Download - SlideBoom

Survey
yes no Was this document useful for you?
   Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Document related concepts

Construction management wikipedia , lookup

PRINCE2 wikipedia , lookup

Transcript
INF 338 study Focus
Dreams/inf338study.com
FOR MORE CLASSES VISIT
www.inf338study.com
INF 338 Entire Course
•
•
•
•
•
•
•
•
•
•
•
•
INF 338 Week 1 Discussion 1 Teamplayer
INF 338 Week 1 Discussion 2 Team Development
INF 338 Week 1 Quiz
INF 338 Week 1 Assignment Virtual Teams
INF 338 Week 2 Assignment Leadership Styles
INF 338 Week 2 Quiz
INF 338 Week 2 Discussion 1 Project vs. Operation
INF 338 Week 2 Discussion 2 Leadership Activities
INF 338 Week 3 Assignment Project Design
INF 338 Week 3 Discussion 1 Stakeholder Management
INF 338 Week 3 Discussion 2 Critical Success Factors
INF 338 Week 3 Quiz
INF 338 Week 1 Assignment Virtual Teams
• Virtual Teams. In a two- to three-page paper (not including the title and
reference pages):
• Discuss how virtual teams have changed project management.
• Identify the tools needed to effectively manage a virtual team.
• Explain the advantages and disadvantages of using virtual teams.
• Identify the skills you possess that would enhance a virtual team project.
Your paper should be formatted according to APA style as outlined in the
approved APA style guide, and should cite at least two scholarly sources in
addition to the textbook.
•
INF 338 Week 1 Discussion 1 Teamplayer
• Teamplayer. After reviewing the readings for this week and the article
“Building Virtual Teams: Strategies for High Performance,” answer the
following in 200 words:
• What are some of the characteristics of effective teams?
• As a manager, how can you help promote these characteristics in your
team?
• Respond to at least two of your classmates’ posts.
•
INF 338 Week 1 Discussion 2 Team
Development
• Team Development. Review the “Stages of Team Development” website
athttp://www.businessballs.com/tuckmanformingstormingnormingperfor
ming.htm and use the model to examine a team in which you are/were a
member. How well does the model explain your experiences as a
developing team? How could you use this model to better “manage” a
team in which you were charged as the leader”? What are the implications
for project management when a project needs to begin quickly and
perform at a high level in a short period of time? Respond to at least two
other students in a substantive way.
INF 338 Week 1 Quiz
• 1. Another team decision making method is called the average of
members’ opinions. In this example the team decision is based on the
average of individual team members’ opinions.
• 2. The expert member method can be used as a method of team decision
making. The most expert member is allowed to decide for the team. The
difficulty with this method often lies in deciding who has the most
expertise, especially when those with power or status in the team
overestimate their expertise.
• 3. Harold K. Sperlich, Former President, Chrysler Corporation said
“Everyone has to work together; if we can’t get everybody working toward
common goals, nothing is going to happen.
• 4. Which of these is not a characteristic of a traditional classroom learning
group?
INF 338 Week 2 Assignment Leadership
Styles
• Leadership Styles. In a two- to three-page paper (not including the title and
reference pages):
• Discuss the different styles of leadership you have experienced while
working in project management or on projects.
• Identify and describe a leadership style that you find most effective.
• Explain how the use of this leadership style enhanced the project and your
experience as a team member.
Your paper should be formatted according to APA style as outlined in the
approved APA style guide, and should cite at least two scholarly sources in
addition to the textbook.
•
INF 338 Week 2 Discussion 1 Project vs.
Operation
• Project vs. Operation. How does a project differ from everyday, routine
operations? What are some of the key characteristics of a project?
Assuming differences exist, what are the implications for the project
manager? Respond to at least two other students in a substantive way.
INF 338 Week 2 Discussion 2 Leadership
Activities
• Leadership Activities. Read the article “Leadership Model for
Professionals.” After reading article, list the top two leadership activities
that you feel are most important in obtaining the maximum performance
from your team and explain why these two activities are the most
important ones. Respond to at least two other students in a substantive
way.
INF 338 Week 2 Quiz
• 1. Project management is a relatively new profession and is growing at a
remarkable rate. Fortune magazine called project management “Career
Number 1” for the 1990s.
• 2. WBS stands for:
• 3. Cost, time, and performance is all that is needed for a project.
• 4. Heuristics are essential for successful project management, because
every project is unique and requires its own approach. Ravindran, Phillips,
and Solberg (1987) present these modeling heuristics except :
• 5. A project is a combination of human and nonhuman resources pulled
together in a temporary organization to achieve a specific purpose.
• 6. CPM stands for Control Project Money.
INF 338 Week 3 Assignment Project Design
• Project Design. Using the information that you gained from the readings
thus far, write a three- to four-page paper (not including the title and
reference pages) that describes a project that you might undertake (this
can be a fictitious one or one that you have actually worked on). Describe
the major steps and the milestones of your project along with a timeline
for each step. Be sure to explain how to address team conflicts and how to
help ensure team cohesion and collaboration. You are required to use at
least two scholarly sources in addition to the text in the construction of
your paper.
INF 338 Week 3 Discussion 1 Stakeholder
Management
• Stakeholder Management. After reading the article “Crafting the Art of
Stakeholder Management“, explain the key points of stakeholder
involvement, and explain how you would apply this new knowledge in your
work. Respond to at least two other students in a substantive way
INF 338 Week 3 Discussion 2 Critical
Success Factors
• Critical Success Factors. Study the “Critical Success Factors and Their
Importance for System Implementation” figure on page 81 of the text.
Consider how you managed a project (personal or professional) in the past
and the relationship of the “Critical Success Factors” to the outcome of
that project. What factor or factors contributed most to your success?
Which factor or factors limited the success of the project? Respond to at
least two other students in a substantive way
INF 338 Week 3 Quiz
• 1. Activities for which the earliest and latest times turn out to be equal are
called critical.
• 2. Then what does Forward Pass- EF stand for when running through the
network from beginning to end?
• 3. Which of these is not a change that is stated as happening in the
workplace today?
• 4. What does the term free float refer to when referring to an activity?
• 5. The following are key features of this age of Project Management
according to Pinto and Kharbanda (1995)…
• 6. The amount by which termination of a noncritical activity can be
delayed before it causes one of its successors to be delayed is called
the free float of that activity.
INF 338 Week 4 Assignment Meeting Plan
• Meeting Plan. Review the “Meeting” section in your text Teamwork and
Project Management (p. 103-105). In a two- to three-page paper (not
including the title and reference pages), describe the topic of your final
project including the types of team members needed to complete the
project (i.e., project leader, administrative support, content experts, etc.),
and create a meeting plan for the initial team meeting.
• Your paper should be formatted according to APA style as outlined in the
approved APA style guide, and should cite at least one scholarly source in
addition to the textbook.
•
INF 338 Week 4 Discussion 1 Long Projects
• Long Projects. What are some things that you can do to improve the
functioning of teams during the course of a long project? List some ideas
here and show how they facilitate team cohesion and
• team development. Would these enhancements be different for virtual
teams? Respond to at least two other students in a substantive way
•
INF 338 Week 4 Discussion 2 Peer
Assessments
• Peer Assessments. After reading “Peer Assessment” on page 111 of the
text, explain how peer assessments can strengthen a team. How can it
improve team relations and reduce team conflicts? When would peer
assessments not be appropriate? Respond to at least two other students in
a substantive way.
INF 338 Week 4 Quiz
• 1. The current quality movement started with work by W Edward Deming
in the 1940s and progressed through a series of initiatives, the first being
continuous quality improvement (CQI).
• 2. If a delay is caused by resources that have not arrived, you must explain
this thoroughly and wait.
• 3. Self-assessment has not been proven to be a very effective way of
improving projects.
• 4. There is also an After part of the During portion of a meeting process,
such as the one outlined in The Team Handbook(Scholtes, Joiner, and
Streibel, 1996). Which of these is not included in the After portion of the
process?
INF 338 Week 5 Discussion 1 Project
Communications
• Project Communications. What are your recommendations for
communications during a project? What are some of the key issues that
you are likely to encounter and how will you address them? Respond to at
least two other students in a substantive way.
INF 338 Week 5 Final Paper (2 Papers)
• This Tutorial contains 2 Different Papers
•
• This paper will demonstrate leadership, and team collaboration were
applied to the success (or failure) of the project.
• The purpose of this assignment is to apply the central concepts of the
course to a project management experience. To do this, define the project
particulars for illustrative purposes, explain how the project team was
selected, explain how team problems were resolved, discuss how you
utilized PM software to manage team activities, and analyze how the
project was
INF 338 study Focus
Dreams/inf338study.com
FOR MORE CLASSES VISIT
www.inf338study.com