CLS PROJECT STATUS M.S. de Jong Project Leader November 16, 2002 Annual Users’ Meeting 2002 November 16 Synchrotron Facility E-gun & Linac Transfer Line & Booster ring Storage ring 2002 November 16 Beamline & End Station Sector (1 of 12) • Beamlines on a single CLS sector – Two bending magnet lines – One or more ID lines • Use of chicanes to get 2 undulator lines per straight • Needed to meet demand for insertion device beamlines 2002 November 16 Injector Status • Linac and transfer line to Booster – Modifications for 1 Hz operation complete – Continuing to improve control system and diagnotics • Booster (“Turn-key” system from Danfysik) – Commissioning of technical systems started in June and were completed in August (more detail in Les Dallin’s talk) – Formal acceptance of Booster completed by mid-September – Booster now shut down until needed for Storage ring commissioning 2002 November 16 Storage Ring Status - 1 • Major Sub-systems: – Dipole magnets (Tesla) - delivered – Quadrupole and Sextupole magnets (Sigma-Phi) – first set delivered, rest by year-end 2002 – Corrector magnets (Budker Institute) – delivered by year-end 2002 – Kicker magnets (Danfysik) – delivered by mid-February 2003 – DC Power supplies (IE Power) – 50% delivered, remained by year-end 2002 – RF amplifier (Thales) – commissioning at CLS – LHe plant (Linde) – operating at CLS – RF cavity (ACCEL) – delivery by year-end – Vacuum chambers (FMB) – 8 sectors delivered, remainder by year-end – Supports and girders (Saskatoon) - delivered 2002 November 16 Storage Ring Status - 2 • Installation – Water cooling and support pillar installation started in November – Install one sector by mid-December 2002 – Install remaining sectors by end of February 2003 – Commissioning of sub-systems will be done in parallel, so far as possible – Target: first injected beam in March 2003 • Commissioning – Beam tests in evenings and week-ends – Main building must be evacuated until commissioning radiation surveys confirm design radiation levels – 3-week on / 3-week off schedule likely – Target: light for first beamlines by mid-summer 2003 2002 November 16 IT Infrastructure • Phase I of IT infrastructure complete – Dual Cisco 6509 switches (1Gb →10Gb) – Voice-over-IP telephones – Redundant multi-mode and single-mode fibre network throughout facility – Direct fibre connection available for each beamline – Virtual LANs for office, controls, users, beamlines, etc. • Phase II implementation started: – 1-3 Terabyte Storage Area Network – Improved user connectivity to external Internet and CA4.net – Possible upgrading of local computational resources 2002 November 16 Beamlines: IR • High-resolution Far-IR Spectroscopy – Quotations received on spectrometer – RFPs for design-build of UHV and HV portions of optical system out by mid-December – Hutch construction started – ~13% of budget committed by 2002 Oct 31 – Start commissioning: ~ September, 2003 • Mid-IR Microscopy – Quotations due on spectrometer – RFPs for design-build of UHV and HV portions of optical system out by mid-December – Hutch construction started – ~25% of budget committed by 2002 Oct 31 – Start commissioning: ~ October, 2003 2002 November 16 Beamlines: PGM & SGM • VLS Plane Grating Monochromator – All major components ordered – Delivery of most components by 2003 June, except for Fixed-aperture High-Heat-Load most (2003 October) – 185mm PPM undulator ready by 2003 June – ID vacuum chambers (APS) to be delivered in 2003 July – ~70% of budget committed by 2002 October 31 • High-resolution Spherical Grating Monochromator – Same as above for most components – Shipment of existing SGM components from Madison at the end of summer 2003 – 45 mm PPM undulator ready by mid-summer 2003 – ~80% of budget committed by 2002 October 31 2002 November 16 Beamline: Spectromicroscopy • Soft X-ray Spectromicroscopy – – – – – Mirrors, gratings and monochromator ordered Mirror manipulator tenders under evaluation Started design specification of microscopy end-station ID vacuum chambers (APS) to be delivered in 2003 July All beamline components, including EPU (Elliptically Polarized Undulator), should be available by 2003 fall – ID straight designed to accommodate a second chicaned EPU – ~40% of budget committed by 2002 October 31 2002 November 16 Beamline: CMCF-I • Canadian Macromolecular Crystallography Facility – Mirrors and beamline components ordered, with delivery scheduled for 2003 September – Work continues on white beam transport line and endstation specifications – Started work on specification of control and IT requirements – Magnets ordered for Small-gap Undulator (SGU), work continues on specification of vacuum chamber – Beamline completion planned by 2003 Fall, but SGU might not be ready until early 2004 – ~40% of budget committed by 2002 October 31 2002 November 16 Beamline: Micro-XAFS • Hard X-ray XAFS / Micro-probe – Micro-probe capability (~2 μm resolution) and some powder diffraction capability added to design – Uses 31 mm multi-pole superconducting wiggler – Preliminary Design Report under review now – RFP for beamline and wiggler design-build expected to be issued by year end – Some risk that delivery completion will not be possible before early 2004 – ~7% of budget committed by 2002 October 31 2002 November 16 SUMMARY • Injection System Operational • Storage Ring installation has started • First injected beam in early spring 2003 • First light for beamlines in mid-summer 2003 • Five beamlines ready for light by fall 2003 – Two IR lines – Three soft X-ray lines • CMCF line ready by fall 2003, except for ID may be delayed until early 2004 • Micro-XAFS line ready in early 2004 2002 November 16