Survey
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
COUNTY OF FAIRFAX, VIRGINIA DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES LAND DEVELOPMENT SERVICES 2016 COMPREHENSIVE UNIT PRICE SCHEDULE EFFECTIVE FEBRUARY 1, 2016 ENGLISH UNIT PRICE CATEGORY UNIT GENERAL CONDITIONS Field Offices and Temp Facilities General Supervision Job Sign Mobilization See Note below* NOTE: As a % of total for Surety Value Estimate (SVE): * Minimum of $12,600.00 for estimates up to $252K (Item 8 on SVE Form) plus 5% of amount over $252K (Item will automatically calculate under Section 9 on SVE Spreadsheet) CLEAR & GRUB Heavy Light Moderate Very Heavy $ $ $ $ LIGHT: Grading less than 2 feet in depth. Remove vegetation, grass areas and small shrubs, small trees less than 12 inches in diameter, small out buildings less than 200 square feet, remove small utilities, e.g., water feeder lines, sanitary laterals, small gas and electrical feeds. MODERATE: In addition to all under the Light category, grading of 2 feet to 4 feet depth, remove trees 12 inches to 24 inches in diameter, remove large shrubs up 48 inches in diameter. Remove all utility feeds, sanitary sewer pipe up to 8 inches, water lines up to 6 inches, storm sewer up to 15 inches, and gravel drive ways. Remove fencing and clear light industrial areas with small light poles. HEAVY: In addition to all included in Light and Moderate categories: Remove trees 24 inches to 36 inches, grading not exceeding 5 feet in depth. Remove heavy brush and undergrowth in wooded areas. Remove sanitary sewer larger than larger than 8 inches, and storm sewer from 15 inches to 27 inches. Remove utility poles, underground utility lines, and boxes/vaults of same. Remove water service lines up to 8 inches. VERY HEAVY: In addition to the first three category descriptions: Grading exceeding 5 feet of cut. Clear/remove heavily wooded areas with trees exceeding 36 inches diameter. Remove parking lot asphalt parking lot asphalt and curb and gutter. Remove pools and inground spas and all associated footings and foundations. Remove large fencing built with iron/steel pickets, razor wire, brick or concrete piers/foundations greater than 36 inches in diameter/on a side. Remove sanitary sewer pipes larger than 24 inches and septic systems/fields. Remove storm sewer pipe larger than 27 inches, remove large underground detention structures/vaults. Remove large/main water lines greater than 8 inches. Remove underground storage tanks. Page 1 of 44 14,418.53 7,522.72 11,284.07 16,299.21 AC AC AC AC COUNTY OF FAIRFAX, VIRGINIA DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES LAND DEVELOPMENT SERVICES 2016 COMPREHENSIVE UNIT PRICE SCHEDULE EFFECTIVE FEBRUARY 1, 2016 ENGLISH UNIT PRICE CATEGORY UNIT DEMOLITION Abandon pipes $ 188.07 EA Bituminous Pavement Up to 4" and dispose $ 7.52 SY $ $ $ 0.83 0.69 31.35 CF CF CY $ $ 12.54 15.05 SY SY $ $ $ $ 37.61 161.74 15.05 450.11 LF EA LF EA $ $ 43.89 56.43 LF LF $ $ $ 94,033.92 31,344.64 62,689.29 EA EA EA $ $ $ 1,082.02 144.19 288.37 LF LF LF $ $ $ $ 25.08 21.94 34.48 31.35 CY CY CY CY Rock, Blast Rock, Rip Rock, Hoe ram Used as fill on site regular bulk less than 5000 CY Used as fill on site regular bulk greater than 5000 CY $ $ $ $ $ 75.23 31.35 75.23 31.35 25.08 CY CY CY CY CY Site Grading - After cut/fill - rough grading Site Grading - Fine grading - dressed slopes Site Grading - Fine grading - relatively flat Unsuitable Material Dump Charge-unsuitable material Load and haul, 20 mile round trip average $ $ $ 0.83 0.96 0.62 SY SY SY $ $ 43.89 25.08 CY CY Building Demo includes demolition, load, haul and dump fee Building, Small, Masonry Building, Small, Wood Haul, Rubbish, 10 mi. R/T Concrete Pavement and Sidewalk WWF Reinforced and Disposal Non-reinforced WWF reinforced Guardrail: Remove and reset Remove traffic barricade Reset Manholes/structures (Sanitary & Storm) Pipe 6" - 12" 15" - 24" Relocate exist utility pole with wires - urban setting: (See NOTE: below) Multiple circuits, with devices One Phase, with secondary Three Phase, with secondary NOTE: A written quote from the appropriate utility company defining/detailing the full scope of work to accomplish relocation work may be submitted for review in lieu of these assigned prices. Relocate underground power Encased duct bank, includes cable Single phase, includes trenching Three phase, includes trenching EARTHWORK Borrow Material Borrow (Buy/Load) non-structural fill less than 5000 CY Borrow (Buy/Load) non-structural fill greater than 5000 CY Borrow (Buy/Load) select structural fill less than 5000 CY Borrow (Buy/Load) select structural fill great than 5000 CY Excavation Grading Page 2 of 44 COUNTY OF FAIRFAX, VIRGINIA DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES LAND DEVELOPMENT SERVICES 2016 COMPREHENSIVE UNIT PRICE SCHEDULE EFFECTIVE FEBRUARY 1, 2016 ENGLISH UNIT PRICE CATEGORY ENGINEERING AND SURVEY As-Built Drawing Plan Processing As-Built Drawing Survey As-Built (minimum) Dry Pond Wet Pond Geotech Testing: Geotech Professional Engineer certification Soils/concrete/rebar inspector R.O.W. Monuments Surveyed In Place RM-1 RM-2 Steel Pipe Property Corner Marker (includes survey) Storm and Sanitary As-Built Test Pits (not allowing for rock excavation): Each location 10' deep but not exceeding 15' deep Each location not exceeding 10' deep Video inspection: Storm sewer Utility pipes LANDSCAPING Shrubs 12" 2 gallon 18" 3 gallon 24" 5 gallon Trees Deciduous 1.0 to 1.5" caliper 1.5 to 2.0" caliper 2.0 to 2.5" caliper 2.5 to 3.0 caliper 3.0 to 3.5 caliper Evergreen 5 to 6' in height 6 to 8' in height 8 to 10' in height 10 to 12' in height Tree Well Tree Well, Stone (D=10', H=3') MISCELLANEOUS SITE IMPROVEMENTS Ball Fields Backstop (PA-10) Baseball infield (PA-6) Bleacher pad (PA-9) Little League infield (PA-5) Outfield fence (PA-13) 6'H with 10 foot warning track Player area: 6'H (PA-12) 8'H with 10 foot warning track Sideline fence (PA-13) 4'H with 10 foot warning track 6'H with 10 foot warning track Softball infield (PA-7) Page 3 of 44 UNIT $ $ $ $ 788 4,795 1,504.55 2,194.13 LS LS AC AC $ $ 100.30 31.35 HR HR $ $ $ $ 940.34 626.89 313.45 3.13 EA EA EA LF $ $ 1,880.68 940.34 EA EA $ $ 8.28 8.27 LF LF $ $ $ 47.64 60.18 81.50 EA EA EA $ $ $ $ $ 300.91 426.29 564.20 852.57 1,128.40 EA EA EA EA EA $ $ $ $ 263.29 476.44 840.03 1,128.40 EA EA EA EA $ 4,388.25 EA $ $ $ $ 9,403.40 17,553.00 16,573.80 6,268.92 EA EA EA EA $ $ $ 47.64 5,802.52 50.15 LF EA LF $ $ $ 37.61 46.40 12,537.86 LF LF EA COUNTY OF FAIRFAX, VIRGINIA DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES LAND DEVELOPMENT SERVICES 2016 COMPREHENSIVE UNIT PRICE SCHEDULE EFFECTIVE FEBRUARY 1, 2016 ENGLISH UNIT PRICE CATEGORY UNIT Bike Racks Bike racks(4 bikes) $ 313.45 EA Bus shelter $ 25,075.71 EA Multi-Use Court & Equipment, PA 25 and 26 Tennis Courts (2), PA-15 Thru 18 Tennis Practice Court and Wall, PA-19 to 23 $ $ $ 31,344.64 56,420.35 25,075.71 EA EA EA Board fence (H=6') Chain-link fence (H=6') FR-2B Farm fence (H=5') FR-3A Remove and reset existing chain link fence Snow fence Standard fence (H=5') FR-5 $ $ $ $ $ $ 50.15 50.15 31.35 12.54 6.27 25.08 LF LF LF LF LF LF $ 752.27 EA Picnic Table, (PA-2) $ 714.65 EA Retaining Walls Concrete gravity RW-2 (H < 6 FT.) Concrete gravity RW-3 (H < 6 FT.) Dry rubble RW-1 (H< 6 FT.) Mortared rubble RW-1A (H < 6 FT.) $ $ $ $ 401.21 451.36 526.59 651.97 LF LF LF LF Soccer Field (includes grading) Seeded field Sodded field $ $ 43,882.49 188,067.86 EA EA Swimming Pool Community School (Olympic) $ $ 75.23 106.58 SF SF Tot Lot Equipment, PA 3-4 Revolving device300/150 Sliding device550/150 Stationary device300/100 Swinging device450/200 Tot Lot - Mulch Surface Tot Lot - Synthetic Surface $ $ $ $ $ $ 6,895.83 6,268.92 7,522.72 6,268.92 10.03 20.06 EA EA EA EA SF SF Trash Enclosures/Receptacles Trash enclosures-brick/CMU 6' high Trash receptacles-Victor Stanley Model S-45 Trash enclosures-wood 6' high $ $ $ 376.13 1,253.78 37.61 LF EA LF Trash Pads Trash pads 6" thick concrete $ 12.54 SF Bus Shelters Courts Fencing Metal Bollards Painted metal bollards with concrete base Recreational Page 4 of 44 COUNTY OF FAIRFAX, VIRGINIA DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES LAND DEVELOPMENT SERVICES 2016 COMPREHENSIVE UNIT PRICE SCHEDULE EFFECTIVE FEBRUARY 1, 2016 ENGLISH UNIT PRICE CATEGORY UNIT ROCK EXCAVATION IN TRENCHES, DE-WATERING, and SELECT BACKFILL - THESE PRICES ARE UNIFORM FOR ALL PIPE TYPES STORM SEWER, SANITARY SEWER, AND WATER SERVICE STORM SEWER ARCH PIPE - CMP PLAIN, 12 GA 6'-9" x 4'-11" Pipe Arch (72" Equivalent) 0'-14' Cut 14'-20' Cut 7'-11" x 5'-7" Pipe Arch (84" Equivalent) 0'-14' Cut 14'-20' Cut 9'-4" x 6'-3" Pipe Arch (96" Equivalent) 0'-14' Cut 14'-20' Cut 10'-8" x 6'-11" Pipe Arch (108" Equivalent) 0'-14' Cut 14'-20' Cut 11'-10" x 7'-7" Pipe Arch (120" Equivalent) 0'-14' Cut 14'-20' Cut 42" x 29" Pipe Arch (36" Equivalent) 0'-12' Cut 0'-12' Cut; Coated, Paved Invert 12'-18' Cut 12'-18' Cut; Coated, Paved Invert 49" x 33" Pipe Arch (42" Equivalent) 0'-12' Cut 0'-12' Cut; Coated, Paved Invert 12'-18' Cut 12'-18' Cut; Coated, Paved Invert 57" x 38" Pipe Arch (48" Equivalent) 0'-12' Cut 0'-12' Cut; Coated, Paved Invert 12'-18' Cut 12'-18' Cut; Coated, Paved Invert 64" x 43" Pipe Arch (54" Equivalent) 0'-12' Cut 0'-12' Cut; Coated, Paved Invert 12'-18' Cut 12'-18' Cut; Coated Paved Invert 71" x 47" Pipe Arch (60" Equivalent) 0'-12' Cut 0'-12' Cut; Coated, Paved Invert 12'-18' Cut 12'-18' Cut; Coated Paved Invert Page 5 of 44 $ $ 283.35 378.64 LF LF $ $ 317.21 421.27 LF LF $ $ 358.58 476.44 LF LF $ $ 416.26 552.92 LF LF $ $ 445.10 591.78 LF LF $ $ $ $ 115.35 130.39 164.25 179.30 LF LF LF LF $ $ $ $ 131.65 149.20 181.80 199.35 LF LF LF LF $ $ $ $ 144.19 163.18 198.10 217.10 LF LF LF LF $ $ $ $ 161.74 184.32 241.99 264.56 LF LF LF LF $ $ $ $ 195.59 220.66 293.38 318.46 LF LF LF LF COUNTY OF FAIRFAX, VIRGINIA DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES LAND DEVELOPMENT SERVICES 2016 COMPREHENSIVE UNIT PRICE SCHEDULE EFFECTIVE FEBRUARY 1, 2016 ENGLISH UNIT PRICE CATEGORY UNIT PLAIN, 14 GA 24" x 18" Pipe Arch (21" Equivalent) 0'-10' Cut 0'-10' Cut; Coated, Paved Invert 10'-16' Cut 10'-16' Cut, Coated, Paved Invert 28" x 20" Pipe Arch (24" Equivalent) 0'-10' Cut 0'-10' Cut; Coated, Paved Invert 10'-16' Cut 10'-16' Cut, Coated, Paved Invert 35" x 24" Pipe Arch (30" Equivalent) 0'-10' Cut 0'-10' Cut; Coated, Paved Invert 10'-16' Cut 10'-16' Cut, Coated, Paved Invert PLAIN, 16 GA 17" x 13" Pipe Arch (15" Equivalent) 0'-10' Cut 0'-10' Cut; Coated, Paved Invert 10'-16' Cut 10'-16' Cut, Coated, Paved Invert 21" x 15" Pipe Arch (18" Equivalent) 0'-10' Cut 0-10' Cut; Coated, Paved Invert 10'-16' Cut 10-16' Cut; Coated, Paved Invert $ $ $ $ 58.93 67.71 95.29 104.07 LF LF LF LF $ $ $ $ 71.47 80.87 109.08 118.49 LF LF LF LF $ $ $ $ 84.01 95.61 99.05 110.65 LF LF LF LF $ $ $ $ 51.41 58.01 92.78 99.06 LF LF LF LF $ $ $ $ 56.43 63.95 95.29 102.81 LF LF LF LF $ 26.26 LF $ $ $ $ $ 657.48 821.86 989.11 1,312.09 1,643.71 LF LF LF LF LF CULVERTS Box Culverts on Piles (BC-P) Timber Piles - Treated (No mobilization) Double Box Culvert (BC-2B) Fills to 25' Size 4' x 4' 5' x 5' 6' x 6' 8' x 8' 10' x10' Page 6 of 44 COUNTY OF FAIRFAX, VIRGINIA DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES LAND DEVELOPMENT SERVICES 2016 COMPREHENSIVE UNIT PRICE SCHEDULE EFFECTIVE FEBRUARY 1, 2016 ENGLISH UNIT PRICE CATEGORY Gravity Wing for Box Culvert (1 Side Only) Height of Box 4' 5' 6' 8' 10' Oversized Single Box Culvert (BBC-1) Fills to 25' Size 12' x 6' 12' x 8' 12' x 10' 12' x 12' Quadruple Box Culvert (BC-4B) Fills to 25' Size 4' x 4' 5' x 5' 6' x 6' 8' x 8' 10' x 10' Single Box Culvert (BC-1A) Fills to 25' Size 4' x 4' 5' x 5' 6' x 6' 8 'x 8' 10' x10' Standard Wing for Box Culvert (1 Side Only) Height of Box 4' 5' 6' 8' 10' Standard Wing for Oversized Box Culvert (BBC-W) Height of Box 6' 8' 10' 12' Triple Box Culvert (BC-3B) Fills to 25' Size 4' x 4' 5' x 5' 6' x 6' 8' x 8' 10' x10' Page 7 of 44 UNIT $ $ $ $ $ 996.32 1,529.80 2,037.34 3,467.66 4,137.50 EA EA EA EA EA $ $ $ $ 1,203.95 1,329.39 1,456.27 1,583.16 LF LF LF LF $ $ $ $ $ 1,157.81 1,436.08 1,799.43 1,763.38 3,350.87 LF LF LF LF LF $ $ $ $ $ 393.63 488.79 586.84 816.09 994.88 LF LF LF LF LF $ $ $ $ $ 795.91 1,188.08 1,583.16 2,941.38 3,923.29 EA EA EA EA EA $ $ $ $ 1,568.73 2,588.13 3,861.28 5,639.08 EA EA EA EA $ $ $ $ $ 904.04 1,128.97 1,413.02 1,930.64 2,932.73 LF LF LF LF LF COUNTY OF FAIRFAX, VIRGINIA DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES LAND DEVELOPMENT SERVICES 2016 COMPREHENSIVE UNIT PRICE SCHEDULE EFFECTIVE FEBRUARY 1, 2016 ENGLISH UNIT PRICE CATEGORY UNIT CURB DROP INLETS - PRECAST Curb Drop Inlet (DI-3A) 12"-30" Pipe (Invert depth (H)=0'-8') Inlet length 2'-6" Curb Drop Inlet (DI-3AA) 12"-30" Pipe (Invert depth (H)=8'-20') Inlet length 2'-6" Curb Drop Inlet (DI-3B & DI-12) 12"-30" Pipe (Invert depth (H)=0'-8') Inlet length 4' 6' 8' 10' 12' 16' 20' Curb Drop Inlet (DI-3BB) 12"-30" Pipe (Invert depth (H)=8'-20') Inlet length 4' 6' 8' 10 12' 16' 20' Curb Drop Inlet (DI-3C) 12"-30" Pipe (Invert depth (H)=0'-8') Inlet length 6' 8' 10 12' 16' 20' Curb Drop Inlet (DI-3CC) 12"-30" Pipe (Invert depth (H)=8'-20') Inlet length 6' 8' 10 12' 16' 20' Page 8 of 44 $ 4,781.57 EA $ 6,258.64 EA $ $ $ $ $ $ $ 5,038.09 5,380.12 5,759.39 5,951.09 6,142.80 6,517.93 6,897.20 EA EA EA EA EA EA EA $ $ $ $ $ $ $ 5,007.75 5,698.71 6,389.67 6,735.15 7,080.63 7,433.69 7,786.76 EA EA EA EA EA EA EA $ $ $ $ $ $ 4,712.60 5,403.57 5,749.04 6,094.53 6,785.49 7,476.45 EA EA EA EA EA EA $ $ $ $ $ $ 5,582.85 6,232.45 6,641.37 7,050.28 7,989.50 8,792.18 EA EA EA EA EA EA COUNTY OF FAIRFAX, VIRGINIA DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES LAND DEVELOPMENT SERVICES 2016 COMPREHENSIVE UNIT PRICE SCHEDULE EFFECTIVE FEBRUARY 1, 2016 ENGLISH UNIT PRICE CATEGORY Curb Drop Inlet (DI-3D) 12"-30" Pipe (Invert depth (H)=0'-8') Inlet length 2'-6" Curb Drop Inlet (DI-3DD) 12"-30" Pipe (Invert depth (H)=8'-20') Inlet length 2'-6" Curb Drop Inlet (DI-3E) 12"-30" Pipe (Invert depth (H)=0'-8') Inlet length 4' 8' 10 12' 16' 20' Curb Drop Inlet (DI-3EE) 12"-30" Pipe (Invert depth (H)=8'-20') Inlet length 6' 8' 10' 12' 16' 20' Curb Drop Inlet (DI-3F) 12"-30" Pipe (Invert depth (H)=0'-8') Inlet length 6' 8' 10 12' 16' 20' Curb Drop Inlet (DI-3FF) 12"-30" Pipe (Invert depth (H)=8'-20') Inlet length 6' 8' 10' 12' 16' 20' Page 9 of 44 UNIT $ 4,258.86 EA $ 5,110.64 EA $ $ $ $ $ $ 4,820.18 5,591.13 6,755.14 6,368.98 7,141.32 7,920.54 EA EA EA EA EA EA $ $ $ $ $ $ 8,908.02 9,276.26 9,456.93 9,637.60 9,998.94 10,357.52 EA EA EA EA EA EA $ $ $ $ $ $ 4,431.26 5,200.83 5,591.13 5,981.44 6,751.01 7,531.61 EA EA EA EA EA EA $ $ $ $ $ $ 9,530.02 9,776.90 10,005.14 10,233.40 10,673.35 11,147.79 EA EA EA EA EA EA COUNTY OF FAIRFAX, VIRGINIA DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES LAND DEVELOPMENT SERVICES 2016 COMPREHENSIVE UNIT PRICE SCHEDULE EFFECTIVE FEBRUARY 1, 2016 ENGLISH UNIT PRICE CATEGORY Curb Drop Inlet (DI-4A) 36"-48" Pipe (Invert depth (H)=0'-8') Inlet length 4' Curb Drop Inlet (DI-4AA) 36"-48" Pipe (Invert depth (H)=8'-20') Inlet length 4' Curb Drop Inlet (DI-4B) 36"-48" Pipe (Invert depth (H)=0'-8') Inlet length 6' 8' 10' 12' 16' 20' Curb Drop Inlet (DI-4BB) 36"-48" Pipe (Invert depth (H)=8'-20') Inlet length 6' 8' 10' 12' 16' 20' Curb Drop Inlet (DI-4C) 36"-48" Pipe (Invert depth (H)=0'-8') Inlet length 8' 10' 12' 16' 20' Curb Drop Inlet (DI-4CC) 36"-48" Pipe (Invert depth (H)=8'-20') Inlet length 8' 10' 12' 16' 20' Page 10 of 44 UNIT $ 5,709.74 EA $ 8,033.63 EA $ $ $ $ $ $ 6,080.73 6,491.72 6,697.91 6,904.10 7,316.46 7,730.22 EA EA EA EA EA EA $ $ $ $ $ $ 12,153.19 12,558.67 12,760.02 12,961.39 13,368.24 13,772.33 EA EA EA EA EA EA $ $ $ $ $ 6,610.34 6,817.33 7,024.09 7,433.69 7,847.44 EA EA EA EA EA $ $ $ $ $ 15,805.22 16,198.98 16,592.72 17,377.48 18,167.73 EA EA EA EA EA COUNTY OF FAIRFAX, VIRGINIA DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES LAND DEVELOPMENT SERVICES 2016 COMPREHENSIVE UNIT PRICE SCHEDULE EFFECTIVE FEBRUARY 1, 2016 ENGLISH UNIT PRICE CATEGORY Curb Drop Inlet (DI-4D) 36"-48" Pipe (Invert depth (H)=0'-8') Inlet length 4' Curb Drop Inlet (DI-4DD) 36"-48" Pipe (Invert depth (H)=8'-16') Inlet length 4' Curb Drop Inlet (DI-4E) 36"-48" Pipe (Invert depth (H)=0'-8') Inlet length 6' 8' 10' 12' 16' 20' Curb Drop Inlet (DI-4EE) 36"-48" Pipe (Invert depth (H)=8'-16') Inlet length 6' 8' 10' 12' 16' 20' Curb Drop Inlet (DI-4F) 36"-48" Pipe (Invert depth (H)=0'-8') Inlet length 8' 10' 12' 16' 20' Curb Drop Inlet (DI-4FF) 36"-48" Pipe (Invert depth (H)=8'-16') Inlet length 8' 10' 12' 16' 20' Page 11 of 44 UNIT $ 5,780.07 EA $ 11,145.03 EA $ $ $ $ $ $ 6,192.45 6,603.44 6,976.50 7,349.57 8,254.30 9,077.66 EA EA EA EA EA EA $ $ $ $ $ $ 10,831.96 11,225.02 11,618.77 12,012.52 12,784.85 13,586.15 EA EA EA EA EA EA $ $ $ $ $ 6,924.78 7,337.16 7,749.52 8,574.27 9,397.62 EA EA EA EA EA $ $ $ $ $ 10,467.85 10,807.13 11,146.40 11,826.34 12,504.89 EA EA EA EA EA COUNTY OF FAIRFAX, VIRGINIA DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES LAND DEVELOPMENT SERVICES 2016 COMPREHENSIVE UNIT PRICE SCHEDULE EFFECTIVE FEBRUARY 1, 2016 ENGLISH UNIT PRICE CATEGORY UNIT DROP INLETS Cast in Place - 48" Drop Inlet (DI-1) 12"-24" Pipe 0-10 Vertical feet (VF) Drop Inlet (DI-1A) 12"-24" Pipe 10-20 VF Drop Inlet (DI-2) 12"-24" Pipe 0-10 VF, 10' throat Drop Inlet (DI-2A) 12"-24" Pipe 10-20 VF, 10' throat Precast - 48" Drop Inlet (DI-1APC) 12"-24" Pipe 10-20 VF Drop Inlet (DI-1PC) 12"-24" Pipe 0-10 VF Drop Inlet (DI-2APC) 12"-24" Pipe 10-20 VF, 10' throat Drop Inlet (DI-2PC) 12"-24" Pipe 0-10 VF, 10' throat ELLIPTICAL PIPE - CMP $ 4,356.90 EA $ 6,577.35 EA $ 8,133.31 EA $ 10,396.39 EA $ 7,065.08 EA $ 4,356.90 EA $ 9,962.58 EA $ 7,797.29 EA $ $ $ $ 95.29 109.09 142.93 156.73 LF LF LF LF $ $ $ $ 121.62 137.60 183.05 199.04 LF LF LF LF $ $ $ $ 135.41 153.46 203.11 221.16 LF LF LF LF $ $ $ $ 70.21 79.12 107.83 116.73 LF LF LF LF $ $ $ $ 81.50 92.79 122.87 134.16 LF LF LF LF $ $ $ $ 51.41 57.99 86.52 93.10 LF LF LF LF PLAIN, 12 GA 45" X 29" Elliptical Pipe (36" equivalent) 0'-10' Cut 0'-10' Cut; Coated, Paved Invert 10'-16' Cut 10'-16' Cut; Coated, Paved Invert 53" X 34" Elliptical Pipe (42" equivalent) 0'-12' Cut 0'-12' Cut; Coated, Paved Invert 10'-18' Cut 10'-18' Cut; Coated, Paved Invert 60" X 38" Elliptical Pipe (48" equivalent) 0'-12' Cut 0'-12' Cut; Coated, Paved Invert 10'-18' Cut 10'-18' Cut; Coated, Paved Invert PLAIN, 14 GA 30" X 19" Elliptical Pipe (24" equivalent) 0'-10' Cut 0'-10' Cut; Coated, Paved Invert 10'-16' Cut 10'-16' Cut; Coated, Paved Invert 38" X 24" Elliptical Pipe (30" equivalent) 0'-10' Cut 0'-10' Cut; Coated, Paved Invert 10'-16' Cut 10'-16' Cut; Coated, Paved Invert PLAIN, 16 GA 23" X 14" Elliptical Pipe (18" equivalent) 0'-10' Cut 0'-10' Cut; Coated, Paved Invert 10'-16' Cut 10'-16' Cut; Coated, Paved Invert Page 12 of 44 COUNTY OF FAIRFAX, VIRGINIA DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES LAND DEVELOPMENT SERVICES 2016 COMPREHENSIVE UNIT PRICE SCHEDULE EFFECTIVE FEBRUARY 1, 2016 ENGLISH UNIT PRICE CATEGORY UNIT ELLIPTICAL PIPE - RCP CLASS III 23" X 14" Elliptical Pipe (18" Equivalent) 0'-10' Cut 0'-10' Cut; "O" Ring Upgrade 0'-10' Cut; Class HE/IV Upgrade 10'-16' Cut 10'-16' Cut; "O" Ring Upgrade 10'-16' Cut; Class HE/IV Upgrade 30" X 19" Elliptical Pipe (24" equivalent) 0'-10' Cut 0'-10' Cut; "O" Ring Upgrade 0'-10' Cut; Class HE/IV Upgrade 10'-16' Cut 10'-16' Cut; "O" Ring Upgrade 10'-16' Cut; Class HE/IV Upgrade 38" X 24" Elliptical Pipe (30" equivalent) 0'-10' Cut 0'-10' Cut; "O" Ring Upgrade 0'-10' Cut; Class HE/IV Upgrade 10'-16' Cut 10'-16' Cut; "O" Ring Upgrade 10'-16' Cut; Class HE/IV Upgrade 45" X 29" Elliptical Pipe (36" equivalent) 0'-10' Cut 0'-10' Cut; "O" Ring Upgrade 0'-10' Cut; Class HE/IV Upgrade 10'-16' Cut 10'-16' Cut; "O" Ring Upgrade 10'-16' Cut; Class HE/IV Upgrade 53" X 34" Elliptical Pipe (42" equivalent) 0'-12' Cut 0'-12' Cut; "O" Ring Upgrade 0'-12' Cut; Class HE/IV Upgrade 10'-18' Cut 10'-18' Cut; "O" Ring Upgrade 10'-18' Cut; Class HE/IV Upgrade 60" X 38" Elliptical Pipe (48" equivalent) 0'-12' Cut 0'-12' Cut; "O" Ring Upgrade 0'-12' Cut; Class HE/IV Upgrade 10'-18' Cut 10'-18' Cut; "O" Ring Upgrade 10'-18' Cut; Class HE/IV Upgrade 76" X 48" Elliptical Pipe (60" equivalent) 0'-12' Cut 0'-12' Cut; "O" Ring Upgrade 0'-12' Cut; Class HE/IV Upgrade 10'-18' Cut 10'-18' Cut; "O" Ring Upgrade 10'-18' Cut; Class HE/IV Upgrade Page 13 of 44 $ $ $ $ $ $ 85.26 135.41 104.07 127.88 178.04 146.70 LF LF LF LF LF LF $ $ $ $ $ $ 106.58 156.73 113.22 160.49 210.63 167.14 LF LF LF LF LF LF $ $ $ $ $ $ 136.67 196.84 146.27 204.27 264.56 213.97 LF LF LF LF LF LF $ $ $ $ $ $ 191.83 254.53 204.69 287.12 349.81 299.98 LF LF LF LF LF LF $ $ $ $ $ $ 245.74 314.71 263.30 368.61 437.57 386.17 LF LF LF LF LF LF $ $ $ $ $ $ 304.67 387.42 326.00 457.64 540.39 478.96 LF LF LF LF LF LF $ $ $ $ $ $ 455.13 549.17 487.73 682.06 776.10 714.66 LF LF LF LF LF LF COUNTY OF FAIRFAX, VIRGINIA DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES LAND DEVELOPMENT SERVICES 2016 COMPREHENSIVE UNIT PRICE SCHEDULE EFFECTIVE FEBRUARY 1, 2016 ENGLISH UNIT PRICE CATEGORY UNIT STORM STRUCTURES END SECTIONS End Section (ES-1), Concrete Pipe Size 12" 15" 18" 21" 24" 27" 30" 36" 42" 48" 54" 60" $ $ $ $ $ $ $ $ $ $ $ $ 535.37 595.55 733.47 873.89 921.53 1,226.20 1,351.59 2,023.61 2,057.46 2,471.21 3,294.95 4,035.94 EA EA EA EA EA EA EA EA EA EA EA EA End Section (ES-2), CMP Pipe Size 12" 15" 18" 21" 24" 30" 36" 42" 48" 54" 60" $ $ $ $ $ $ $ $ $ $ $ 196.85 213.14 235.71 289.63 344.80 541.63 1,016.82 1,291.39 1,604.85 2,143.98 2,994.04 EA EA EA EA EA EA EA EA EA EA EA End Section (ES-3), Arch Pipe - CMP Pipe Size 17" x 13" (15"0) 21" x 15" (18"0) 24" x 18" (21"0) 28" x 20" (24"0) 35" x 24" (30"0) 42" x 24" (36"0) 49" x 33" (42"0) 57" x 38" (48"0) 64" x 43" (54"0) 71" x 47" (60"0) $ $ $ $ $ $ $ $ $ $ 218.16 224.43 285.86 341.03 450.11 734.72 975.44 1,145.96 1,687.60 2,121.41 EA EA EA EA EA EA EA EA EA EA Page 14 of 44 COUNTY OF FAIRFAX, VIRGINIA DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES LAND DEVELOPMENT SERVICES 2016 COMPREHENSIVE UNIT PRICE SCHEDULE EFFECTIVE FEBRUARY 1, 2016 ENGLISH UNIT PRICE CATEGORY UNIT ENDWALLS Endwall (EW-1) Cast In Place [Round pipe (12"-36")] Pipe Size 12" 15" 18" 24" 30" 36" $ $ $ $ $ $ 752.27 1,003.02 1,191.09 1,504.55 2,507.57 2,758.33 EA EA EA EA EA EA Endwalls (EW-1) Precast [Round pipe (12"-36")] Pipe Size 12" 15" 18" 24" 30" 36" $ $ $ $ $ $ 940.34 1,003.02 1,567.24 2,382.19 2,507.57 2,758.33 EA EA EA EA EA EA Endwall (EW-1A) Cast In Place [Elliptical Pipe (18"-42" equivalent)] Pipe Size 23" x 14" (18") 30" x 19" (24") 38" x 24" (30") 45" x 29" (36") 53" x 34" (42") $ $ $ $ $ 734.72 1,058.19 1,441.86 1,883.19 2,449.90 EA EA EA EA EA Endwall (EW-1A) Precast [Elliptical Pipe (18"-42" equivalent)] Pipe Size 23" x 14" (18") 30" x 19" (24") 38" x 24" (30") 45" x 29" (36") 53" x 34" (42") $ $ $ $ $ 796.16 1,122.14 1,297.67 1,629.93 2,068.75 EA EA EA EA EA Endwall (EW-2) Cast In Place [Pipe (42"-84")] Pipe Size 42" 48" 54" 60" 72" 84" $ $ $ $ $ $ 5,581.85 7,101.45 8,224.83 9,662.92 12,665.75 14,531.37 EA EA EA EA EA EA Page 15 of 44 COUNTY OF FAIRFAX, VIRGINIA DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES LAND DEVELOPMENT SERVICES 2016 COMPREHENSIVE UNIT PRICE SCHEDULE EFFECTIVE FEBRUARY 1, 2016 ENGLISH UNIT PRICE CATEGORY UNIT Endwall (EW-2) Precast [Round pipe (42"-84")] Pipe Size 42" 48" 54" 60" 72" 84" $ $ $ $ $ $ 6,376.75 6,706.50 7,804.81 8,350.21 9,385.85 11,188.78 EA EA EA EA EA EA Endwall (EW-2A) Cast In Place [Elliptical Pipe 60"x38" (48")] Pipe Size 60" x 38" (48") $ 7,101.45 EA Endwall (EW-2PC) Precast [Pipe (42"- 48")] Pipe Size 42" 48" $ $ 6,376.75 6,705.25 EA EA Endwall (EW-2APC) Precast [Elliptical Pipe 60"x38" (48")] Pipe Size 60" x 38" (48") $ 6,771.70 EA Endwall (EW-6PC) Precast [Double Pipe (12"-36")] Pipe Size 2-12" 2-15" 2-18" 2-24" 2-30" 2-36" $ $ $ $ $ $ 984.22 1,157.24 1,355.34 1,739.00 2,507.57 3,081.80 EA EA EA EA EA EA Endwall (EW-8) Cast in Place: [Right-angle pipe (12"-48")] Pipe Size 12" 15" 18" 24" 30" 36" 42" 48" $ $ $ $ $ $ $ $ 748.51 950.37 1,103.33 1,537.15 1,992.26 2,558.97 3,118.17 3,740.04 EA EA EA EA EA EA EA EA Page 16 of 44 COUNTY OF FAIRFAX, VIRGINIA DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES LAND DEVELOPMENT SERVICES 2016 COMPREHENSIVE UNIT PRICE SCHEDULE EFFECTIVE FEBRUARY 1, 2016 ENGLISH UNIT PRICE CATEGORY Endwall (EW-8PC) Precast: [Right-angle pipe (12"-48")] Pipe Size 12" 15" 18" 24" 30" 36" 42" 48" Endwall (EW-9PC) Precast: [Arch Pipe (15"-48" equivalent)] Pipe Size 17" x 13" (15") 21" x 15" (18") 24" x 18" (21") 28" x 20" (24") 35" x 24" (30") 42" x 29" (36") 49" x 33" (42") 57" x 38" (48") UNIT $ $ $ $ $ $ $ $ 1,449.38 1,567.24 1,790.41 1,982.23 2,398.49 2,813.49 3,178.35 3,580.81 EA EA EA EA EA EA EA EA $ $ $ $ $ $ $ $ 942.84 1,150.97 1,334.03 1,504.55 1,649.99 2,017.34 2,916.30 3,099.36 EA EA EA EA EA EA EA EA $ $ $ $ $ $ 1,542.16 1,816.73 2,063.73 2,324.52 3,121.92 3,761.35 EA EA EA EA EA EA Endwall (EW-10PC) Precast [Arch Pipe (15"-36" equivalent)] Pipe Size 17" x 13" (15") 21" x 15" (18") 24" x 18" (21") 28" x 20" (24") 35" x 24" (30") 42" x 29" (36") Page 17 of 44 COUNTY OF FAIRFAX, VIRGINIA DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES LAND DEVELOPMENT SERVICES 2016 COMPREHENSIVE UNIT PRICE SCHEDULE EFFECTIVE FEBRUARY 1, 2016 ENGLISH UNIT PRICE CATEGORY UNIT HDPE PIPE 6" Pipe 0'-8' Cut 8'-14' Cut $ $ 29.78 44.68 LF LF 0'-8' Cut 8'-14' Cut $ $ 33.36 50.05 LF LF 0'-8' Cut 8'-14' Cut $ $ 40.12 60.18 LF LF 0'-8' Cut 8'-14' Cut $ $ 45.14 67.70 LF LF 0'-10' Cut 10'-16' Cut $ $ 58.93 88.39 LF LF 0'-10' Cut 10'-16' Cut $ $ 77.73 116.61 LF LF 0'-10' Cut 10'-16' Cut $ $ 90.77 136.36 LF LF 0'-10' Cut 10'-16' Cut $ $ 107.83 161.74 LF LF 0'-10' Cut 10'-16' Cut $ $ 119.67 179.48 LF LF 0'-10' Cut 10'-16' Cut $ $ 134.53 201.74 LF LF 0'-10' Cut 10'-16' Cut $ $ 152.96 230.70 LF LF 0'-10' Cut 10'-16' Cut $ $ 211.26 316.89 LF LF 8" Pipe 10" Pipe 12" Pipe 15" Pipe 18" Pipe 24" Pipe 30" Pipe 36" Pipe 42" Pipe 48" Pipe 60" Pipe Page 18 of 44 COUNTY OF FAIRFAX, VIRGINIA DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES LAND DEVELOPMENT SERVICES 2016 COMPREHENSIVE UNIT PRICE SCHEDULE EFFECTIVE FEBRUARY 1, 2016 ENGLISH UNIT PRICE CATEGORY UNIT MANHOLES NOTE: As appropriate, additional costs - amount to add to unit costs below. ADD: Standard Brick Manhole - (MH-1) 6' depth 6' depth with Heavy Duty Frame and Cover 6' depth with Watertight Frame and Cover Depth below 6' $ $ $ $ 4,513.63 5,215.74 5,190.68 188.07 EA EA EA VF Manhole Covers Heavy Duty Frame/Cover Watertight Frame/Cover $ $ 702.12 677.04 EA EA Standard Frame and Cover (MH-2) 4 FT ID 6' depth 6' depth with Heavy Duty Frame and Cover 6' depth with Watertight Frame and Cover Depth below 6' $ $ $ $ 3,761.35 4,463.47 4,438.40 200.60 EA EA EA VF Median Drop Inlet (DI-6A) 12"-24" Pipe Inlet (H=8') $ 4,958.09 EA Median Drop Inlet (DI-6B) 12"-24" Pipe Inlet (H=8') $ 5,029.82 EA Median Drop Inlet (DI-6C) 30"-48" Pipe Inlet (H=10') $ 6,607.58 EA Median Drop Inlet (DI-6D) 30"-48" Pipe Inlet (H=10') $ 6,716.53 EA Median Drop Inlet (DI-7) Type III Top 12"-42" Pipe Inlet (H=10') $ 6,793.76 EA Median Drop Inlet (DI-7A) Type III Top 12"-42" Pipe Inlet (H=10') $ 7,476.45 EA Median Drop Inlet (DI-7B) Type III Top 12"-42" Pipe Inlet (H=10') $ 8,030.88 EA MEDIAN DROP INLETS - CIP Page 19 of 44 COUNTY OF FAIRFAX, VIRGINIA DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES LAND DEVELOPMENT SERVICES 2016 COMPREHENSIVE UNIT PRICE SCHEDULE EFFECTIVE FEBRUARY 1, 2016 ENGLISH UNIT PRICE CATEGORY UNIT MISCELLANEOUS INLETS Ditch Drop Inlet, (DI-5) Type III Top 12"-42" Pipe Inlet (H=8') $ 6,167.62 EA Standard Yard Inlet (YI-1) 12"-48" Pipe (Invert depth (H)=0'-8') Add Yard Inlet With Apron Inlet length 4' (No Aprons) Add Yard Inlet Apron $ $ $ 5,876.62 5,584.24 292.39 EA EA THROAT Standard Yard Inlet (YI-2) 12"-48" Pipe (Invert depth (H)=0'-8') Add Yard Inlet With Apron Inlet length 4' (No Aprons) Add Yard Inlet Apron $ $ $ 6,035.22 5,742.84 292.39 EA EA THROAT Standard Yard Inlet (YI-3) 12"-48" Pipe (Invert depth (H)=0'-8') Add Yard Inlet With Apron Inlet Length 4' (No Aprons) Add Yard Inlet Apron $ $ $ 6,159.34 5,866.97 292.39 EA EA THROAT $ $ $ 485.90 532.05 671.90 LF LF LF $ $ $ 400.84 865.11 1,326.50 EA EA EA $ $ $ 4.08 3.53 2.68 SY SY SY $ $ $ 152.96 194.34 250.76 CY CY CY $ $ 74.48 32.60 SY SY $ $ $ 158.60 360.46 576.74 EA EA EA MISCELLANEOUS STORM Casing Pipe, Bore and Jack (3/8" wall) 22" ID (6"-8" carrier pipe) 24" ID (10" carrier pipe) 30" ID (12" carrier pipe) Connection to Existing Structure 6"-12" Pipe 15"-36" Pipe 42"-60" Pipe Filter Fabric Class I Class II Class III Gabions (No excavation) Mattress Revetment Wall Paved Ditch - 4" Thick Concrete (Non-reinforced) Bituminous concrete Plug Pipe 6"-12" pipe 15"-36" Pipe 42"-60" pipe Page 20 of 44 COUNTY OF FAIRFAX, VIRGINIA DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES LAND DEVELOPMENT SERVICES 2016 COMPREHENSIVE UNIT PRICE SCHEDULE EFFECTIVE FEBRUARY 1, 2016 ENGLISH UNIT PRICE CATEGORY UNIT Remove Old Pipe, New Pipe in Same Trench, Restore Trench (0'-10') 6"-12" pipe (RCP) 15"-36" Pipe (RCP) 42"-60" pipe (RCP) $ $ $ 55.17 140.42 250.76 LF LF LF Remove Pipe and Restore Trench (0'-10') 6"-12" pipe 15"-36" Pipe 42"-60" pipe $ $ $ 43.89 55.17 100.30 LF LF LF Remove Pipe, Relay Existing Pipe in Another Trench, Restore Both Trenches (0'-10') 6"-12" pipe 15"-36" Pipe 42"-60" pipe $ $ $ 96.55 140.42 250.76 LF LF LF $ $ $ $ 56.27 60.18 67.53 82.75 SY SY SY SY Pre-stressed Conc (12") Remove piles: Steel H Piles Timber Sheet Steel (10") (H Section) Treated Timber (12") Untreated Timber (12") $ 30.09 LF $ $ $ $ $ $ 19.11 12.54 45.14 41.38 21.32 17.55 LF LF SF LF LF LF Sodded Ditch Including Fine Grading $ 11.29 SY Rip rap Dry, Class I, 18" Dry, Class II, 18" Dry, Class III, 18" Grouted, Class I, 18" Shoring and piles (No mobilization) Sodded Ditch Page 21 of 44 COUNTY OF FAIRFAX, VIRGINIA DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES LAND DEVELOPMENT SERVICES 2016 COMPREHENSIVE UNIT PRICE SCHEDULE EFFECTIVE FEBRUARY 1, 2016 ENGLISH UNIT PRICE CATEGORY UNIT RCP, CLASS III ROUND T&G with MASTIC 12" Pipe 0'-8' Cut without "O" Ring 0'-8' Cut with "O" Ring 0'-8' Cut; Class IV without O Ring 0'-8' Cut; Class IV with O Ring 0'-8' Cut; Class V without O Ring 0'-8' Cut; Class V with O Ring 8'-14' Cut; without "O" Ring 8'-14' Cut with "O" Ring 8'-14' Cut; Class IV without O Ring 8'-14' Cut; Class IV with O Ring 8'-14' Cut; Class V without O Ring 8'-14' Cut; Class V with O Ring $ $ $ $ $ $ $ $ $ $ $ $ 43.87 50.15 44.50 50.78 45.13 51.41 65.20 71.47 65.82 72.10 66.45 72.73 LF LF LF LF LF LF LF LF LF LF LF LF 0'-10' Cut without "O" Ring 0'-10' Cut with "O" Ring 0'-10' Cut; Class IV without O Ring 0'-10' Cut; Class IV with O Ring 0'-10' Cut; Class V without O Ring 0'-10' Cut; Class V with O Ring 10'-16' Cut; Class IV without O Ring 10'-16' Cut; Class IV with O Ring $ $ $ $ $ $ $ $ $ $ 50.15 56.42 51.02 57.30 51.41 57.68 82.75 89.03 83.62 89.90 LF LF LF LF LF LF LF LF LF LF 10'-16' Cut; Class V without O Ring $ 84.01 LF 10'-16' Cut; Class V with O Ring $ 90.29 LF 0'-10' Cut without "O" Ring 10'-16' Cut; Class IV without O Ring 10'-16' Cut; Class IV with O Ring $ $ $ $ $ $ $ $ $ $ 60.18 68.08 62.50 70.40 65.07 72.97 96.55 104.45 98.86 106.76 LF LF LF LF LF LF LF LF LF LF 10'-16' Cut; Class V without O Ring $ 101.43 LF 10'-16' Cut; Class V with O Ring $ 109.33 LF 15" Pipe 10'-16' Cut without "O" Ring 10'-16' Cut with "O" Ring 18" Pipe 0'-10' Cut with "O" Ring 0'-10' Cut; Class IV without O Ring 0'-10' Cut; Class IV with O Ring 0'-10' Cut; Class V without O Ring 0'-10' Cut; Class V with O Ring 10'-16' Cut without "O" Ring 10'-16' Cut with "O" Ring Page 22 of 44 COUNTY OF FAIRFAX, VIRGINIA DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES LAND DEVELOPMENT SERVICES 2016 COMPREHENSIVE UNIT PRICE SCHEDULE EFFECTIVE FEBRUARY 1, 2016 ENGLISH UNIT PRICE CATEGORY UNIT 21" Pipe 0'-10' Cut without "O" Ring $ 70.21 LF 0'-10' Cut with "O" Ring 0'-10' Cut; Class IV without O Ring 0'-10' Cut; Class IV with O Ring 0'-10' Cut; Class V without O Ring 0'-10' Cut; Class V with O Ring 10'-16' Cut without "O" Ring 10'-16' Cut with "O" Ring 10'-16' Cut; Class IV without O Ring 10'-16' Cut; Class IV with O Ring 10'-16' Cut; Class V without O Ring 10'-16' Cut; Class V with O Ring $ $ $ $ $ $ $ $ $ $ $ 85.26 73.53 88.57 75.54 90.58 107.83 122.87 111.13 126.18 113.14 128.19 LF LF LF LF LF LF LF LF LF LF LF 0'-10' Cut without "O" Ring 0'-10' Cut with "O" Ring 0'-10' Cut; Class IV without O Ring 0'-10' Cut; Class IV with O Ring 0'-10' Cut; Class V without O Ring 0'-10' Cut; Class V with O Ring 10'-16' Cut without "O" Ring 10'-16' Cut with "O" Ring 10'-16' Cut; Class IV without O Ring 10'-16' Cut; Class IV with O Ring 10'-16' Cut; Class V without O Ring 10'-16' Cut; Class V with O Ring $ $ $ $ $ $ $ $ $ $ $ $ 81.49 97.80 85.35 101.65 89.32 105.62 115.34 131.65 119.21 135.51 123.18 139.48 LF LF LF LF LF LF LF LF LF LF LF LF 0'-10' Cut without "O" Ring 0'-10' Cut with "O" Ring 0'-10' Cut; Class IV without O Ring 0'-10' Cut; Class IV with O Ring 0'-10' Cut; Class V without O Ring 0'-10' Cut; Class V with O Ring 10'-16' Cut without "O" Ring 10'-16' Cut with "O" Ring 10'-16' Cut; Class IV without O Ring 10'-16' Cut; Class IV with O Ring 10'-16' Cut; Class V without O Ring 10'-16' Cut; Class V with O Ring $ $ $ $ $ $ $ $ $ $ $ $ 71.47 89.03 76.23 93.79 91.14 108.69 106.58 124.13 111.34 128.90 126.24 143.79 LF LF LF LF LF LF LF LF LF LF LF LF 0'-10' Cut without "O" Ring 0'-10' Cut with "O" Ring 0'-10' Cut; Class IV without O Ring 0'-10' Cut; Class IV with O Ring 0'-10' Cut; Class V without O Ring 0'-10' Cut; Class V with O Ring 10'-16' Cut without "O" Ring 10'-16' Cut with "O" Ring 10'-16' Cut; Class IV without O Ring 10'-16' Cut; Class IV with O Ring 10'-16' Cut; Class V without O Ring 10'-16' Cut; Class V with O Ring $ $ $ $ $ $ $ $ $ $ $ $ 97.80 117.85 105.02 125.08 115.65 135.72 146.70 166.76 153.80 173.97 165.56 184.61 LF LF LF LF LF LF LF LF LF LF LF LF 24" Pipe 27" Pipe 30" Pipe Page 23 of 44 COUNTY OF FAIRFAX, VIRGINIA DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES LAND DEVELOPMENT SERVICES 2016 COMPREHENSIVE UNIT PRICE SCHEDULE EFFECTIVE FEBRUARY 1, 2016 ENGLISH UNIT PRICE CATEGORY UNIT 33" Pipe 0'-12' Cut; without "O" Ring 0'-12' Cut; with "O" Ring 0'-12' Cut; Class IV without O Ring 0'-12' Cut; Class IV with O Ring 0'-12' Cut; Class V without O Ring 0'-12' Cut; Class V with O Ring 12'-18' Cut; without "O" Ring 12'-18' Cut with "O" Ring 12'-18' Cut; Class IV without O Ring 12'-18' Cut; Class IV with O Ring 12'-18' Cut; Class V without O Ring 12'-18' Cut; Class V with O Ring $ $ $ $ $ $ $ $ $ $ $ $ 129.14 154.22 136.47 161.53 149.60 174.68 193.08 218.16 200.40 225.48 213.54 238.62 LF LF LF LF LF LF LF LF LF LF LF LF 0'-12' Cut; without "O" Ring 0'-12' Cut; with "O" Ring 0'-12' Cut; Class IV without O Ring 0'-12' Cut; Class IV with O Ring 0'-12' Cut; Class V without O Ring 0'-12' Cut; Class V with O Ring 12'-18' Cut; without "O" Ring 12'-18' Cut with "O" Ring 12'-18' Cut; Class IV without O Ring 12'-18' Cut; Class IV with O Ring 12'-18' Cut; Class V without O Ring 12'-18' Cut; Class V with O Ring $ $ $ $ $ $ $ $ $ $ $ $ 137.91 164.25 147.35 173.68 162.52 188.85 206.87 233.20 216.30 242.63 231.47 257.80 LF LF LF LF LF LF LF LF LF LF LF LF 0'-12' Cut; without "O" Ring 0'-12' Cut; with "O" Ring 0'-12' Cut; Class IV without O Ring 0'-12' Cut; Class IV with O Ring 0'-12' Cut; Class V without O Ring 0'-12' Cut; Class V with O Ring 12'-18' Cut; without "O" Ring 12'-18' Cut with "O" Ring 12'-18' Cut; Class IV without O Ring 12'-18' Cut; Class IV with O Ring 12'-18' Cut; Class V without O Ring 12'-18' Cut; Class V with O Ring $ $ $ $ $ $ $ $ $ $ $ $ 162.99 204.37 177.79 219.17 196.65 238.02 245.74 287.12 260.54 301.91 279.40 320.77 LF LF LF LF LF LF LF LF LF LF LF LF 0'-12' Cut; without "O" Ring 0'-12' Cut; with "O" Ring 0'-12' Cut; Class IV without O Ring 0'-12' Cut; Class IV with O Ring 0'-12' Cut; Class V without O Ring 0'-12' Cut; Class V with O Ring 12'-18' Cut; without "O" Ring 12'-18' Cut with "O" Ring 12'-18' Cut; Class IV without O Ring 12'-18' Cut; Class IV with O Ring 12'-18' Cut; Class V without O Ring 12'-18' Cut; Class V with O Ring $ $ $ $ $ $ $ $ $ $ $ $ 184.32 235.10 198.71 249.51 220.48 271.28 263.31 314.10 277.71 328.51 299.47 350.26 LF LF LF LF LF LF LF LF LF LF LF LF 36" Pipe 42" Pipe 48" Pipe Page 24 of 44 COUNTY OF FAIRFAX, VIRGINIA DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES LAND DEVELOPMENT SERVICES 2016 COMPREHENSIVE UNIT PRICE SCHEDULE EFFECTIVE FEBRUARY 1, 2016 ENGLISH UNIT PRICE CATEGORY UNIT 54" Pipe 0'-12' Cut; without "O" Ring 0'-12' Cut; with "O" Ring 0'-12' Cut; Class IV without O Ring 0'-12' Cut; Class IV with O Ring 0'-12' Cut; Class V without O Ring 0'-12' Cut; Class V with O Ring 12'-18' Cut; without "O" Ring 12'-18' Cut with "O" Ring 12'-18' Cut; Class IV without O Ring 12'-18' Cut; Class IV with O Ring 12'-18' Cut; Class V without O Ring 12'-18' Cut; Class V with O Ring $ $ $ $ $ $ $ $ $ $ $ $ 225.68 277.09 248.95 300.37 278.29 329.71 332.25 383.66 355.52 406.92 384.86 436.27 LF LF LF LF LF LF LF LF LF LF LF LF 0'-12' Cut; without "O" Ring 0'-12' Cut; with "O" Ring 0'-12' Cut; Class IV without O Ring 0'-12' Cut; Class IV with O Ring 0'-12' Cut; Class V without O Ring 0'-12' Cut; Class V with O Ring 12'-18' Cut; without "O" Ring 12'-18' Cut with "O" Ring 12'-18' Cut; Class IV without O Ring 12'-18' Cut; Class IV with O Ring 12'-18' Cut; Class V without O Ring 12'-18' Cut; Class V with O Ring $ $ $ $ $ $ $ $ $ $ $ $ 270.81 327.25 296.64 353.07 332.00 388.42 406.23 462.65 432.05 488.47 467.40 523.84 LF LF LF LF LF LF LF LF LF LF LF LF 0'-12' Cut; without "O" Ring 0'-12' Cut; with "O" Ring 0'-12' Cut; Class IV without O Ring 0'-12' Cut; Class IV with O Ring 0'-12' Cut; Class V without O Ring 0'-12' Cut; Class V with O Ring 12'-18' Cut; without "O" Ring 12'-18' Cut with "O" Ring 12'-18' Cut; Class IV without O Ring 12'-18' Cut; Class IV with O Ring 12'-18' Cut; Class V without O Ring 12'-18' Cut; Class V with O Ring $ $ $ $ $ $ $ $ $ $ $ $ 303.41 361.09 339.32 397.00 381.05 438.72 455.13 512.80 491.03 548.72 532.76 590.43 LF LF LF LF LF LF LF LF LF LF LF LF 0'-14' Cut; without "O" Ring 0'-14' Cut with "O" Ring 0'-14' Cut Class IV without "O" Ring 0'-14' Cut; Class IV with O Ring 0'-14' Cut; Class V without "O" Ring 0 '-14' Cut; Class V with O Ring 14'-20' Cut; Without "O" Ring 14'-20' Cut with "O" Ring 14'-20' Cut; Class IV without "O" Ring 14'-20' Cut; Class IV with O Ring 14'-20' Cut; Class V without "O" Ring 14'-20' Cut; Class V with O Ring $ $ $ $ $ $ $ $ $ $ $ $ 339.77 403.72 386.96 450.91 429.64 493.60 509.03 572.98 556.23 620.18 598.91 662.85 LF LF LF LF LF LF LF LF LF LF LF LF 60" Pipe 66" Pipe 72" Pipe Page 25 of 44 COUNTY OF FAIRFAX, VIRGINIA DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES LAND DEVELOPMENT SERVICES 2016 COMPREHENSIVE UNIT PRICE SCHEDULE EFFECTIVE FEBRUARY 1, 2016 ENGLISH UNIT PRICE CATEGORY UNIT 84" Pipe 0'-14' Cut; without "O" Ring 0'-14' Cut with "O" Ring 0'-14' Cut Class IV without "O" Ring 0'-14' Cut; Class IV with O Ring 0'-14' Cut; Class V without "O" Ring 0 '-14' Cut; Class V with O Ring 14'-20' Cut; Without "O" Ring 14'-20' Cut with "O" Ring 14'-20' Cut; Class IV without "O" Ring 14'-20' Cut; Class IV with O Ring 14'-20' Cut; Class V without "O" Ring 14'-20' Cut; Class V with O Ring $ $ $ $ $ $ $ $ $ $ $ $ 450.11 550.42 512.63 612.94 561.71 662.00 674.53 774.84 737.05 837.36 786.13 886.42 LF LF LF LF LF LF LF LF LF LF LF LF 0'-14' Cut; without "O" Ring 0'-14' Cut with "O" Ring 0'-14' Cut Class IV without "O" Ring 0'-14' Cut; Class IV with O Ring 0'-14' Cut; Class V without "O" Ring 0 '-14' Cut; Class V with O Ring 14'-20' Cut; Without "O" Ring 14'-20' Cut with "O" Ring 14'-20' Cut; Class IV without "O" Ring 14'-20' Cut; Class IV with O Ring 14'-20' Cut; Class V without "O" Ring 14'-20' Cut; Class V with O Ring $ $ $ $ $ $ $ $ $ $ $ $ 532.86 668.27 608.09 743.49 673.28 808.69 752.27 887.67 827.49 962.90 892.69 1,028.09 LF LF LF LF LF LF LF LF LF LF LF LF 0'-14' Cut; without "O" Ring 0'-14' Cut with "O" Ring 0'-14' Cut Class IV without "O" Ring 0'-14' Cut; Class IV with O Ring 0'-14' Cut; Class V without "O" Ring 0 '-14' Cut; Class V with O Ring 14'-20' Cut; Without "O" Ring 14'-20' Cut with "O" Ring 14'-20' Cut; Class IV without "O" Ring 14'-20' Cut; Class IV with O Ring 14'-20' Cut; Class V without "O" Ring 14'-20' Cut; Class V with O Ring Extra Strength Concrete 8" Pipe 0'-8' Cut 8'-14' Cut Extra Strength Concrete 10" Pipe 0'-8' Cut 8'-14' Cut $ $ $ $ $ $ $ $ $ $ $ $ 651.96 807.43 748.51 903.98 818.72 974.19 866.37 1,021.84 962.91 1,118.38 1,033.12 1,188.59 LF LF LF LF LF LF LF LF LF LF LF LF $ $ 36.37 53.91 LF LF $ $ 41.39 61.44 LF LF 96" Pipe 108" Pipe Page 26 of 44 COUNTY OF FAIRFAX, VIRGINIA DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES LAND DEVELOPMENT SERVICES 2016 COMPREHENSIVE UNIT PRICE SCHEDULE EFFECTIVE FEBRUARY 1, 2016 ENGLISH UNIT PRICE CATEGORY UNIT ROUND PIPE - CMP CMP Plain 12 GA. 36" Pipe 0'-12' Cut 0'-12' Cut; Coated Paved Invert 12'-18' Cut 12'-18' Cut; Coated Paved Invert $ $ $ $ 104.07 119.11 155.47 170.52 LF LF LF LF 0'-12' Cut 0'-12' Cut; Coated Paved Invert 12'-18' Cut 12'-18' Cut; Coated Paved Invert $ $ $ $ 111.59 129.14 166.76 184.32 LF LF LF LF 0'-12' Cut 0'-12' Cut; Coated Paved Invert 12'-18' Cut 12'-18' Cut; Coated Paved Invert $ $ $ $ 120.36 140.42 180.55 200.60 LF LF LF LF 0'-12' Cut 0'-12' Cut; Coated Paved Invert 12'-18' Cut 12'-18' Cut; Coated Paved Invert $ $ $ $ 132.90 152.96 199.35 219.42 LF LF LF LF 0'-12' Cut 0'-12' Cut; Coated Paved Invert 12'-18' Cut 12'-18' Cut; Coated Paved Invert $ $ $ $ 150.45 175.53 225.68 250.76 LF LF LF LF 0'-14' Cut 0'-14' Cut; Coated Paved Invert 14'-20' Cut 14'-20' Cut; Coated Paved Invert $ $ $ $ 342.29 373.64 433.80 465.16 LF LF LF LF 0'-14' Cut 0'-14' Cut; Coated Paved Invert 14'-20' Cut 14'-20' Cut; Coated Paved Invert $ $ $ $ 411.24 448.85 601.81 639.43 LF LF LF LF 0'-14' Cut 0'-14' Cut; Coated Paved Invert 14'-20' Cut 14'-20' Cut; Coated Paved Invert $ $ $ $ 448.85 492.75 537.88 581.76 LF LF LF LF 0'-14' Cut 0'-14' Cut; Coated Paved Invert 14'-20' Cut 14'-20' Cut; Coated Paved Invert $ $ $ $ 526.59 576.73 626.89 677.04 LF LF LF LF 42" Pipe 48" Pipe 54" Pipe 60" Pipe 72" Pipe 84" Pipe 96" Pipe 108" Pipe Page 27 of 44 COUNTY OF FAIRFAX, VIRGINIA DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES LAND DEVELOPMENT SERVICES 2016 COMPREHENSIVE UNIT PRICE SCHEDULE EFFECTIVE FEBRUARY 1, 2016 ENGLISH UNIT PRICE CATEGORY UNIT CMP Plain 14 GA. 24" Pipe 0'-10' Cut 0'-10' Cut; Coated Paved Invert 10'-16' Cut 10'-16' Cut; Coated Paved Invert $ $ $ $ 56.42 67.71 91.53 102.82 LF LF LF LF 0'-10' Cut 0'-10' Cut; Coated Paved Invert 10'-16' Cut 10'-16' Cut; Coated Paved Invert $ $ $ $ 66.45 78.99 101.57 114.11 LF LF LF LF 0'-8' Cut 8'-14' Cut $ $ 24.95 50.62 LF LF 0'-8' Cut 0'-8' Cut; Coated Invert 8'-14' Cut 8'-14' Cut; Coated Invert $ $ $ $ 28.08 31.85 53.78 57.55 LF LF LF LF 0'-8' Cut 0'-8' Cut; Coated Invert 8'-14' Cut 8'-14' Cut; Coated Invert $ $ $ $ 33.60 39.87 60.01 66.29 LF LF LF LF 0'-10' Cut 0'-10' Cut; Coated Paved Invert 10'-16' Cut 10'-16' Cut; Coated Paved Invert $ $ $ $ 36.10 43.63 77.73 85.26 LF LF LF LF 0'-10' Cut 0'-10' Cut; Coated Paved Invert 10'-16' Cut 10'-16' Cut; Coated Paved Invert $ $ $ $ 46.40 55.17 82.75 91.53 LF LF LF LF 0'-10' Cut 0'-10' Cut; Coated Paved Invert 10'-16' Cut 10'-16' Cut; Coated Paved Invert $ $ $ $ 50.15 60.18 87.76 97.80 LF LF LF LF $ $ 125.38 100.30 CY CY $ $ 156.73 125.38 CY CY $ $ $ 17.55 30.09 3.13 LF LF LF 30" Pipe CMP Plain 16 GA. 6" Pipe 8" Pipe 12" Pipe 15" Pipe 18" Pipe 21" Pipe Storm Sewer Rock Excavation - in trenches: Blast - All Pipes less than 1,500 CY greater than 1,500cy Hoe ram - All Pipes less than 1,500cy greater than 1,500cy Select Backfill 0'-5' Deep (3"-12" pipe) 0'-6' Deep (12"-24" pipe) Trench De-watering Page 28 of 44 COUNTY OF FAIRFAX, VIRGINIA DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES LAND DEVELOPMENT SERVICES 2016 COMPREHENSIVE UNIT PRICE SCHEDULE EFFECTIVE FEBRUARY 1, 2016 ENGLISH UNIT PRICE CATEGORY UNIT Utilities MISCELLANEOUS SEWER Air Relief Valve (No manhole) 1-1/4" Valve 1-1/2" Valve 2" Valve 2-1/2" Valve 3" Valve 4" Valve 6" Valve Casing Pipe, Bore and Jack (3/8" wall thickness) 22" ID (8" carrier pipe) 24" ID (10" carrier pipe) 30" ID (12" carrier pipe) Class B concrete for unsuitable foundation material Foundation material A3 Foundation material A4 Concrete Pier for Storm Drainage Crossing Sanitary Sewer 6" Pipe 15" Pipe 27" Pipe Connection to Existing Manhole 8" core bore Force Main Pipe Size 4" 6" 8" 10" 12" 14" 16" Internal Drop Connection to Manhole 8" Pipe PVC Lateral Spur, with clean out and connection to new main 4" diameter, greater than 10' deep Connect to existing main with clean out Page 29 of 44 $ $ $ $ $ $ $ 315.95 406.22 586.77 881.41 1,115.86 1,499.53 3,303.73 EA EA EA EA EA EA EA $ $ $ 501.51 584.26 702.12 LF LF LF $ $ 940.34 626.89 CY CY $ $ $ 137.92 191.71 321.34 EA EA EA $ 1,253.78 EA $ $ $ $ $ $ $ 27.33 34.11 41.22 45.37 54.29 73.98 88.51 LF LF LF LF LF LF LF $ 752.27 EA $ $ 55.17 1,880.68 VF EA COUNTY OF FAIRFAX, VIRGINIA DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES LAND DEVELOPMENT SERVICES 2016 COMPREHENSIVE UNIT PRICE SCHEDULE EFFECTIVE FEBRUARY 1, 2016 ENGLISH UNIT PRICE CATEGORY Standard Concrete Encasement 8" Pipe 10" Pipe 12" Pipe 15" Pipe 18" Pipe 21" Pipe Standard External Drop Connection To Manhole, CI; Inc. Bend - 2 Ea Wye - 1 Ea Extra Core 8" Pipe 10" Pipe 12" Pipe 15" Pipe Temporary Pump Around 8" Line Each Location Tunnel: Liner Plate (8 Gauge) 48" OD (15"-18" carrier pipe) 54" OD (21"-24" carrier pipe) 60" OD (27"-30" carrier pipe) 66" OD (33"-36" carrier pipe) 72" OD (42" carrier pipe) 78" OD (48" carrier pipe) 84" OD (54" carrier pipe) UNIT $ $ $ $ $ $ 53.92 61.44 66.46 76.49 85.26 95.29 LF LF LF LF LF LF $ $ $ $ 702.12 952.87 1,115.86 1,755.30 EA EA EA EA $ 12,537.86 Months $ $ $ $ $ $ $ 1,020.58 1,189.84 1,517.09 1,765.33 2,013.58 2,268.09 2,530.14 LF LF LF LF LF LF LF Drywell Type, 8' ID with standby generator and 8 foot diameter wetwell Concrete Fiberglass Steel $ $ $ 608,086.07 608,086.07 608,086.07 LS LS LS Wetwell Type with stand by generator Duplex Grinder Pump in 4 foot diameter wetwell Simplex Grinder Pump in 4 foot diameter wetwell Submersible Pumps in 6 foot diameter wetwell $ $ $ 36,986.68 31,344.64 290,878.28 LS LS LS PUMPING STATION SEWER Page 30 of 44 COUNTY OF FAIRFAX, VIRGINIA DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES LAND DEVELOPMENT SERVICES 2016 COMPREHENSIVE UNIT PRICE SCHEDULE EFFECTIVE FEBRUARY 1, 2016 ENGLISH UNIT PRICE CATEGORY UNIT RCP, CLASS III ROUND (WITH MODS FOR OTHER CLASSES) 12" Pipe 0'-8' Cut including O Ring 0'-8' Cut; Class IV W/O Ring 0'-8' Cut: Class V W/O Ring 8'-14' Cut including O Ring 8'-14' Cut; Class IV W/O Ring 8'-14' Cut; Class V W/O Ring $ $ $ $ $ $ 56.43 57.05 57.68 77.73 78.35 78.99 LF LF lf LF LF LF 0'-10' Cut including O Ring 0'-10' Cut; Class IV W/O Ring 0'-10' Cut; Class V W/O Ring 10'-16' Cut; including O Ring 10'-16' Cut; Class IV W/O Ring 10'-16' Cut; Class V W/O Ring $ $ $ $ $ $ 60.18 61.05 61.44 87.77 88.64 89.03 LF LF l LF LF LF 0'-10' Cut including O Ring 0'-10' Cut; Class IV W/O Ring 0'-10' Cut; Class V W/O Ring 10'-16' Cut; including O Ring 10'-16' Cut; Class IV W/O Ring 10'-16' Cut; Class V W/O Ring $ $ $ $ $ $ 68.08 70.40 72.97 108.19 110.51 113.09 LF LF LF LF LF LF 0'-10' Cut including O Ring 0'-10' Cut; Class IV W/O Ring 0'-10' Cut; Class V W/O Ring 10'-16' Cut; including O Ring 10'-16' Cut; Class IV W/O Ring 10'-16' Cut; Class V W/O Ring $ $ $ $ $ $ 87.76 91.08 93.09 135.41 138.72 140.73 LF LF LF LF LF LF 0'-10' Cut including O Ring 0'-10' Cut; Class IV W/O Ring 0'-10' Cut; Class V W/O Ring 10'-16' Cut; including O Ring 10'-16' Cut; Class IV W/O Ring 10'-16' Cut; Class V W/O Ring $ $ $ $ $ $ 95.29 99.15 103.11 144.19 148.04 152.02 LF LF LF LF LF LF 0'-10' Cut including O Ring 0'-10' Cut; Class IV W/O Ring 0'-10' Cut; Class V W/O Ring 10'-16' Cut; including O Ring 10'-16' Cut; Class IV W/O Ring 10'-16' Cut; Class V W/O Ring $ $ $ $ $ $ 101.56 106.33 121.22 156.73 161.49 176.39 LF LF LF LF LF LF 0'-10' Cut including O Ring 0'-10' Cut; Class IV W/O Ring 0'-10' Cut; Class V W/O Ring 10'-16' Cut; including O Ring 10'-16' Cut; Class IV W/O Ring 10'-16' Cut; Class V W/O Ring $ $ $ $ $ $ 130.39 137.60 148.25 195.59 202.81 213.45 LF LF LF LF LF LF 15" Pipe 18" Pipe 21" Pipe 24" Pipe 27" Pipe 30" Pipe Page 31 of 44 COUNTY OF FAIRFAX, VIRGINIA DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES LAND DEVELOPMENT SERVICES 2016 COMPREHENSIVE UNIT PRICE SCHEDULE EFFECTIVE FEBRUARY 1, 2016 ENGLISH UNIT PRICE CATEGORY UNIT 33" Pipe 0'-12' Cut including O Ring 0'-12' Cut; Class IV W/O Ring 0'-12' Cut; Class V W/O Ring 12'-18' Cut including O Ring 12'-18' Cut; Class IV W/O Ring 12'-18' Cut; Class V W/O Ring $ $ $ $ $ $ 179.30 186.61 199.75 255.78 263.09 276.23 LF LF LF LF LF LF 0'-12' Cut including O Ring 0'-12' Cut; Class IV W/O Ring 0'-12' Cut; Class V W/O Ring 12'-18' Cut including O Ring 12'-18' Cut; Class IV W/O Ring 12'-18' Cut; Class V W/O Ring $ $ $ $ $ $ 205.62 215.05 230.22 264.56 273.98 289.15 LF LF LF LF LF LF 0'-12' Cut including O Ring 0'-12' Cut; Class IV W/O Ring 0'-12' Cut; Class V W/O Ring 12'-18' Cut including O Ring 12'-18' Cut; Class IV W/O Ring 12'-18' Cut; Class V W/O Ring $ $ $ $ $ $ 229.45 244.24 263.10 310.94 325.73 344.59 LF LF LF LF LF LF 0'-12' Cut including O Ring 0'-12' Cut; Class IV W/O Ring 0'-12' Cut; Class V W/O Ring 12'-18' Cut including O Ring 12'-18' Cut; Class IV W/O Ring 12'-18' Cut; Class V W/O Ring $ $ $ $ $ $ 285.26 299.66 321.42 320.36 334.77 356.52 LF LF LF LF LF LF 0'-12' Cut including O Ring 0'-12' Cut; Class IV W/O Ring 0'-12' Cut; Class V W/O Ring 12'-18' Cut including O Ring 12'-18' Cut; Class IV W/O Ring 12'-18' Cut; Class V W/O Ring $ $ $ $ $ $ 302.17 325.43 354.78 383.88 406.92 436.27 LF LF LF LF LF LF 0'-12' Cut including O Ring 0'-12' Cut; Class IV W/O Ring 0'-12' Cut; Class V W/O Ring 12'-18' Cut including O Ring 12'-18' Cut; Class IV W/O Ring 12'-18' Cut; Class V W/O Ring $ $ $ $ $ $ 327.24 353.07 388.42 462.65 488.47 523.84 LF LF LF LF LF LF 0'-12' Cut including O Ring 0'-12' Cut; Class IV W/O Ring 0'-12' Cut; Class V W/O Ring 12'-18' Cut including O Ring 12'-18' Cut; Class IV W/O Ring 12'-18' Cut; Class V W/O Ring $ $ $ $ $ $ 361.09 397.56 438.72 512.80 548.72 590.43 LF LF LF LF LF LF 0'-14' Cut including O Ring 0'-14' Cut; Class IV Upgrade W/O Ring 0'-14' Cut; Class V Upgrade W/O Ring 14'-20' Cut; including O Ring 14'-20' Cut; Class IV Upgrade W/O Ring 14'-20' Cut; Class V Upgrade WO Ring $ $ $ $ $ $ 403.72 450.91 493.60 572.98 620.18 662.85 LF LF LF LF LF LF 36" Pipe 42" Pipe 48" Pipe 54" Pipe 60" Pipe 66" Pipe 72" Pipe Page 32 of 44 COUNTY OF FAIRFAX, VIRGINIA DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES LAND DEVELOPMENT SERVICES 2016 COMPREHENSIVE UNIT PRICE SCHEDULE EFFECTIVE FEBRUARY 1, 2016 ENGLISH UNIT PRICE CATEGORY UNIT 84" Pipe 0'-14' Cut including O Ring 0'-14' Cut; Class IV Upgrade W/O Ring 0'-14' Cut; Class V Upgrade W/O Ring 14'-20' Cut; including O Ring 14'-20' Cut; Class IV Upgrade W/O Ring 14'-20' Cut; Class V Upgrade WO Ring $ $ $ $ $ $ 550.42 612.94 662.00 774.84 837.36 886.42 LF LF LF LF LF LF 0'-14' Cut including O Ring 0'-14' Cut; Class IV Upgrade W/O Ring 0'-14' Cut; Class V Upgrade W/O Ring 14'-20' Cut; including O Ring 14'-20' Cut; Class IV Upgrade W/O Ring 14'-20' Cut; Class V Upgrade WO Ring $ $ $ $ $ $ 668.27 743.49 808.69 887.67 962.90 1,028.09 LF LF LF LF LF LF 0'-14' Cut including O Ring 0'-14' Cut; Class IV Upgrade W/O Ring 0'-14' Cut; Class V Upgrade W/O Ring 14'-20' Cut; including O Ring 14'-20' Cut; Class IV Upgrade W/O Ring 14'-20' Cut; Class V Upgrade WO Ring $ $ $ $ $ $ 807.43 903.98 974.19 1,021.84 1,118.38 1,188.59 LF LF LF LF LF LF 96" Pipe 108" Pipe Page 33 of 44 COUNTY OF FAIRFAX, VIRGINIA DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES LAND DEVELOPMENT SERVICES 2016 COMPREHENSIVE UNIT PRICE SCHEDULE EFFECTIVE FEBRUARY 1, 2016 ENGLISH UNIT PRICE CATEGORY UNIT SANITARY SEWER Note: All pipe unit prices include trench excavation, bedding, pipe, and backfill DIP (CLASS 50) 30" Pipe 0'-10' Cut 0'-10' Cut; Class 51 Upgrade 0'-10' Cut; Class 52 Upgrade 0'-10' Cut; Class 53 Upgrade 10'-16' Cut 10'-16' Cut; Class 51 Upgrade 10'-16' Cut; Class 52 Upgrade 10'-16' Cut; Class 53 Upgrade $ $ $ $ $ $ $ $ 177.04 189.41 201.86 214.20 211.41 223.77 236.23 248.56 LF LF LF LF LF LF LF LF 0'-10' Cut 0'-10' Cut; Class 51 Upgrade 0'-10' Cut; Class 52 Upgrade 0'-10' Cut; Class 53 Upgrade 10'-16' Cut 10'-16' Cut; Class 51 Upgrade 10'-16' Cut; Class 52 Upgrade 10'-16' Cut; Class 53 Upgrade $ $ $ $ $ $ $ $ 233.20 250.22 267.81 288.81 266.30 283.32 300.91 321.91 LF LF LF LF LF LF LF LF 0'-10' Cut 0'-10' Cut; Class 51 Upgrade 0'-10' Cut; Class 52 Upgrade 0'-10' Cut; Class 53 Upgrade 10'-16' Cut 10'-16' Cut; Class 51 Upgrade 10'-16' Cut; Class 52 Upgrade 10'-16' Cut; Class 53 Upgrade $ $ $ $ $ $ $ $ 279.74 303.33 326.91 350.73 321.82 345.41 369.00 392.82 LF lf LF LF LF LF LF LF 0'-10' Cut 0'-10' Cut; Class 51 Upgrade 0'-10' Cut; Class 52 Upgrade 0'-10' Cut; Class 53 Upgrade 10'-16' Cut 10'-16' Cut; Class 51 Upgrade 10'-16' Cut; Class 52 Upgrade 10'-16' Cut; Class 53 Upgrade $ $ $ $ $ $ $ $ 341.53 377.22 412.69 446.37 383.66 419.34 454.82 488.49 LF LF LF LF LF LF LF LF 0'-10' Cut 0'-10' Cut; Class 51 Upgrade 0'-10' Cut; Class 52 Upgrade 0'-10' Cut; Class 53 Upgrade 10'-16' Cut 10'-16' Cut; Class 51 Upgrade 10'-16' Cut; Class 52 Upgrade 10'-16' Cut; Class 53 Upgrade $ $ $ $ $ $ $ $ 421.27 473.07 510.49 524.47 460.39 511.62 549.61 563.59 LF LF LF LF LF LF LF LF 36" Pipe 42" Pipe 48" Pipe 54" Pipe Page 34 of 44 COUNTY OF FAIRFAX, VIRGINIA DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES LAND DEVELOPMENT SERVICES 2016 COMPREHENSIVE UNIT PRICE SCHEDULE EFFECTIVE FEBRUARY 1, 2016 ENGLISH UNIT PRICE CATEGORY UNIT PVC PIPE 6" Pipe PVC with gravel 0'-8' Cut 0'-8' Cut With Dip Class 50 8'-14' Cut 8'-14' Cut With Dip Class 50 $ $ $ $ 24.80 46.60 56.95 78.74 LF LF LF LF 0'-8' Cut 0'-8' Cut With Dip Class 50 8'-14' Cut 8'-14' Cut With Dip Class 50 $ $ $ $ 43.89 73.56 86.52 116.18 LF LF LF LF 0'-8' Cut 0'-8' Cut With Dip Class 50 8'-14' Cut 8'-14' Cut With Dip Class 50 $ $ $ $ 47.64 71.46 87.76 111.59 LF LF LF LF 0'-8' Cut 0'-8' Cut With Dip Class 50 8'-14' Cut 8'-14' Cut With Dip Class 50 $ $ $ $ 56.43 189.25 119.11 251.95 LF LF LF LF 0'-10' Cut 0'-10' Cut With Dip Class 50 10'-16' Cut 10'-16' Cut With Dip Class 50 $ $ $ $ 78.99 130.41 119.11 170.54 LF LF LF LF 0'-10' Cut 0'-10' Cut With Dip Class 50 10'-16' Cut 10'-16' Cut With Dip Class 50 $ $ $ $ 82.75 143.66 131.65 192.56 LF LF LF LF 0'-10' Cut 0'-10' Cut With Dip Class 50 10'-16' Cut 10'-16' Cut With Dip Class 50 $ $ $ $ 112.84 167.53 155.47 210.16 LF LF LF LF 0'-10' Cut 0'-10' Cut With Dip Class 50 10'-16' Cut 10'-16' Cut With Dip Class 50 $ $ $ $ 122.87 195.51 165.50 238.14 LF LF LF LF 0'-10' Cut 0'-10' Cut With Dip Class 50 10'-16' Cut 10'-16' Cut With Dip Class 50 $ $ $ $ 132.90 208.12 188.07 263.30 LF LF LF LF 8" Pipe PVC 10" Pipe PVC 12" Pipe PVC 15" Pipe PVC 18" Pipe PVC 21" Pipe PVC 24" Pipe PVC 27" Pipe PVC Page 35 of 44 COUNTY OF FAIRFAX, VIRGINIA DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES LAND DEVELOPMENT SERVICES 2016 COMPREHENSIVE UNIT PRICE SCHEDULE EFFECTIVE FEBRUARY 1, 2016 ENGLISH UNIT PRICE CATEGORY Rock Excavation - in trenches: Blast - All Pipes less than 1,500 CY greater than 1,500cy Hoe ram - All Pipes less than 1,500cy greater than 1,500cy Select Backfill 0'-5' Deep (3"-12" pipe) 0'-6' Deep (12"-24" pipe) Trench De-watering SANITARY SEWER STRUCTURES Heavy duty frame and cover Manhole vent: 4" diameter, 6' high Standard Precast Manhole Frame and Cover 03 FT ID Dept (Vertical Separation of Top and Bottom) Standard Manhole (Base, Top) With Heavy Duty Frame and Cover With Watertight Frame and Cover 04 FT ID Dept (Vertical Separation of Top and Bottom) Standard Manhole (Base, Top) With Heavy Duty Frame and Cover With Watertight Frame and Cover 05 FT ID Dept (Vertical Separation of Top and Bottom) Standard Manhole (Base, Top) With Heavy Duty Frame and Cover With Watertight Frame and Cover 06 FT ID Dept (Vertical Separation of Top and Bottom) Standard Manhole (Base, Top) With Heavy Duty Frame and Cover With Watertight Frame and Cover 07 FT ID Dept (Vertical Separation of Top and Bottom) Standard Manhole (Base, Top) With Heavy Duty Frame and Cover With Watertight Frame and Cover 08 FT ID Dept (Vertical Separation of Top and Bottom) Standard Manhole (Base, Top) With Heavy Duty Frame and Cover With Watertight Frame and Cover 09 FT ID Dept (Vertical Separation of Top and Bottom) Standard Manhole (Base, Top) With Heavy Duty Frame and Cover With Watertight Frame and Cover 10 FT ID Dept (Vertical Separation of Top and Bottom) Standard Manhole (Base, Top) With Heavy Duty Frame and Cover With Watertight Frame and Cover Watertight frame and cover Page 36 of 44 UNIT $ $ 125.38 100.30 CY CY $ $ 156.73 125.38 CY CY $ $ $ 17.55 30.09 3.13 LF LF LF $ $ 677.04 739.73 EA EA $ $ $ $ 178.04 877.65 1,554.69 1,454.39 VF EA EA EA $ $ $ $ 206.88 1,128.40 1,805.44 1,705.15 VF EA EA EA $ $ $ $ 349.81 1,379.16 2,056.20 1,955.89 VF EA EA EA $ $ $ $ 478.95 1,692.61 2,369.65 2,269.34 VF EA EA EA $ $ $ $ 725.94 2,432.33 3,109.37 3,009.07 VF EA EA EA $ $ $ $ 1,038.13 3,836.60 4,513.64 4,413.33 VF EA EA EA $ $ $ $ 1,100.82 4,262.88 4,939.92 4,839.61 VF EA EA EA $ $ $ $ $ 1,278.85 5,328.59 6,005.63 5,905.32 576.74 VF EA EA EA EA COUNTY OF FAIRFAX, VIRGINIA DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES LAND DEVELOPMENT SERVICES 2016 COMPREHENSIVE UNIT PRICE SCHEDULE EFFECTIVE FEBRUARY 1, 2016 ENGLISH UNIT PRICE CATEGORY UNIT WATER SYSTEM NOTE: All unit prices include trenching, pipe, bedding, and backfill Ductile Iron Pipe Select Backfill 0'-5' Deep (3"-12" pipe) 0'-6' Deep (12"-24" pipe) $ $ 17.55 30.09 LF LF $ $ 125.38 100.30 CY CY $ $ 156.73 125.38 CY CY $ 3.13 LF $ $ $ $ $ $ $ $ $ $ $ 60.56 65.75 90.27 101.56 115.35 137.92 164.25 183.05 219.42 288.37 374.89 LF LF LF LF LF LF LF LF LF LF LF 01" Service Connection (Incl Corp. Stop, Tubing, Meter) $ 672.03 EA Casing pipe Casing pipe, bore and jack (3/8" wall T) 16" ID 20" ID 22" ID 24" ID 30" ID Fire Hydrant Fire Hydrant Assembly (4) :with 20 LF 6" Dip $ $ $ $ $ 313.45 364.86 378.64 451.36 564.20 LF LF LF LF LF $ 4,463.48 EA $ 4,388.25 EA Rock Excavation - in trenches: Blast - All Pipes less than 1,500 CY greater than 1,500cy Hoe ram - All Pipes less than 1,500cy greater than 1,500cy Trench De-watering Water Lines (1) 3" DIP, Class 52 4" DIP, Class 52 6" DIP, Class 52 8" DIP, Class 52 10" DIP, Class 52 12" DIP, Class 52 14" DIP, Class 51 16" DIP, Class 51 18" DIP, Class 51 20" DIP, Class 51 24" DIP, Class 51 Water System MISCELLANEOUS Jack Pit Jack Pit Page 37 of 44 COUNTY OF FAIRFAX, VIRGINIA DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES LAND DEVELOPMENT SERVICES 2016 COMPREHENSIVE UNIT PRICE SCHEDULE EFFECTIVE FEBRUARY 1, 2016 ENGLISH UNIT PRICE CATEGORY Valve Assembly with valve box: 3" Ball 4" Gate 6" Gate 8" Gate 10" Gate 12" Gate 14" Butterfly 16" Butterfly 18" Butterfly 20" Butterfly 24" Butterfly Wet Tap of "Live" Line - Grass Area 6" Tap 6" Tap In Street Patch 8" Tap 8: Tap In Street Patch 10" Tap 10" Tap In Street Patch 12" Tap 12" Tap in Street Patch Page 38 of 44 UNIT $ $ $ $ $ $ $ $ $ $ $ 379.27 679.92 896.46 1,172.29 1,517.09 1,930.83 4,137.50 5,378.74 6,344.15 8,688.73 10,895.40 EA EA EA EA EA EA EA EA EA EA EA $ $ $ $ $ $ $ $ 3,199.66 3,871.68 3,499.32 4,171.34 3,891.75 4,563.77 5,102.91 5,774.93 EA EA EA EA EA EA EA EA COUNTY OF FAIRFAX, VIRGINIA DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES LAND DEVELOPMENT SERVICES 2016 COMPREHENSIVE UNIT PRICE SCHEDULE EFFECTIVE FEBRUARY 1, 2016 ENGLISH UNIT PRICE CATEGORY UNIT Street Construction Roads and Parking Bituminous Concrete, Base Course BM-25.0A 10 Inch Thick BM-25.0A 3 Inch Thick Per Square Yard and Less BM-25.0A 3.5 Inch Thick BM-25.0A 4 Inch Thick BM-25.0A 4.5 Inch Thick BM-25.0A 5 Inch Thick BM-25.0A 5.5 Inch Thick BM-25.0A 6 Inch Thick BM-25.0A 6.5 Inch Thick BM-25.0A 7 Inch Thick BM-25.0A 7.5 Inch Thick BM-25.0A 8 Inch Thick BM-25.0A 8.5 Inch Thick BM-25.0A 9 Inch Thick BM-25.0A 9.5 Inch Thick Bituminous Concrete Top Course IM-19.0A, 2 Inch Thick Per Sq Yd and Less IM-19.0A, 2.5 Inch Thick IM-19.0A, 3 Inch Thick IM-19.0A, 3.5 Inch Thick IM-19.0A, 4 Inch Thick IM-19.0A, 4.5 Inch Thick IM-19.0A, 5 Inch Thick IM-19.0A, 5.5 Inch Thick IM-19.0A, 6 Inch Thick SM (9.0A 9.5A 9.5D), 2 Inch Thick and Less SM (9.0A 9.5A 9.5D), 2.5 Inch Thick SM (9.0A 9.5A 9.5D), 3 Inch Thick SM (9.0A 9.5A 9.5D), 3.5 Inch Thick SM (9.0A 9.5A 9.5D), 4 Inch Thick SM (9.0A 9.5A 9.5D), 4.5 Inch Thick SM (9.0A 9.5A 9.5D), 5 Inch Thick SM (9.0A 9.5A 9.5D), 5.5 Inch Thick SM (9.0A 9.5A 9.5D), 6 Inch Thick Coat Prime Coat Tack Coat Concrete Curbing Concrete Curb & Gutter CG6&7 Concrete Curbs CG2&CG3 Curb Cut, CG-12 with exposed aggregate Street Intersection CG-10A Concrete Pavement Portland Cement, reinforced, 6" Gravel (Rebar #4, 12" OC/EW) 8" 9" Portland Cement, WWF, 6" Gravel 7" 8" 9" Page 39 of 44 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 56.80 22.57 25.01 27.45 29.91 32.35 34.79 37.24 39.68 42.13 44.58 47.02 49.46 51.92 54.36 SY SY SY SY SY SY SY SY SY SY SY SY SY SY SY $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 12.54 15.32 18.11 20.89 23.68 26.46 29.26 32.04 34.82 12.54 15.32 18.11 20.89 23.68 26.46 29.26 32.04 34.82 SY SY SY SY SY SY SY SY SY SY SY SY SY SY SY SY SY SY $ $ 1.26 1.26 SY SY $ $ $ $ 26.34 25.08 626.89 94.04 LF LF EA SY $ $ 165.50 175.53 SY SY $ $ $ 112.84 124.13 132.90 SY SY SY COUNTY OF FAIRFAX, VIRGINIA DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES LAND DEVELOPMENT SERVICES 2016 COMPREHENSIVE UNIT PRICE SCHEDULE EFFECTIVE FEBRUARY 1, 2016 ENGLISH UNIT PRICE CATEGORY UNIT Cover Material No. 8 No. 68 No. 78 Driveway Restoration 2" S-5 6" Gravel 4" concrete over 4" gravel Entrances/Driveways Commercial, CG-11 Commercial, CG-13 Entrance, CG-9 Standard driveway, C&G/Sidewalk 4 transition DE-1 Standard driveway, no curb, D-5 (DE-5) Guardrails Median Barrier, MB-3 (L=6'-3") Median Barrier, MB-3 (L=12'-6") Standard blocked-out W beam strong post, GR2 Standard W beam, Weak Post GR8 Terminal, GR-6 (L=12'-6") Terminal, GR-7 (L=6'-3") Terminal, MB-4 (L=37'-6') Type I, GR-8 Terminal (L=25') Type I, MB-5 Terminal (L=27'-1") Type II, GR-8 Terminal (L=13'-6") Type II, MB-5 Terminal (L=13'-6") $ $ $ 3.26 3.11 2.96 SY SY SY $ $ 37.61 94.97 SY SY $ $ $ $ $ 62.29 76.28 61.06 1,629.93 61.06 SY SY SY EA SY $ $ $ $ $ $ $ $ $ $ $ 329.75 545.40 50.15 32.60 3,447.91 3,134.46 4,137.50 1,629.93 3,447.91 787.37 1,880.68 EA EA LF LF EA EA EA EA EA EA EA Miscellaneous 6" Pipe at Edge of Pavement Complete CE-7 package Final Street Acceptance Package Initial Street Acceptance Package Pipe stem from C&G, PS-1 Pipe stem from ditch, PS-1 Sign island Slope erosion, Control MC-3A Straight Street lighting, including pole, bracket and light Street name signs TB-1 Barricade Traffic control signs $ $ $ $ $ $ $ $ $ $ $ $ 20.91 3,874.19 2,432.84 4,388.25 43.88 43.88 940.34 5.64 5,015.14 501.51 50.15 438.82 LF LS LS LS SY SY EA LF EA EA LF EA Shoulder Type I Aggregate Base, 4" $ 12.54 SY Soil Stabilization Cement (6" depth) 6% Lime (6" depth) 6% $ $ 18.81 12.54 SY SY $ $ 11.29 13.80 SY SY $ 3.77 SY Subbase, Aggregate Material Base, Type I, 6" Base, Type I, 8" Surface Treatment Double Seal Page 40 of 44 COUNTY OF FAIRFAX, VIRGINIA DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES LAND DEVELOPMENT SERVICES 2016 COMPREHENSIVE UNIT PRICE SCHEDULE EFFECTIVE FEBRUARY 1, 2016 ENGLISH UNIT PRICE CATEGORY UNIT SIDEWALKS AND TRAILS Sidewalk 4" Concrete, No Reinforcement and no Base Concrete 4" - no reinforcement and no base Bituminous concrete -2" with 4" base Bituminous concrete -2" with 4" base Concrete 4" - no reinforcement and no base Concrete 4" with WWF and no base Handrail 3 Rail 1-1/4" Finish Handrail 3 rail 1-1/4" finish Underdrains, Sidewalk (UD-3) Underdrains, Sidewalk (UD-3) Concrete yard steps with railings 4' wide, 3 steps 4' wide, 5 steps Pedestrian bridge, prefabricated Bridge abutments 4' wide 8' wide Fair weather crossing Steel frame with wood deck (PA-1) 4' wide 8' wide Trails - INCLUDES excavation and grading Bituminous concrete - Type I, TX-2 Up to 10' wide Concrete trail with gravel base Type IV, 4' - 6' Wide Earth trail, Type VI, 6' Wide Seal coat with 4" soil cement base Type III, TX-2, 6' Wide Stone dust with blue stone chip base Type II, TX-2, 6' wide Wood chip, 4' wide Woodchip trail with gravel base Type VII, 6'- 8' Wide Page 41 of 44 $ 48.47 SY $ 35.11 SY $ 52.66 SY $ 112.84 LF $ 19.11 LF $ $ 1,504.55 2,194.13 EA EA $ $ $ 3,134.46 5,642.03 1,765.33 EA EA LF $ $ 752.27 1,128.40 LF LF $ 57.67 SY $ $ 67.70 15.05 SY SY $ 18.81 SY $ $ 15.67 20.56 SY SY $ 18.81 SY COUNTY OF FAIRFAX, VIRGINIA DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES LAND DEVELOPMENT SERVICES 2016 COMPREHENSIVE UNIT PRICE SCHEDULE EFFECTIVE FEBRUARY 1, 2016 ENGLISH UNIT PRICE CATEGORY UNIT CRITICAL SLOPE STABILIZATION EROSION CONTROL Concrete slopes Concrete slopes $ $ 8.78 112.84 SY SY Gabions Grid pavers Log cribbing $ $ $ 208.13 112.84 87.76 CY SY LF Outlet Protection Concrete 4" Grouted rip rap , 18" Non-grouted rip rap , 18" $ $ $ 56.43 75.23 60.18 SY SY SY Paved Flume Paved flume $ 78.99 SY $ $ 5.02 57.67 SY SY Stormwater channel excavation Stormwater Channel Excav Grass Lined-Seeded Stormwater Channel Grass Line Seeded Rip Rap 12", non grouted Stormwater Channel Grass Line Seeded Rip Rap 18", non grouted Stormwater Channel Grass Line Sodded Stormwater Channel Grass Line Sodded Rip Rap 12", non grouted Stormwater Channel Grass Line Sodded Rip Rap 18:, non grouted Stormwater Channel Excav Rip Rap 12" non grouted Stormwater Channel Excav Rip Rap 18" non grouted $ $ $ $ $ $ $ $ $ 8.78 15.06 65.23 75.24 21.32 71.47 81.50 58.93 68.96 SY SY SY SY SY SY SY SY SY Structural Streambank Protection Biologs with live stakes Gabions Grouted rip rap 18" Non-grouted rip rap 18" $ $ $ $ 18.81 175.53 87.76 66.46 LF CY SY SY Vegetative Erosion Control Jute mesh Paper and nylon mesh Plastic netting, 20 mil., 1" x 2" grid Seeding includes fertilizing Seeding with soil treatment and watering Sodding includes fertilizing - banks Sodding includes fertilizing - flat Sodding with soil treatment and watering Straw mulch with tack $ $ $ $ $ $ $ $ $ 2.01 1.88 1.32 2.51 3.77 8.78 6.27 7.52 1.57 SY SY SY SY SY SY SY SY SY Deflectors Rip Rap Level Spreader Rip rap 18", not grouted Page 42 of 44 COUNTY OF FAIRFAX, VIRGINIA DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES LAND DEVELOPMENT SERVICES 2016 COMPREHENSIVE UNIT PRICE SCHEDULE EFFECTIVE FEBRUARY 1, 2016 ENGLISH UNIT PRICE CATEGORY UNIT Temporary Erosion Control Check Dam Check dam - gravel Gravel Construction Entrance Gravel construction entrance, including wash rack Sediment Basin Cut Sediment basin cut Sediment Basin Remove and Fill Upon Completion Sediment basin remove and fill upon completion Sediment Trap Basin Sediment trap basin Silt Fence Silt fence Storm Drain Inlet Control Storm drain inlet control Super Silt Fence Super silt fence Slope Retention Structures- NO mobilization included Concrete encasement of H sect., 3000psi Granular backfill Pre-auger, 24" diameter to 30 feet, normal soil Retaining Walls, concrete gravity, up to 6' HT, RW-2 Retaing Walls, concrete gravity, up to 6' HT, RW-3 Sheet piling Soil stabilization fabric Steel H section, 12 x 53 Whaler, 12"x12" prestressed concrete Whaler, 12"x12" treated timber Stream diversion Cut and haul Fill diversion and restore stream bank upon completion Rip rap base/sides with filter cloth Sand bag diversion in water Slope sides Temporary Riser Structure <10'HT: Install/Remove Temporary Diversion Dike Temporary diversion dike Temporary Sediment Trap Temporary sediment trap Temporary Sediment Trap Gravel Outlet Temporary sediment trap gravel outlet Tree Protection Fencing Tree Protection fencing Temporary Riser Temporary riser structure up to 10' tall - install and remove Page 43 of 44 $ 250.76 EA $ 3,134.46 EA $ 25.08 CY $ 31.35 CY $ 10.03 CY $ 5.02 LF $ 200.60 EA $ 12.54 LF $ $ $ $ $ $ $ $ $ $ 25.08 32.60 30.09 401.21 451.36 41.38 2.77 32.60 31.35 22.57 VLF CY VLF LF LF SF SY VLF LF LF $ $ $ $ $ 31.35 25.08 25.08 150.45 3.77 CY CY SF CY SF $ 10.03 LF $ 9.41 CY $ 31.35 LF $ 10.03 LF $ 4,513.63 EA COUNTY OF FAIRFAX, VIRGINIA DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES LAND DEVELOPMENT SERVICES 2016 COMPREHENSIVE UNIT PRICE SCHEDULE EFFECTIVE FEBRUARY 1, 2016 ENGLISH UNIT PRICE CATEGORY UNIT LOW IMPACT DEVELOPMENT (LID) Bioretention Bio retention basins - volume Bio retention filters - volume Constructed Wetlands Includes trees, shrubs, grass (Not rebuild streams/wetlands) Landscaping at bioretention filters/basins - See Landscape Section Extended Detention Basin Extended detention basin pipe inlet Extended detention basin - interior volume (includes forebay volume) Extended detention basin pipe outlet with rip rap Extended detention basin rip rap channel Extended detention basin riser structure Manufactured BMP Systems Manufactured BMP systems - hydrodynamics Manufactured BMP systems - filtering Overflow Spillway Stabilized overflow spillway Porous Pavement System Asphalt with gravel base and perforated drains Brick pavers with gravel base Grass pavers with gravel base Reforestation Reforestation Retention Basin Basin pipe inlet Interior volume (includes forebay volume) Outlet with rip rap Riser structure Tree Box Filter Tree box filter - with grate and frame 6'x6', without tree Tree box filter - with grate and frame 8'X8', without tree Tree in tree box filter Tree Box Outfall Tree box outfall 4" schedule 40 PVC with gravel backfill Vegetated roofs with granular drainage and plantings Aluminum Curbing for 6 inch depth Aluminum Curbing for 12 inch depth Extensive Filter fabric Gravel/concrete pavers forming vegetation-free strip Intensive - 18 inches maximum Irrigation to vegetated roof Leak detection system Thermal insulation Vegetated swales Check dams with filter fabric for vegetated swale Complete swale includes: piping/underdrain, fill, filter fabric and media Outlet protection with filter fabric for vegetated swale Page 44 of 44 $ $ 95.29 95.29 CY CY $ 27.58 SY $ $ $ $ $ 1,880.68 32.60 4,012.12 45.14 438.82 EA CY EA SY VLF $ $ 75.23 110.33 CY CY $ 313.45 SY $ $ $ 42.63 127.89 50.15 SY SY SY $ 56,420.35 AC $ $ $ $ 1,880.68 32.60 4,012.12 313.45 EA CY EA VLF $ $ $ 2,194.13 3,259.84 814.96 EA EA EA $ 40.12 LF $ $ $ $ $ $ $ $ $ 10.03 12.54 225.68 1.57 15.05 338.52 3.77 2.51 3.77 LF LF SY SF SF SY SF SF SF $ $ $ 62.69 95.29 62.69 CY CY CY