Survey
* Your assessment is very important for improving the work of artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the work of artificial intelligence, which forms the content of this project
Voltage Demonstration Steven Gough Innovation and Low Carbon Network Engineer [email protected] 0117 933 2170 07810 054850 Introduction • • • • • • Background Aims Progress in Phase 1 Phase 1 output graphs Plans for Phase 2 Learning so far Background • D-SVC - Static VAr Compensator for Distribution Networks • Supplied by Hitachi • Can produce 400kVAr leading or lagging • 11kV connected via a dedicated 11kV/415V transformer • Designed for use on long rural feeders that have Distributed Generation (DG) for voltage control Aims • Stabilise voltage for a windfarm at the end of a 11kV feeder • Establish the impact of the D-SVC on the 11kV network • Test the three different modes available on the DSVC – Voltage Regulation – Voltage Averaging – Short Term Fluctuations Progress in Phase 1 • D-SVC is installed on site adjacent to a 1.5MW windfarm in Cornwall • Protection was installed on the LV side of the transformer as there was not a metering unit • Monitoring equipment was installed along the feeder • D-SVC has been running on various modes for nearly 4 months Roskrow WF G Kernick Industrial Estate Summerheath D-SVC Bickland Hill Primary Voltage at D-SVC Real and Reactive Power at Windfarm 1800250 Phase 1 Output Graphs (1) 1600 1400245 1200 Phase to Line Votlage Va Va(max) Average kW Va(min) Max kW Vb Min kW Vb(max) Vb(min) Average kVar Vc Max kVar Vc(max) Min kVar Vc(min) Power 240 1000 800 235 600 400 230 200 0 225 -200 00:00 00:00 Real and Reactive Power at SVC 02:00 04:00 06:00 08:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 00:00 02:00 04:00 06:00 08:00 10:00 12:00Time 14:00 16:00 18:00 20:00 22:00 00:00 Time 500 400 300 200 Average kW Max kW Min kW Average kVar Max kVar Min kVar Power 100 0 -100 -200 -300 -400 -500 00:00 02:00 04:00 06:00 08:00 10:00 12:00 Time 14:00 16:00 18:00 20:00 22:00 00:00 Voltage at Windfarm 6450 Phase 1 Output Graphs (2) 6400 6350 Phase to Line Votlage 6300 Va Va(max) Va(min) Vb Vb(max) Vb(min) Vc Vc(max) Vc(min) 6250 6200 6150 6100 6050 6000 00:00 02:00 04:00 06:00 08:00 10:00 at D-SVC Voltage Voltage at Bickland Hill Primary Time 250 6450 6400 245 6350 PhasetotoLine LineVotlage Votlage Phase 6300 VaVa Va(max) Va(max) 240 6250 Va(min) Va(min) VbVb Vb(max) Vb(max) 6200 Vb(min) Vb(min) VcVc 235 6150 Vc(max) Vc(max) Vc(min) Vc(min) 6100 230 6050 6000 5950 225 00:00 00:00 02:00 02:00 04:00 04:00 06:00 06:00 08:00 10:00 12:00 12:00 Time Time 14:00 14:00 16:00 16:00 12:00 18:00 18:00 20:00 20:00 22:00 22:00 00:00 00:00 14:00 16:00 18:00 20:00 22:00 00:00 Voltage at Windfarm with D-SVC Switched In 6550 Phase 1 Output Graphs (3) 6500 6450 Phase to Line Votlage 6400 Va Va(max) Va(min) Vb Vb(max) Vb(min) Vc Vc(max) Vc(min) 6350 6300 6250 6200 6150 6100 6050 00:00 02:00 04:00 06:00 08:00 10:00 Time Voltage at Windfarm with D-SVC Switched Out 6550 6500 6450 Phase to Earth Votlage 6400 Va Va(max) Va(min) Vb Vb(max) Vb(min) Vc Vc(max) Vc(min) 6350 6300 6250 6200 6150 6100 6050 00:00 02:00 04:00 06:00 08:00 10:00 12:00 Time 14:00 16:00 18:00 12:00 20:00 22:00 00:00 14:00 16:00 18:00 20:00 22:00 00:00 Plans for Phase 2 • Three D-SVCs will be used across two adjacent primary substations • A D-VQC (Voltage and Reactive Power (Q) Control System) will be used at the primary to control all three D-SVCs and the tap changer at one of the primary substations • Although the site has not been confirmed, there is a combinations of medium wind generation, very long rural feeders and a large number of domestic properties with PV D-SVC G D-SVC D-SVC Learning so far • When setting up a protection of the D-SVC the protection needs to be on the HV side of the transformer • When sizing the transformer for a D-SVC it is important select well above the power requirement of the device • The D-SVC can help smooth the voltage • The D-SVC can help reduce the range of voltages see on the 11kV Any Questions? Steven Gough Innovation and Low Carbon Network Engineer [email protected] 0117 933 2170 07810 054850