Download Substation batteries and chargers physical checks and tests

Survey
yes no Was this document useful for you?
   Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Document related concepts

Voltage optimisation wikipedia , lookup

Opto-isolator wikipedia , lookup

Electrical substation wikipedia , lookup

Stray voltage wikipedia , lookup

Portable appliance testing wikipedia , lookup

Electric battery wikipedia , lookup

Mains electricity wikipedia , lookup

Rechargeable battery wikipedia , lookup

Electrical wiring in the United Kingdom wikipedia , lookup

Transcript
Pre-commissioning Checklist
Primary Systems - Substations
Substation batteries and chargers physical checks and tests
Substation
Equipment no.
Manufacturer
Voltage
Rating(s)
Serial no.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Performed by
Service no.
Date
Click here to enter text.
Click here to enter text.
Click here to enter a date.
1. Visual inspection
Action/check
Acceptable criteria
Results
Check battery charger frame is earthed
Correctly earthed
Click here to enter text.
Check all charger alarms and trip settings
Correct
Click here to enter text.
Check battery cells are not leaking
No leaks
Click here to enter text.
Check battery terminals and connections
for signs of rust or corrosion
No signs of rust or corrosion
Click here to enter text.
All connections are correct and tightly
terminated.
Serviceable
Click here to enter text.
Initials
2. Functional checks
Action/check
Acceptable criteria
Results
Float and boost voltages
Check within manufacturer’s
recommended settings and
record
Click here to enter text.
Ripple content in DC output
According to SDI 535
schedules31
Click here to enter text.
Functionality of all control devices and
associated electrical circuits
Serviceable
Click here to enter text.
Functionality of all protection devices and
associated electrical circuits
Serviceable
Click here to enter text.
Record results
Click here to enter text.
Batteries tests and checking.
Measure:
 Cell temperature
 Individual cell impedance
 Float voltage of each cell
Check:
All connections, including inter-cell
connectors are torqued to specifications
FAE 3407 June 2015
SDI 535
Page 1 of 2
Initials
2. Discharge tests:
Action/check
Acceptable criteria
Initials
Results
Perform discharge test on batteries.
 Disconnect batteries from the battery
charger
 Record ambient temperature
 Perform discharge test and record
discharge current and time against the
cell voltage
Discharge time according to
battery capability and
manufacturer’s
recommendations
Click here to enter text.
3. Insulation resistance tests (wiring):
Action/check
Perform insulation resistance test on all
control wiring
Acceptable criteria
Tested using 1kV DC test
voltage.
Between AC to E > 5.0 MΩ
between DC to E > 5.0 MΩ
between AC to DC > 10 MΩ
on DC bus (if any) > 0.1 MΩ
on Pilots (if any) > 0.25 M
Initials
Results
Click here to enter text.
4. Power frequency with stands voltage tests (wiring):
Action/check
Acceptable criteria
Initials
Results
Perform insulation resistance test on all
control wiring:
Perform power-frequency withstand voltage of
2kV for 1 min, given as follows:

All new wiring installed at site.

All wiring not tested for PFWV in factory.

All wiring disconnected and removed for
transport.
Note: If wiring has to be taken off or if electronic
devices are in circuits, these circuits shall not be
tested).
Conducted/tested/
inspected by
FAE 3407 June 2015
Service no.
No disruptive discharge
Witnessed
by
SDI 535
Service no.
Click here to enter text.
Reviewed/
reported by
Page 2 of 2
Service no.