Procedure No. DEE EHU-24-2-1 Authorised By: Manager EHU Title: Safe Work Method Statement Issue Date: September 2010 Review Date: September 2012 Is a Permit to Work Required? Personal Protective Equipment (PPE) Requirements: (please indicate by ticking or blacking-out box) None Confined Space Hot Work Work at Height (please list) Page Number: 1 of 1 Tools, Equipment or Instruction Required (consider such things as gas detection, ventilation fans, lighting, scaffolding, etc) Hazardous Materials Potential Environmental Hazards Fire/Emergency Equipment Requirements (List any hazardous materials to be used) (please indicate by ticking box) (consider fire extinguishers, rescue gear, etc) Spills to ground Noise pollution Soil erosion Spills to water Hazard to flora or fauna STEP/TASK No. Air pollution (dust, fumes) Job Step/Task Potential Hazard Current Control Describe the steps required to perform the task in the sequence they are carried out Against each step list the potential hazards that could cause injury/damage when the task step is performed. List the control measure required to eliminate or minimise the risk of injury arising from the identified hazard Action Plan (additional Controls) 4. SWMS Signoff Authorised By: Signature: THIS DOCUMENT IS UNCONTROLLED WHEN PRINTED Date: Responsibility