackstart Diesel Units Application  Page 1 of 1 Q. 
V‐NLH‐048 (Revision 1, Nov 18‐14)  2013 NLH General Rate Application  Page 1 of 2 Reference: Section 4: Rates and Regulation, Section 4.6 Rate Stabilization Plan, 
V‐NLH‐048 (Revision 1, Nov 18‐14)  2013 NLH General Rate Application  Page 1 of 2 Reference: Section 4: Rates and Regulation, Section 4.6 Rate Stabilization Plan, 
CA-NLH-002 NLH 2016 Capital Budget Application Page 1 of 1
CA-NLH-002 NLH 2016 Capital Budget Application Page 1 of 1
LMFM Interview Notes
LMFM Interview Notes
LWHN‐NLH‐047  2013 NLH General Rate Application  Page 1 of 2 Q.
LWHN‐NLH‐047  2013 NLH General Rate Application  Page 1 of 2 Q.
How Do You Know It`s Spring?
How Do You Know It`s Spring?
PUB‐NLH‐187  Island Interconnected System Supply Issues and Power Outages  Page 1 of 1 Q. 
PUB‐NLH‐187  Island Interconnected System Supply Issues and Power Outages  Page 1 of 1 Q. 
PR‐PUB‐NLH‐053  NLH 2015 Prudence Review  Page 1 of 3 Q. 
PR‐PUB‐NLH‐053  NLH 2015 Prudence Review  Page 1 of 3 Q. 
Standards: GA: SPS1. Students will investigate our current
Standards: GA: SPS1. Students will investigate our current
Pre-Authorized form En
Pre-Authorized form En
IR‐LWHN‐NLH‐008  NLH 2013 Interim Rates Application  Page 1 of 1 Q. 
IR‐LWHN‐NLH‐008  NLH 2013 Interim Rates Application  Page 1 of 1 Q. 
HSE PowerPoint template
HSE PowerPoint template
CA‐NLH‐299  2013 NLH General Rate Application  Page 1 of 1 Cost of Service 
CA‐NLH‐299  2013 NLH General Rate Application  Page 1 of 1 Cost of Service 
Electrical hazards associated with underground cables
Electrical hazards associated with underground cables
(130310119038) Parmar Vijay D.(130310119039)
(130310119038) Parmar Vijay D.(130310119039)
SESSION 16: Adaptation Planning II - International
SESSION 16: Adaptation Planning II - International
PUB‐NLH‐188  Island Interconnected System Supply Issues and Power Outages  Page 1 of 3 Q. 
PUB‐NLH‐188  Island Interconnected System Supply Issues and Power Outages  Page 1 of 3 Q. 
CA‐NLH‐006  Island Interconnected System Supply Issues and Power Outages  Page 1 of 3 Q. 
CA‐NLH‐006  Island Interconnected System Supply Issues and Power Outages  Page 1 of 3 Q. 
Underground Economies: Human Trafficking an Application
Underground Economies: Human Trafficking an Application