Download LCLS Vacuum System PLC and IOC Test Plan

Survey
yes no Was this document useful for you?
   Thank you for your participation!

* Your assessment is very important for improving the work of artificial intelligence, which forms the content of this project

Transcript
7 a – Gauge Controller Configuration
See attached document
7 b – Pump Controller Configuration
See attached document
9 a – Valve Interlock Checkout
For each interlocked valve:
1. Valve interlock logic test:
a. Make up all valve logic inputs, either by connecting to gauges reading low
pressure, or by connecting dummy loads at below-threshold pressures, or
using PLC forces
b. Reset interlock summary and verify that valve can be opened
c. Verify that interlock summary is made up in EDM and on front panel of
summary box
d. Fault one input and verify that interlock chain breaks in EDM and on front
panel. Verify that valve can not be opened
e. Bypass faulted input and verify that interlock chain completes and that
valve can be opened
f. Remove bypass and verify that valve cannot be opened
g. Repeat steps a, b, c, d, e, and f for each input
h. Remove all dummy loads or PLC logic forces and restore devices to initial
states.
Document related concepts

Buck converter wikipedia, lookup

Switched-mode power supply wikipedia, lookup

Opto-isolator wikipedia, lookup

Mercury-arc valve wikipedia, lookup

Immunity-aware programming wikipedia, lookup

Solar micro-inverter wikipedia, lookup

Control system wikipedia, lookup

Control theory wikipedia, lookup

PID controller wikipedia, lookup

Similar
CONCUR IMS implementation
CONCUR IMS implementation
File - LSL Math Weebly
File - LSL Math Weebly