Survey
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
WCWSS The Western Cape Water Supply System • • • • • Serves more than 3 million people – Supply to Cape Town and some West Coast, Boland, Swartland and Overberg towns Irrigation – In the Berg, Eerste and Riviersonderend rivers – Production of 50% of SA’s irrigated agricultural export High economic growth and migration into the system area Infrastructure owned by the DWAF, City of Cape Town (CCT) & Eskom Berg Water Project under construction near Franschhoek WCWSS characteristics • 90% runoff in Winter (May to Oct) • 70% requirements in summer (Nov to Apr) • 50% of system dams’ storage needed to store winter water for usage in summer • 50% of system dams’ storage provides carry-over storage for drought periods • Dams are operated to minimise spillage • Droughts are managed by progressively restricting supplies PURPOSE OF THE RECONCILIATION STRATEGY • To update and review water requirements and interventions to meet requirements • To engage stakeholders and the general public • To develop toolkits to assist with the future reconciliation of supply and requirement • To provide a guide for decision-making towards effective reconciliation of supply and requirement • To recommend preparatory measures, actions and assign responsibilities Management of Study National Water Resource Planning Study Management Steering Committee Professional Service Provider DWAF HO DWAF RO Public participation CCT Saldanha Mun. Provincial Dept. of Agric Province RECONCILIATION STRATEGY STUDY Selected Stakeholder input Institutional Planning Process Provincial Integrated Development Plan Berg Catchment Management Strategy CCT’s Integrated Development Plan (IDP) Other WSDPs CCT WSDP CCT WC/WDM Strategy Reconciliation Strategy NEWSLETTER 1 PUBLIC MEETING To identify and provide feedback on interventions PUBLIC PROCESS FOLLOWED NEWSLETTER 2 August 2005: Screening of Interventions Workshop PUBLIC MEETING To provide feedback on interventions for comment Input from the Berg and Breede-Overberg CMA Reference Groups Refine reconciliation scenarios and strategy content through stakeholder workshops and technical focus groups NEWSLETTER 3 Summary of strategy to public for comment Input from the Berg and Breede-Overberg CMA Reference Groups DWAF WRFMC CCT Portfolio Committee CCT Mayco and Council Berg CMA Reference Group Determine and analyse a range of implementation scenarios NEWSLETTER 4 Obtain public feedback on scenarios through press release and newspaper advert PUBLIC MEETING To present the Reconciliation Strategy and selected interventions for further study Strategy Steering Committee to consider comments STRATEGY THEMES Water Requirements Implementatio n and Performance monitoring Water Use Efficiency Water Availability Monitoring and Information Management Strategy Comparison of supply and requirement Stakeholder Engagement Protection and Management Selection of intervention s Structure of Study Key Reports Reconciliation Strategy 9 Themes each containing •Key issues •Objectives •Approach •Action Determination of Future Water Requirements Scenario Planning for Reconciliation of Supply and Requirement Supporting Reports WC/WDM •Responsibility •Programme Treated Effluent use Bulk Water Supplied by the CCT 630 Previous unconstrained curve Million cubic metres/annum 580 530 480 High Water Requirem ent Curve 430 380 330 280 230 180 Actual Low Water Requirem ent Curve Low Water Dem and Curve (DWAF/CCT Agreem ent) 130 1978 1981 1984 1987 1990 1993 1996 1999 2002 2005 2008 2011 2014 2017 2020 Options/ Interventions Identified CCT 8-yr WC/WDM Strategy Additional Longer-term WC/WDM Groundwater Interventions Surface Water Interventions Treated Effluent use Desalination CCT 8-yr WC/WDM Strategy Additional Longer-term WC/WDM Groundwater Interventions Surface Water Interventions Treated effluent use Desalination Pressure Reduction Leak Detection and Repair Meter management and replacement Consumer awareness School Education Plumbing retro-fit prg Support for large consumers Re-use: Parks and Industry Management Information System Upgrade telemetry system CCT 8-yr WC/WDM Strategy Tariffs, metering and credit control Additional Longer-term WC/WDM Eliminate AFUs Promotion of private Groundwater Interventions Surface Water Interventions Treated Effluent use Desalination boreholes & wells Leak detection Water Efficient Fittings User Education CCT 8-yr WC/WDM Strategy Newlands Aquifer Cape Flats Aquifer Additional Longer-term WC/WDM West Coast Aquifers TMG Aquifer Groundwater Interventions Surface Water Interventions Treated Effluent use Desalination CCT 8-yr WC/WDM Strategy Voëlvlei Phase 1 Michell’s Pass Diversion Additional Longer-term WC/WDM 24 Rivers Dam Upper Wit River Diversion Groundwater Interventions Surface Water Interventions Treated Effluent use Desalination Raise Steenbras Lower Dam Upper Molenaars CCT 8-yr WC/WDM Strategy Additional Longer-term WC/WDM Treated Effluent use Irrig./ind Dual Reticulation Commercial Irrig. Exchange Treated Effluent use to Potable standards Groundwater Interventions Surface Water Interventions Treated Effluent use Desalination Berg River Exchange CCT 8-yr WC/WDM Strategy CCT Pilot Plant Desalination Plant Additional Longer-term WC/WDM Groundwater Interventions Surface Water Interventions Treated Effluent use Desalination Scenario Planning The objective of the Scenario Planning Process is to identify, evaluate and assess alternative groupings and phasing of interventions so as to determine the potential impacts and benefits of possible combinations of interventions to reconcile water supply and requirement in the WCWSS, up to 2030. SCENARIO 1 NO WC/WDM SCENARIO 2 SCENARIO 3 CCT WC/WDM strategy implemented CCT WC/WDM strategy implemented & additional WC/WDM interventions ILLUSTRATES IMPACT OF WC/WDM ON TIMING OF IMPLEMENTATION OF SUPPLY INTERVENTIONS SCENARIO DESCRIPTION No WC/WDM, but all supply interventions can be implemented Scenario1 Objective: To determine the impact of not implementing WC/WDM KEY FINDINGS Supply Intervention required by 2011 Due to long lead times earliest supply intervention could only be implemented by 2014 Shortfall in supply between 2011 and 2013 SCENARIO DESCRIPTION CCT WC/WDM strategy implemented as well as supply interventions. Scenario 2 Objective: To determine the impact of implementing the CCT’s WC/WDM strategy KEY FINDINGS Supply intervention required by 2015 Implementation of CCT’s WDM strategy and programme delays supply intervention by 4 years SCENARIO DESCRIPTION Scenario 3 CCT WC/WDM strategy and programme implemented as well as additional longer term WC/WDM interventions and supply interventions. Objective: To determine the impact of implementing all the WC/WDM interventions KEY FINDINGS Implementation of comprehensive WC/WDM could potentially delay supply intervention until approx. 2019 Comprehensive WC/WDM (100% successful implementation) can effect a saving of approx 100 million m3 of water per annum by 2019 SCENARIO 7 SCENARIO 8 SCENARIO 9 CCT WC/WDM strategy & Lowest URV Interventions CCT WC/WDM strategy, Lowest URV Interventions & Ecological Reserve CCT WC/WDM strategy, Lowest URV Interventions & Possible Climate Change ILLUSTRATES IMPACT OF LOWEST URV SELECTION AS WELL AS IMPACT OF IMPLEMENTING ECOLOGICAL RESERVE AND POTENTIAL IMPACT OF CLIMATE CHANGE SCENARIO DESCRIPTION CCT WC/WDM strategy implemented, thereafter selection based on URV. Scenario 7 Objective: To determine the impact of selecting interventions based on lowest URV KEY FINDINGS A mix of supply and demand interventions are available for selection in order to offset the anticipated shortfall in supply in 2015. Net present value of this option is R1 092 million 17 16 14 12 13 10 9 8 6 7 Scenario 7: CCT WC/WDM strategy implemented, thereafter selection based on URV No. WC/WDM Intervention Supply Intervention 17 TMG Scheme 1 16 TMG Scheme 2 15 WC/DM: User Education 14 TMG Scheme 3 13 24 Rivers Dam 12 West Coast Aquifers 11 WC/DM: Use of Water Efficient Fittings 10 Cape Flats Aquifer 9 Treated Effluent - Irrig./Ind 8 Voëlvlei Phase 1 7 Upper Wit River Diversion 6 Newlands Aquifer 5 WC/DM: Promotion of private boreholes & wells 4 WC/DM: Leakage detection and repair 3 WC/DM: Eliminate auto flush urinals 2 WC/DM: Tariffs, metering and credit control 1 CCT WC/WDM 8-year strategy SCENARIO Scenario 8 DESCRIPTION CCT WC/WDM strategy implemented, thereafter selection based on URV with the ecological Reserve being phased in for existing water resources Objective: To determine how the implementation of the ecological Reserve will impact on the selection of interventions KEY FINDINGS The yield of the existing water resources decreased by approx. 46 million m3. Supply and demand interventions are available Net present value of this option is R1 263 million. Cost of implementing additional interventions in order to offset the anticipated decrease in system yield is approximately R171 million in today’s terms. 19 18 17 16 14 13 12 10 9 7 8 6 Scenario 8: CCT WC/WDM strategy implemented, thereafter selection based on URV with the ecological Reserve being phased in for existing water resources No. WC/WDM Intervention Supply Intervention 19 Lourens River Diversion 18 Raise Lower Steenbras Dam 17 TMG Scheme 1 16 TMG Scheme 2 15 WC/DM: User Education 14 TMG Scheme 3 13 24 Rivers Dam 12 West Coast Aquifers 11 WC/DM: Use of Water Efficient Fittings 10 Voëlvlei Phase 1 9 Treated Effluent Irrig./Industrial 8 Cape Flats Aquifer 7 Upper Wit River Diversion 6 Newlands Aquifer 5 WC/DM: Promotion of private bore & well 4 WC/DM: Leakage detection and repair 3 WC/DM: Eliminate auto flush urinals 2 WC/DM: Tariffs, metering and credit control 1 CCT WC/WDM 8-year strategy SCENARIO Scenario 9 DESCRIPTION CCT WC/WDM strategy implemented, thereafter selection based on URV with the potential for climate change being factored in Objective: To determine how climate change could impact on the selection of interventions KEY FINDINGS The yield from the existing water resources and future water resources was assumed to decrease by approx. 107 million m3. Supply and demand interventions are available for selection Cost of impact is approx. R572 million 22 20 21 19 18 17 16 14 13 10 12 9 8 7 6 Scenario 9: CCT WC/WDM strategy implemented, thereafter selection based on URV with the potential for climate change being factored in No. WC/WDM Intervention Supply Intervention Treated Effluent use - dual reticulation Eerste River Diversion Lower Wit River Dam 19 Lourens River Diversion 18 Raise Lower Steenbras 17 TMG Scheme 1 16 TMG Scheme 2 15 WC/DM: User Education 14 TMG Scheme 3 13 24 Rivers Dam 12 West Coast Aquifer (Langebaan Road) 11 WC/DM: Use of Water Efficient Fittings 10 Upper Wit River Diversion 9 Voëlvlei Phase 1 8 Treated Effluent use- Irrig./Industrial 7 Cape Flats Aquifer 6 Newlands Aquifer 5 WC/DM: Leakage detection and repair 4 WC/DM: Promotion of private boreholes & wells 3 WC/DM: Eliminate auto flush urinals 2 WC/DM: Tariffs, metering and credit control 1 CCT WC/WDM 8-year strategy SCENARIO 10(A) SCENARIO 10(B) SCENARIO 10(C) CCT WC/WDM strategy & conservative Selection of Interventions CCT WC/WDM strategy, conservative Selection of Interventions, Ecological Reserve & Climate Change All WC/WDM interventions, conservative Selection of Interventions, Ecological Reserve & Climate Change ”CONSERVATIVE SELECTION” AND IMPACT OF IMPLEMENTING ECOLOGICAL RESERVE AND POTENTIAL IMPACT OF CLIMATE CHANGE Scenario 10 (a) to (c) “Conservative Selection” Reasons for omitting specific interventions: • Additional longer-term WC/WDM interventions – Equates to approx 50% of the modelled potential WC/WDM saving – Uncertainties regarding actual savings achievable • Newlands Aquifer – Small yield – Potential impact on river flow and existing users • Cape Flats Aquifer – Perceived O&M concerns of sustainability of operating wellfield in a relatively high density area • Upper Wit River Diversion – Potential difficulties in obtaining environmental approvals SCENARIO Scenario (a) DESCRIPTION CCT WC/WDM strategy, thereafter selection based on a conservative 10 selection of interventions Objective: To determine the impact of selecting a “conservative portfolio” KEY FINDINGS Supply interventions would have to be “fast tracked”. To avoid “fast tacking” WC/WDM would have to be successfully implemented Net present value of this option is R1 844 million (this is in comparison to a NPV of R742 million for Scenario 7, which was based on least cost selection and not a selection based on considerations of practicality and sustainability). 9 8 7 6 5 4 3 2 Scenario 10 (a): CCT WC/WDM strategy, thereafter selection based on a conservative selection of interventions No. WC/WDM Intervention Supply Intervention 9 Treated Effluent use - potable 8 Upper Molenaars (To Berg River Dam) 7 TMG Scheme 2 6 Lourens River Diversion 5 Raise Lower Steenbras (fast tracked) 4 Treated Effluent use Irrig./Industrial 3 Voëlvlei Phase 1 (fast tracked) 2 TMG Scheme 1 (fast tracked) 1 CCT WC/WDM 8-year strategy SCENARIO Scenario 10 (b) DESCRIPTION CCT WC/WDM strategy, thereafter selection based on a conservative selection of interventions including potential impacts of ecological Reserve and climate change Objective: To determine how the implementation of the Reserve and the potential for climate change could impact on the selection of interventions KEY FINDINGS Supply interventions would have to be “fast tracked”. Net present value of this option is R 4 477 million. Cost impact of climate change and implementing the Reserve is approx R 2 633 million 10 9 8 7 6 5 4 3 2 Scenario 10 (b): CCT WC/WDM strategy, thereafter selection based on a conservative selection of interventions including potential impacts of ecological Reserve and climate change No. WC/WDM Intervention Supply Intervention 10 Desalination 1 Generic 9 Treated Effluent use - potable 8 Upper Molenaars (To Berg River Dam) 7 TMG Scheme 2 (fast tracked) 6 Raise Lower Steenbras Dam (fast tracked) 5 Lourens River Diversion 4 Voëlvlei Phase 1 (fast tracked) 3 Teated Effluent use Irrig./Industrial (fast tracked) 2 TMG Scheme 1 (fast tracked) 1 CCT WC/WDM 8-year strategy SCENARIO Scenario 10 (c) DESCRIPTION All WC/WDM interventions implemented, thereafter selection based on a conservative portfolio of interventions, including potential impacts of ecological Reserve and climate change Objective:To determine how the implementation of longer term WC/WDM interventions impacts on Scenario 10(b) KEY FINDINGS Additional WC/WDM interventions delay supply intervention by 3 years Net present value of this option is R2 718 million. Benefit of delaying desalination by implementing additional WC/WDM interventions is approx R1 759 million 15 14 13 12 11 10 9 6 Scenario 10 (c): All WC/WDM interventions implemented, thereafter selection based on a conservative portfolio of interventions, including potential impacts of ecological Reserve and climate change No. WC/WDM Intervention Supply Intervention 15 Treated Effluent use- potable 14 Upper Molenaars (To Berg River Dam) 13 Lourens River Diversion 12 TMG Scheme 1 11 TMG Scheme 2 10 Raise Lower Steenbras Dam (fast tracked) 9 Voëlvlei Phase 1 8 WC/DM: User Education 7 WC/DM: Use of Water Efficient Fittings 6 Treated Effluent - Irrig./Industrial 5 WC/DM: Leakage detection and repair 4 WC/DM: Eliminate auto flush urinals 3 WC/DM: Promotion of private boreholes & wells 2 WC/DM: Adjustment of water tariffs, metering and credit control 1 CCT WC/WDM 8-year strategy SCENARIO 11 Low Water Requirement Curve CCT WC/WDM strategy & intervention selection based on URV ILLUSTRATES IMPACT OF LOW WATER REQUIRMENT CURVE SCENARIO Scenario 11 DESCRIPTION The low water demand requirement curve formed the basis of this analysis. CCT WC/WDM strategy implemented, thereafter selection based on URV Objective: To determine how the low water requirement curve and the least URV selection criteria could impact on the selection of interventions KEY FINDINGS The Low Water Requirement curve would delay the next intervention (after the implementation of the CCT’s WC/WDM strategy) until 2024. CONCLUSIONS • Successful implementation of CCT’s WC/WDM 8-year strategy and programme is essential • Additional longer-term WC/WDM interventions just as important • Groundwater options very important – especially TMG • Treated effluent use has massive potential. Treated effluent for potable use may be required as early as 2020 • Desalination of seawater as long term “back-up” • Feasibility studies should commence on both demand and supply interventions to ensure reconciliation of supply and requirement • A Strategy Committee should be formed to ensure implementation of the strategy Interventions Selected for Additional Study CCT WC/WDM Strategy and Programme Michell's Pass Diversion WC/WDM Adjustment of water tariffs, metering and credit control Newlands Aquifer WC/WDM Eliminate auto flush urinals Cape Flats Aquifer WC/WDM Promotion of private boreholes and wells West Coast Aquifer Recharge (Langebaan Road Aquifer) WC/WDM Leakage detection and repair Upper Wit River Diversion WC/WDM Use of water-efficient fittings Raising Steenbras Lower Dam WC/WDM User education Lourens River Diversion Scheme Voëlvlei Phase 1 Treated effluent use Upper Molenaars Diversion Strategy Committee A Strategy Committee should be established with the following objectives: • To ensure that the strategy is relevant and updated, • To monitor and co-ordinate the implementation of the relevant actions identified in the strategy, and • To make recommendations on long-term planning activities required to ensure reconciliation of requirement and available supply in the WCWSS area A support group should be established to provide administrative scientific and technical support to the Strategy Committee Representation on Strategy Steering Committee WC Provincial Government ( 5 REPRESENTATIVES) Local Authorities ( 5 REPRESENTATIVES) City of Cape Town: 3 representatives West Coast District Municipality: 1 representative Cape Winelands District Municipality: 1 representative Department of Water Affairs and Forestry ( 9 REPRESENTATIVES) Regional Office: 3 representatives Integrated Water Resource Planning: 3 representatives Water Use Efficiency: 1 representative Water Resource Infrastructure Branch: 2 representatives Catchment Management Agencies (when established) ( 2 REPRESENTATIVES) Berg CMA : 1 representative Breede-Overberg CMA: 1 representative Water User Associations ( 2 REPRESENTATIVES) Berg WUA: 1 representative Breede-Overberg WUA: 1 representative 23 REPRESENTATIVES RECOMMENDATIONS It is recommended that: • A Strategy Steering Committee be formed to oversee the implementation of the Strategy • The CCT and other WSAs should implement their WC/WDM strategies and programmes • The CCT and other WSAs should develop integrated policies on treated effluent use and determine the full future potential for treated effluent use • The CCT should continue with the TMG Feasibility Study and Pilot Project and the Desalination Pilot Plant as these could be significant future water resources • The DWAF and the CCT should initiate studies on a number of interventions to ensure the reconciliation of supply and requirement Thank you ANY QUESTIONS