Survey
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
SSTL New Technical Facility – Building Information To fulfil the requirements of BREEAM Credit M9 Publication of Building Information Basic Description of the Project The development comprises the construction of a new bespoke technical facility for Surrey Satellite Technology Ltd, built in collaboration with the University of Surrey. The development is situated within the Surrey Research Park, Guildford, Surrey. Basic Description of the Building The New Technical Facility known as The Kepler Building is located on Stevenson Place and is a 3 storey steel portal frame building, clad with lightweight metallic materials. The roof is metal standing seam and the rear and mid sections of the facades clad in silver coloured horizontal insulated panels. The front section is predominantly glazing and expressed vertical blue glass fins. Black ceramic tiles with white star flecks, stack bonded to give a modulated cladding appearance reinforce the corner giving strong contrast to the glazed entrance lobby. The building comprises working areas which encompass engineering, assembly, integration, testing and clean rooms to the ground and 1st floors. Plant areas and mezzanine storage are provided at second floor level. Core partitions and lift enclosures are constructed in block work; the remainder of the partitions are constructed of plasterboard and metal stud construction. The building is provided with two staircases located at opposite ends of building. The building is set within soft and hard landscaping with the provision of car parking and service areas. SSTL New Technical Facility – Building Information To fulfil the requirements of BREEAM Credit M9 Publication of Building Information BREEAM Rating & Score The New Technical facility is to aiming to achieve a ‘Very Good’ certification for BREEAM under the ‘Other Buildings’ scheme. An assessment of the likely performance against the credit criteria has indicated that it is possible to achieve a ‘Very Good’ BREEAM rating. The University has made a commitment to achieving this rating through careful and innovative design. The design team are currently finalising the required elements and compiling the necessary evidence to complete the BREEAM assessment. Key innovative and low-impact design features of the building Building Fabric: Lower ‘U’ values than those required for part L of the building regulations are being targeted. Air Tightness: A lower air permeability rate than required for part L of the Building Regulations is being targeted. Building Management System: A BMS will be used to monitor the energy usage within the facility. This will allow local control and optimum energy usage. Lighting & Lighting Control: High frequency Luminaires are to be utilised to reduce power consumption. This is combined with natural day light where possible to reduce the need for lighting use. Heating & Cooling: Fan coil units in areas of intermittent occupancy (such as meeting rooms) are interlocked with presence detectors to set the FCU’s into a set back mode, reducing fan speeds and increasing the temperature dead-bands to reduce energy consumption Heating and cooling water systems operate with variable speed pump sets and 2-port valves with pressure sensors reducing the pump speed to suit the building load only. Heat Recovery: Significant filtered return air recirculation is being utilised; this is direct heat recovery and saves energy. Heat is also recovered from the exhaust air. Solar Shading: Solar shading is provided by way of horizontal brise soleil to the south elevation and vertical tinted glass fins to the east elevation, which reduces the potential solar gain Landscaping & Earthworks: Cut & Fill approach adopted to reduce the usage of imported materials. Incorporation of reinforced soil slopes which reduce the amount of fill required and allow the use of locally available soils. SSTL New Technical Facility – Building Information To fulfil the requirements of BREEAM Credit M9 Publication of Building Information Basic Building Cost - £ 1592/m2 Services Costs - £ 712/m2 External Works - £ 144/m2 Gross floor area - 4758m2 Total area of site - 0.77 hectares Function areas and their size - 2316 (m2) Area of circulation - 653 (m2) Area of storage - 334 (m2) Predicted electricity consumption - 1331 kWh/m2 Predicted fossil fuel consumption - XXXXXX kWh/m2 – To be confirmed Predicted renewable energy generation - 0 kWh/m2- To be confirmed Predicted water use - 11.4 m3/person/year - To be confirmed Predicted water use to be provided by rainwater or grey water – 0% Reduce environmental impacts, i.e. innovative construction management techniques Protection of existing ancient woodland bounding the site, buy provision of tree root protection measures. Re-use and recycling of construction waste. All site waste is segregated into waste streams to ensure it can be re-cycled efficiently upon removal from site. During the construction process dust suppression techniques have been employed to minimise air pollution. Measures have been introduced to facilitate the Legacy use of the building. Provision has been made in the design of the structure to facilitate the introduction of infill floors which will minimise the enabling works required for the legacy use of the building. Social or economical sustainable measures achieved: Natural ventilation by way of openable windows has been provided to specific areas for both the current use and legacy use. The use of natural ventilation negates the energy consumption associated with mechanical ventilation. A sustainable drainage system has been adopted on the project which comprises the provision of large areas of permeable paving and associated attenuation tank. The tank is fitted with a Hydrobrake which restricts the discharge of water into the existing below ground surface water system. This rate mimics a similar discharge to that of a green field site.