* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Download VPN Establishment for Dhagahbour , Qorahay, and Godey city
Survey
Document related concepts
Global serializability wikipedia , lookup
Commitment ordering wikipedia , lookup
Entity–attribute–value model wikipedia , lookup
Microsoft Access wikipedia , lookup
Extensible Storage Engine wikipedia , lookup
Serializability wikipedia , lookup
Microsoft SQL Server wikipedia , lookup
Oracle Database wikipedia , lookup
Open Database Connectivity wikipedia , lookup
Ingres (database) wikipedia , lookup
Functional Database Model wikipedia , lookup
Relational model wikipedia , lookup
Microsoft Jet Database Engine wikipedia , lookup
Concurrency control wikipedia , lookup
Database model wikipedia , lookup
Transcript
Ethiopian Somali Regional State Disaster prevention and preparedness Bureau (DPPB) TOR FOR Disaster Risk Reduction Information System October, 2014, Jigjiga, Ethiopia TERMS OF REFERENCE: TOR for database Development DPPB 2o14 Page 2 1. OVERVIEW OF THE CONSULTANCY: Disaster Prevention and Preparedness Bureau (DPPB) is a government body established to maintain and coordinate disasters such as drought and floods that recurring occurs in Somali Regional State, and also DPPB is responsible for the general management and overall coordination of the early warning disaster risk monitoring and response to disasters at Regional Level. The purpose of the database is to streamline the flow of inversion being submitted by worades early warning focal persons and data captured by the Regional level, and integrate it into a web based application that can record, store, categorize and produce reports on demand based on user requirements. Thereby allowing for tracking all Reponses, interventions done by DPPB such food deliveries and Nonfood deliveries items. 2. OBJECTIVE OF THE CONSULTANCY: The objective of this Consultancy is To develop a baseline electronic database that will be used to record and track all the responses and innervations by DPPB, To develop an applications for use by DPPB bureau to monitor and track easily the conditions and disaster risk reduction measures that are required for through the approval process. TOR for database Development DPPB Page 3 3. SCOPE OF THE CONSULTANCY: This Consultancy should cover a System Analysis, System Design, developing the Database and implementation of the system. The scope of the project is to study the existing system to find out which area should be improved, changed from a manual system to be presented on computer screen and also develop the system that can respond to the user’s requirements and can satisfy the bureau. Specific goals of the consultancy are the following: • To define the database structure and the level of detail • To create an open database allowing for upgrades and adaptations in the future • To design a database enabling to produce well defined reports based on user’s Requirement that includes, food and non food delivery reports. • Develop a web based application for responses and intervention done by DPPB • Conduct system study, develop applications and implement a proper database system for effective Early Warning and Response system; • Organize Early Warning and Response system which still manual system , convert it into a database system that can be easily accessed and retrieved by related information using and make available to use 4. PERIOD Developing and implementing the database, should not take more than forty five (45) working days. Before the installation the consultancy should test the software and check whether it works properly or not, fix and any error. In addition to that the consultancy should also give test period of one month and maintenance. TOR for database Development DPPB Page 4 DEVELOPMENT OF A DISASTER RISK REDUCTION DATABASE # of Mandays 1 2 System Analysis and design 3 Installing and configuring the database 20 5 4 Final Database and Manual Training 15 5 First prototype for Database Development, Total Days 45 days • NOTE: • Timelines for submission of deliverables above will be agreed to and detailed in the final inception report. • Note: All other expenses are to be included in the financial proposal such as communications, travel and • DSA costs for Consultant(s)/Firm (if applicable). 5. SYSTEM REQUIREMENT: Minimum requirements/specifications of the system 1.1.Functional Capabilities 1.1.1. Windows Server, XP,Win7 and Vista compatible 1.1.2. Centralized database Application capabilities 1.1.3. Web based Application 1.1.4. Front end can be Asp/Php Mysql backend mysql/sql Server 1.1.5. Functional on low-end personal computers 6. OTHER REQUIREMENTS Performance Levels Data Structures/Elements Safety Reliability Security/Privacy TOR for database Development DPPB Page 5 7. DELIVERABLES: Deliverables for this consultancy includes: The Consultant/Firm will submit the following: Database and accompanying Standard Operating Procedures Manual an detailedApplication user Manual Install/upload the application Conduct two days training for the system users 8. SUBMISSION OF THE PROPOSAL Financial proposal should have a detailed budget, The Consultant may be an individual or firm/company preferably located within the Somali Region of Ethiopia and should be able to assume duties by November 15, 2014. The duration of the Consultancy is scheduled to last maximum of (45) days. A technical and financial proposal based on the Terms of Reference outlined above must be provided no later than on November 10, 2014.The proposal must include the company profile. TOR for database Development DPPB Page 6