* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Download workshop 2016
Three-phase electric power wikipedia , lookup
Power inverter wikipedia , lookup
Audio power wikipedia , lookup
Opto-isolator wikipedia , lookup
History of electric power transmission wikipedia , lookup
Stray voltage wikipedia , lookup
Power engineering wikipedia , lookup
Pulse-width modulation wikipedia , lookup
Vacuum tube wikipedia , lookup
Power electronics wikipedia , lookup
Cavity magnetron wikipedia , lookup
Buck converter wikipedia , lookup
Distribution management system wikipedia , lookup
Tube socket wikipedia , lookup
Voltage optimisation wikipedia , lookup
Switched-mode power supply wikipedia , lookup
Commercial high-power X-band experience: klystron/modulators, and waveguide vacuum flanges CLIC Workshop January 2016 G. McMonagle (on behalf of Xbox team) • • • • Klystrons Modulators Klystron Drivers Flanges KLYSTRON SLAC Collaboration XL4 to XL5 2008-2010 KLYSTRON XL4 USA frequency 11.4 GHz only high power X band tube in operation No commercial option Long experience at SLAC in building and using these tubes Collaboration between CERN and SLAC to build 12 GHz design (XL5) PSI and Trieste joined collaboration 5 tubes ordered “Best efforts” collaboration, no guarantees 1st tube installed at CERN in 2010 KLYSTRON Parameters Specifications units RF Frequency 11.9942 GHz Peak RF power 50 MW RF pulse length 1.5 µs Pulse repetition rate 50 (100) Hz Klystron voltage 410-470 kV Micro perveance 1.15E-6 Good collaboration But some problems needed extra payments due to best efforts NO GUARANTEE KLYSTRON Call for Tender for commercial solution Limited replies Contract to CPI 2010-2014 SLAC Collaboration XL4 to XL5 2008-2010 KLYSTRON CPI VKX-8311A Same specification as XL5 Ordered 2 new tubes plus option of buying a 3rd 1st tube successfully tested at SLAC Delivered to CERN and installed in XBox1 Tube has been performing fine since installation 2nd tube also successfully tested at SLAC Delivered to CERN and installed in Xbox 2 During SAT tests problems arose with tube performance KLYSTRON First diode tests (no RF) of CPI#2 tube showed that 0.7 GHz gun oscillations starts at about 240 kV and even generate RF power from the input cavity: Fortunately, going higher in voltage, the instability zone moves towards the rise/fall time, so the plat top can be used now. No margin to reduce Klystron operation voltage Run at nominal even when low power required to avoid oscillations on RF KLYSTRON Why were oscillations not visible in SLAC tests ? Consultation between CERN and CPI concluded it must be due to geometry in the high voltage tank, CERN took reservation on warranty of tube performance. CPI manufactured pieces for 3 different solutions to try and resolve the problem 1. Special plates with ferrites to be mounted on walls of modulator tank :Improvement but did not get rid of all oscillations but could run at a lower voltage with good flat top 2. Plates to change geometry (reduce volume and mimic shape) to match Xbox1 modulator :- No improvement 3. Solution 2 with ferrites :- Slightly better than 2 but 1 was best. Lost 3 weeks of operations with these manipulations, CPI wanted to investigate more but we decided option 1 is sufficient to allow us to run KLYSTRON Are there any oscillations on 1st tube? Yes but at within a small voltage at around 200kV and on falling edge Above and below these voltages tube is fine. 3rd tube has been ordered and will be tested in a new Scandinova modulator in CPI factory (not at SLAC) FAT next week First indications from CPI are that there are no oscillations like 2nd tube but may have similar issue to 1st, will find out more next week ! KLYSTRON Call for Tender for commercial solution Limited replies Contract to CPI 2010-2014 2013-2015 Xbox 3 Combination of lower peak power klystron with high average power, turnkey contract awarded to Toshiba for 4 klystron modulators SLAC Collaboration XL4 to XL5 2008-2010 KLYSTRON Toshiba E37113 Peak power: 6 MW Beam Voltage: 150 kV Beam current: 90 A Average power: 12.4 kW Efficiency: 47.5% RF pulse width 5µs Rep rate 400Hz KLYSTRON All 4 tubes have been successfully installed in the modulators at CERN in October 2015 All have pulsed to nominal parameters in diode mode First tube has also been operating with RF Waiting for delivery of RF waveguide components, LLRF and klystron drivers RF commissioning hopefully starting March 2016 MODULATORS Xbox 1 2010 MODULATORS Xbox 1 modulator CEA Saclay collaboration financed modulator Area chosen for modulator installation had limited footprint Therefore size of modulator was critical and CEA also decided to go for solid state technology Contract awarded to Scandinova ScandiNova solid-state modulator (Ser. #1) for powering the XL5 klystron - Designed for 400kV, 300A, 3.25us HV pulse width FWHM, 1.5us RF pulse width at 50Hz repetition rate - Max. 450kV, 350A, 3.5us, 50Hz - Specified 0.25% HV ripple and 0.1% HV repeatability - Compact design (3x2m2) including HV oil tank and klystron - Primary voltage 1400V max. - Integrated control and interlock system - Integrated vacuum and solenoid power supplies for klystron MODULATORS Factory test done into dummy load (no klystron available) Normally modulator delivered to client in fully assembled unit (as in factory) but due to space restrictions had to be disassembled the remounted at CERN SAT tests with dummy load no klystron available Did not achieve nominal parameters until 2015 with CPI klystron installed (arcing in SLAC klystron gun) MODULATORS Issues with 1st modulator Calibration measurements. In factory no problem into resistive load (so we thought) In SAT, modulator was commissioned with dummy load again as klystron was not delivered yet. When klystron arrived was difficult to correlate measurements from SLAC to measurements at CERN, indications were that the perveance of tube was not correct. Eventually found that SLAC measurements were erroneous by 10% (confirmed by Trieste during their acceptance of tube #3) MODULATORS MODULATOR AND RF SYSTEM, OVERVIEW External Water Cooling System Need a CT on high side For future modulators Water Cooling Distribution L L 1 L 2 GN 3 D L 230VAC N 1 50Hz GN D Initially only SN built HT measurement Later commercial calibrated solution Tri I g installed puls Local RS232Ue pul Remote se RS232 P o w e r D i s tr i b u ti o n U n it S W #1 3phase 480VA C HVPS #1 - N 3x18 5A Solenoid >10 L/min Modulator >45 L/min 400VAC 50Hz Water Flow Interlocks Collector >120 L/min Body >10 L/min 12GH z Pulse Transform er Oil Tank S W #2 Current Interlock RFAmplifie r RF 3GHz RFSource Core Bias DCPS C T 1-phase 120VAC Control System Unit K2 Solid State Modulator Vacuum Interlock CVD S W #3 S W #n Ion Pump PS 5X Solenoid PS #1-3 Filament DCPS 030A Waveguide pressure Int., Arc Int, VSWR Int. Safety Interface Current measurements on low side of pulse transformer secondary Not ideal due to stray capacitance giving overshoot on measurement Difficult especially when starting up in short pulse to say where real peak is situated MODULATORS GUI interface was not very user friendly No real time and date stamp on interlock occurrences Some switch failure and reliability problems May have been due to many tube arcs in the XL5 tube Flat top on voltage difficult to achieve many iterations on changing tuning elements on each switch Flat top only really perfect at nominal voltage Had some issues with switch units when at nominal voltage Beware if you have to increase charging voltage to keep performance Some switch units may not be triggering and overloading the others (no indication of non triggering switches) When in operation the modulator performance is very good MODULATORS Xbox 1 Xbox 2 2012 2010 MODULATORS Xbox 2 modulator competitive tender from CERN Scandinova awarded contract Measurement requests implemented into new unit (Calibrated CVD, CT on high side), but not real time and date stamp for intelocks New design of switch unit (unfortunately not backward compatible with 1st unit) Different spares needed. 3 charging power supplies integrated (2 in first) Unfortunately we decided to commission this modulator with the XL5 as there was pressure to put CPI tube #1 in Xbox1. Resulted in getting modulator to work correctly but not at full pulse width due to tube limitations. Waited for CPI #2 to arrive before full commissioning and tuning of pulse shape Apart from a few teething problems and of course tube oscillations system running very well MODULATORS Xbox in building 150 More space, overhead crane available Manipulation and operation a lot easier than Xbox1 MODULATORS Xbox 1 2010 Xbox 2 2012 Xbox 3 2014 MODULATORS Lessons learnt from previous two projects Price enquiry to klystron manufacturers for turnkey solution Klystron contract awarded to Toshiba who subcontracted modulators to Scandinova Tube and modulators arrived at CERN after full SAT test with klystron Very quick and successful integration at CERN MODULATORS Modified K1 ScandiNova modulator The illustration of new 2 cabinet concept that will be adopted for 6 MW Toshiba klystrons. Doubled width oil tank. To facilitate installation of the Toshiba klystron which has rather wide ( 0.7 m) solenoid. Additional cabinet (comes for free). It can be used for Klystron RF driver amplifier, Solenoid PS, Ion Pump PS etc. New Control System that will simplify integration of external parts and offer a lot of new features. Flexible design (klystrons positioning) to Modulator parameters (max.) minimize the length of RF waveguide circuit: Peak RF power: 8.0 MW Pulsed voltage: 175 kV Pulse current: 115 A Average power: 50 kW Pulse length (flat): 5sec Rep. rate: 400 HZ 1.6 m 1.3m for 6 MW Toshiba klystron MODULATORS Xbox 3 in building 150 Please sign up for visits later in the workshop MODULATORS New improved performance in modulators due to new control system and GUI FPGA programming of switch triggers and charging power supplies allows easier tuning of flat top by delaying triggers Also allows flat top to be tuned at lower voltages of operation not just at nominal New GUI an excellent improvement Real time and date stamp for interlocks and events Interlock levels and settings a lot more user friendly MODULATORS Final words on modulator performance, measurements made on new S band K2 at SN Same performance on Xbox modulators K2-SYSTEM PULSE FLATNESS <0.4% DC-LEVEL STABILITY K2-SYSTEM USING PRECISION MULTIMETER <0.002% K2-SYSTEM PULSE-PULSE STABILITY <0.04% USING OSCILLOSCOPE Klystron Drivers For Xbox 1 and 2 Using TWT 3kW pulsed driver to provide power to Xbox 1 and 2 ~ 700w needed but allows tube to placed considerable distance away from klystron Non member state Expensive Protected technology , end user statements needed Designed for high duty factor (high pulse rep) Using at 50 Hz peak power drops off after few thousand hours operation Recycling at high prf necessary to recondition tube Recently seeing glitches in pulses causing problems in pulse compression Finite lifetime of tubes, whole unit needs to be sent back for change (long and expensive) Klystron Drivers Xbox 3 Development of solid state driver with a member state company Prototype built achieved 310W output power (initial goal >400W) Tested on Xbox3 A RMS phase and amplitude stability is very good with 0.17 degrees and 0.14% respectively Peak power limited due insertion loss by coaxial combination and isolator inside unit. 4 new units ordered with waveguide combination and output >1.1dB extra gain expected to achieve >400W output (delivery February 2016) If successful two units can be combine to power klystrons in Xbox 1 and 2 Still cheaper than USA TWT FLANGES Xbox 1 and Xbox 2 Using SLAC type male/female type flange Expensive to manufacture flanges and gaskets Attention to detail on integration of “directional” components needed when choosing flanges. Experience in Xbox 1 shows copper plating on flanges is necessary to reduce RF losses and RF heating FLANGES New sexless flange manufactured for Xbox3 (design agreed between laboratories that use x band technology) FLANGE GASKET Initial testing of flange at SLAC Initial problem with copper plating, now resolved with new technique at CERN (for more info see Serge Lebet) When mounting it was found difficult to align flanges and keep the flange gasket in place. New mounting jig developed prototype ready this week Summary • New technology, fast learning curve for CERN – • • And manufacturers Good collaboration between laboratories and commercial suppliers allowing fast development in the field Other competitors coming on market especially in solid state modulators e.g. Ampegon (SwissFEL) and Jema (University of Valencia) 2010 2016 Thank you for your attention Xbox operations at CERN XFEL’S? Medical apps? University test stands? Xbox3 technology in industry?