* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Download No Slide Title
Distributed firewall wikipedia , lookup
Network tap wikipedia , lookup
Airborne Networking wikipedia , lookup
Wake-on-LAN wikipedia , lookup
SIP extensions for the IP Multimedia Subsystem wikipedia , lookup
Point-to-Point Protocol over Ethernet wikipedia , lookup
Cracking of wireless networks wikipedia , lookup
List of wireless community networks by region wikipedia , lookup
Computer network wikipedia , lookup
Cellular network wikipedia , lookup
Deep packet inspection wikipedia , lookup
Multiprotocol Label Switching wikipedia , lookup
Internet protocol suite wikipedia , lookup
Recursive InterNetwork Architecture (RINA) wikipedia , lookup
UniPro protocol stack wikipedia , lookup
Network Research Group Universiti Sains Malaysia Table of Contents BNT ATM ATM Building Blocks Physical Layer ATM Layer Transmission Delay System Works OBJECTIVE This simulator will be developed to provide the user to analyze the factors that should be considered when a packet is sent from one node (source) to another node (destination)in broadband network. Broadband Network Technology IS BASICALLY A DIGITAL VIRTUAL CIRCUIT FOR MOVING FIXED SIZED PACKETS (CELLS) FROM SOURCE TO DESTINATION AT VARIOUS SPEEDS. BASED ON ATM TECHNOLOGY Asynchronous Transfer Mode •Fast Packet Switching Technology •Information Transmission Technology •Supports Variable Bit Rate (VBR) & Constant Bit Rate (CBR) information •Connection-Oriented -> Uses pre-established “virtual channels” which are like telephone calls •Requires all end stations to convert information into small, fixed- sized “cells” •Cells are placed on appropriate virtual channel Plane Management Layer Management Control/User Plane Control User ATM Adaptation Layer ATM Layer Physical Layer Physical Layer Is concerned with transmitting raw bits over a communication channel. The physical transmission medium Copper Fiber ATM Layer Has the same function as the Network layer in OSI model Deals with moving cells from source to destination It has the characteristic of a network layer protocol: End to end virtual circuit Switching Routing It is connection oriented Four main area will be covered in this layer : Cell format Header Connection Setup Routing and Switching Cell Format Cells are 53bytes (5bytes header and 48bytes payload) 2 interfaces I) UNI II) NNI User Network Interface is between a host and an ATM Network Network Network Interface is between two ATM switches AAL ATM 5 BYTES 48 BYTES HEADER PAYLOAD ATM Cell Format PHYSICAL Connection Setup A connection must be established before a packets is sent (connection-oriented) A setup message is sent to setup a connection and a release message is to release the connection Routing To determine the path taken by a message (virtual path and virtual circuit) Takes place in ATM Layer There are many routing techniques :- Fixed Flooding Adaptive Isolated Distributed Centralized Transmission Delay When packets are sent from source to destination, a transmission time is taken which is the transmission delay. Transmission delay, T is the time period between the time that the first bit of the message enters to the fiber and the time the last bit of message exits from the other end. Transmission delay is given by the formula below:T = L/C + 8N/B + X L/C - Propagation delay (time taken to send packets from source to destination) 8N/B - Time period the first bit of message exits from the other end and the time that the last bit of message exits there X - Delay in ATM switch ( in most cases the delay is estimated to be less than 10 milisec) Since it is based on TCP/IP protocols, the propagation delay will be 2 x L/C. This is the time taken to send packets and receive acknowledgement (ACK) from the receiver. System Works The user will be allowed to create nodes (transmitter and ATM switch) throughout Malaysia User are allowed to send packets through any path based on the bandwidth provided Apr - Jun 1997 Jul - Sept 1997 Oct - Dec 1997 Jan - Oct 1998 Preliminary Studies RM100 000 Phase I RM125 000 Phase II RM 15 000 RM100 000 Preliminary Studies : Research Studies & Information Gathering RM 225 000 Phase I : Physical Layer Transmission Of Data Over Communication Channels RM 240 000 Phase II : ATM Layer ATM Simulation based on the layer 2 Final Phase RM80 000 Final Phase : TCP/IP Implementation & Simulation In Putra Jaya