Survey
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Renewable Energy Protocol Application SECTION A: PROJECT LOCATION Street Name: Street Number: Town: Primary contact: Postal Code: PROJECT SITE AND OWNER INFORMATION Full Legal Company Name: Street Number: Street Name Town: Postal Code: Agent Name: AGENT CONTACT INFORMATION Company Name: Street Number: Street Name: Town: Postal Code: Phone: E-mail: SECTON B: PROJECT DETAILS Is the Project a Rooftop Solar Project? Yes No If yes, proceed to Section C. If No, proceed to Section D. Size of Project (kW): SECTION C: ROOF TOP SOLAR PROJECTS Roof area to be covered: Number of panels: Height of panels from rooftop: Angle of panels: Page 1 of 4 Renewable Energy Protocol Application Will the panels be screened from the street: Yes Are the panels non-reflective? Yes No No Will any trees be removed? Yes No Will the panels interfere with Yes the intended rooftop storage of stormwater? No Has this project previously received support from the Township of North Stormont? Yes No Additional comments or relevant information about the project: SECTION D: OTHER RENEWABLE ENERGY PROJECTS Ground-Mounted Solar On-shore Wind Water Power Indicate Type of renewable energy project: Biogas Biomass Landfill gas Indicated the size of the project in kW: Indicate existing use of the site: Have surrounding property owners been notified of the proposed project? Yes No Page 2 of 4 Renewable Energy Protocol Application If yes, how? Will off-site fuel sources be transported to the site? Yes No If yes, provide details? Will the proposed renewable energy project produce waste by-products? Yes No If waste products are anticipated, what is the planned method of disposal? Describe planned measures to screen the site and/or mitigate any potential impacts on adjacent lands: NOTE: Additional studies including noise, health, traffic, etc. may be required prior to review of the proposed project. Proponents will be notified if additional documentation or copies of studies are required. SECTION E: CHECKLIST Site photos or renderings ` Plans and drawings ` Letter of acknowledgment from property owner Description of proposed screening Details on the use of anti-reflective coating (for solar projects) Details on proposed tree removal Details on whether the project will interfere with rooftop storage of stormwater (for rooftop solar projects) Previous submission materials if the project has already been considered by Council Page 3 of 4 Renewable Energy Protocol Application SECTION F: SIGNATURES In signing this application form, I confirm the accuracy, truthfulness and completeness of the information submitted in support of this application. Name of applicant: ______________________________________________________________ Signature of applicant: ___________________________________________________________ Date: _________________________________________________________________________ Page 4 of 4