Survey
* Your assessment is very important for improving the work of artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the work of artificial intelligence, which forms the content of this project
GEM-based detector projects at GSI (in the framework of JointGEM) PANDA Central- and Forward-Tracker (GEM-TPC & GEM-DISCs) Bernd Voss Helmholtzzentrum für Schwerionenforschung GmbH (GSI) The Panda Experiment B. Voss GEM-Projects@GSI 3rd Meeting@HIP July 15th 2010 2 The Future: PANDA at FAIR Facility for Antiproton and Ion Research, Darmstadt, Germany p production target PANDA B. Voss GEM-Projects@GSI 3rd Meeting@HIP July 15th 2010 3 Proto ANtiproton DArmstadt Experiment Overview p Target Superconducting solenoid (2T) + iron return yoke p Silicon Microvertex Detector Central Tracker • Straw tubes • GEM-TPC B. Voss GEM-Projects@GSI GEM-Tracker planar GEM-DISCs 3rd Meeting@HIP July 15th 2010 4 PANDA Central Tracker Requirements & Layout Full solid angle coverage Secondary vertex resolution σrφ~150μm, σz~1mm Momentum resolution δp/p~(2)% Minimal material budget X/X0~(2)% Particle Identification δE/E~(7)% Operation in 2T magnetic field Time Projection Chamber (TPC*) MPGD: high granularity, fast signal, good multi-track resolution Continuous operation at high rate (space charge, event mixing) …with GEM amplification reduced ExB effect, suppressed ion feedback *D.R. Nygren et al., Phys. Today 31, 46 (1978) B. Voss GEM-Projects@GSI 3rd 2 half cylinders L=150cm R=15/42cm Drift field 400 V/cm Ne/CO2 (90/10), max. drift time 55µs Multi-GEM stack Pad Size ∼2x2mm2, 100.000 ch Meeting@HIP July 15th 2010 5 Planar GEM-Tracker Basic assumptions 1 0 1 2 3 Figure of Merit: Relative momentum resolution dp/p (p,θ,z,r) particle momentum p scattering angle θ vertex coordinates z, r Basis assumptions: GEM-TPC short version (1,5 m 1,2 m) 4 GEM-DISCs (GEM0..3) Equal sizes GEM1=GEM2 ! Maximize shape-conformity Target spectrometer@PANDA ‘V833’ B. Voss GEM-Projects@GSI 3rd Meeting@HIP July 15th 2010 6 Planar GEM-Tracker Angular range Active area Requirements ~ 2..21 (..30)° 0,6..1,7 m2 Material budget (active area) < 0.5% X0 (per GEM station) Position resolution < 0.1 mm Counting rate capability < 40 (..140) kHz / (cm2 s) Resistance against aging effects Stable operation at design luminosity for 10y lifetime Track efficiency degradation < 2% / layer (per GEM station) 10 mm Positional Double track to be checked against expected pile-up event rate resolution Angular 5° B. Voss GEM-Projects@GSI 3rd Meeting@HIP July 15th 2010 7 The ‚real‘ world Hardware Test TPC ‘large‘ TPC Prototype … B. Voss GEM-Projects@GSI 3rd Meeting@HIP July 15th 2010 10 Planar GEM-DISCs Detector assembly Possible cabling hooks: central bar & circumference Window GEM stack Drift electrode B. Voss GEM-Projects@GSI Cooling Pad Plane Support Support & & LV- Distribution MediaDistribution 3rd Meeting@HIP Front-End Electronic Shielding Cover & Read-out Plane July 15th 2010 11 ‘large’ TPC Prototype Detector Assembly Resistor strips /gas line / HV-line Field Cages In preparation Assembly done Several hundred pieces Cathode B. Voss Electronic Flange GEM Flange Media Flange GEM-Projects@GSI 3rd Meeting@HIP July 15th 2010 12 Pad Size & Geometry Residual cluster width (x) (cm) PadPlane Design with diffusion w/o diffusion Pad radius (cm) 1.5 mm outer pad radius 10.000 (Prototype) up to 100.000 (Final) channels 105 / 300 mm ‘active’ diameters 1,5 mm radius, hexagonal pads 0,2 mm gap 10296 active Pads in total 42 sectors cylindrical symmetry 300 pins/connector B. Voss GEM-Projects@GSI 3rd Meeting@HIP July 15th 2010 13 QA & inspection Large area 1180 x 800 x 500 mm machinery (upgraded later on) High precision σ(i) ≈ 5µm High resolution digital microscope 54 MPix B. Voss GEM-Projects@GSI 3rd Various magnifications x10..1000 2D and 3D Pictures & Measurements Various Lighting- & filter options ,multi-purpose Meeting@HIP July 15th 2010 14 Pad-Plane … quality checks on geometry Device under test ‘Hexagon’ Pad-Plane QA looking for shape distortions Design (42 bores) Circle radius: 175,00 mm Ellipse rx: 174,99 mm ry: 174,02 mm Excentricity: 0,99985 Deviations: Δrmax: 0,11 mm Δrmin : 0,01 mm Fit Design goals accomplished B. Voss GEM-Projects@GSI 3rd Meeting@HIP July 15th 2010 15 PadPlane assembly ‘…glued into the frame’ Centre part on GND potential Dead Pads due to Support ring B. Voss GEM-Projects@GSI 3rd Meeting@HIP July 15th 2010 16 GEM-Assembly Foil mounting GEM-flange assembly Single-flap contact B. Voss GEM-Projects@GSI 3rd 5 / 50 105 / 300 8 iris like 70 /140 µm Cu on Kapton mm ‘active’ diameters sectors pattern µm double conical CERN ‘standard’ arrangement 18 Mio holes in total Inner & outer GFK support rings leakage current < 10 nA/sector@650V Hole geometry checked at 5 points Optical transmission (36 ± 3)% @2x3mm check once per sector Meeting@HIP July 15th 2010 17 ‘…stacked on the flange’ GEM assembly Central GEM-HV supply HV-protection HV-stability tested, Design goals accomplished cover B. Voss GEM-Projects@GSI 3rd Meeting@HIP July 15th 2010 18 Tools & Tests Universal Test-Box Universal for all assemblies & -combinations Single-GEM, GEM-stack, PP, GS+PP, GS+PP+FEE… 8h 0,5nA B. Voss GEM-Projects@GSI 3rd Features Stable & Highly accessible ‚Radiation transparent’ (x-ray / rad. sources) entrance& exit-windows EMV shielding, Gas compartment, 1:1 connections feed trough Use case: GEM-foil test 10 foils, leakage current per sector: Immediate at 650V <10nA (CERN) Immediate at 550V (3.11.8) nA, max. 6.3 nA after 8h at 600V <0,5 nA Meeting@HIP July 15th 2010 19 Tools & Tests GEM / Pad Plane Test stand B. Voss GEM-Projects@GSI 3rd Tasks / Tests: Verify Pad Plane functionality Test GEM amplification uniformity Commission Front-End Electronics Meeting@HIP July 15th 2010 20 GEM Test chamber … some results Gain with voltage Pulse height in Ar/CO2 (70/30) Pulse Height Cu X-ray 8.0-8.9keV Current Gain uniformity 55Fe 5.9keV 1 2 3 6 5 B. Voss GEM-Projects@GSI 3rd Meeting@HIP 4 July 15th 2010 21 Full test assembly ‘…waiting for HV-Test’ Mounting the Test-Cathode Looking for gas leaks B. Voss GEM-Projects@GSI 3rd Meeting@HIP July 15th 2010 22 … work still ongoing Field Cage Rohazell® Al on Kapton® shield Kapton® reinforcement 80..240µm Gas channels Staggered strip line Cu on Kapton® / FR4 Resistor- (6x2) strips (≈900) split chains, paired, 1..5 W 10% w(1mm) g(0.5mm) 20..100 µm thick backside shifted by ½ Linear Heater System GEM-Projects@GSI High Voltage 29 kV Drift field 400 V/cm Heat dissipation 5 W (not visible) Outer & Inner FieldCage o=300mm i=105mm L=702mm B. Voss 8% 7% 3rd Meeting@HIP 3mm July 15th 2010 23 Tools Field-Cage Mould Vacuum grooves Inner structures (w/o heater) paneling before milling Temperature pickup B. Voss ready to use Metapor® panels GEM-Projects@GSI 3rd Meeting@HIP July 15th 2010 24 Field-Cage Fabrication…first hand laminated sample First hand-laminated samples (wet-in-wet, stacking as for Cathode end-cap) Al / Kapton 22,5 µm Rohazell 2 mm Kapton 2x80 µm Kapton / Al 22,5 µm Without strip-line, resistors, gas channels… First results look promising but still room for improvements B. Voss GEM-Projects@GSI 3rd Heater & Control unit optimized material budget with prepreg / melting-foil lamination Work done on flat & curved samples: stitching, part mounting, gas distribution, test of mech. stability, HV-stability etc. Many recent improvements in details (processes, solutions) Next steps: Production & test of ‘real’ parts Meeting@HIP July 15th 2010 25 Field-Cage Fabrication …hand laminated cathode First hand-laminated sample (wet-in-wet, stacking as for field cage) Al / Kapton 22,5 µm Rohazell 2 mm Kapton 2x80 µm Kapton / Al 22,5 µm Not cut out yet… First results look promising (flatness, stiffness) but still room for improvements (weight) Problematic because of space resrictions: B. Voss GEM-Projects@GSI 3rd HV-line & joint ground-braking solution missing Isolation at edges & rims (Corona discharges) Meeting@HIP July 15th 2010 26 …sample resistor chains The voltage divider(s) SMD 0603/0805 Resistor chain (1 out of 4..6) Strip 966 Cu (2x25µm incl. Au-plating & Coverlay ) on Kapton (≈50µm) Gap 0.5 mm Strip 1 mm (Cathode) Gas holes Strip 1 (3.GEM) Good shape conformity Manual soldering takes 162h / field cage Gas holes Done sucessfully: Test on flat samples stitching, mech. stability, gas penetration, HV-Stability, part mounting, handling etc. inside outside B. Voss GEM-Projects@GSI 3rd Next steps: Production & test of full-size samples Semi-automatic part mounting Meeting@HIP July 15th 2010 27 Tools Thin-foil Stitcher B. Voss GEM-Projects@GSI Setup design: flexible to join various foil- thicknesses & widths with 2 mm ‘tape’ Stable & high-precision (10µm) Vacuum chucks keep foils in position and sufficiently flat Controlled & regulated heating system 3rd Meeting@HIP July 15th 2010 28 Tools Solder-paste deposition Electronic Components Part Mounting Reflow Soldering Integrated into the (x,y,z) facility Advantages: Fast prototyping High shape flexibility Large specimen sizes Limitations: Nearly complete but if not ready in time… B. Voss GEM-Projects@GSI 3rd 2 component types per run Main applications GEM-TPC Field Cage (> 20000 SMD resistors) PadPlanes hand-mounting is still an option Meeting@HIP July 15th 2010 29 MediaFlange assembly ‘…needs a backplane’ ‘Cover’ plate ready too B. Voss GEM-Projects@GSI 3rd Meeting@HIP July 15th 2010 30 Read-Out End-Cap Test Assembly Dummy Cathode GEMFlange Media Flange Read-Out Electronic Low Voltage Cooling Overall things seem to fit B. Voss GEM-Projects@GSI 3rd some details to be worked at Meeting@HIP July 15th 2010 31 T2K ‘AFTER’ …used for the prototype tests • AMS CMOS 0.35 µm technology • 76 channels / chip, 4 chips/card • Charge-sensitive preamp • Shaper, t programmable • analog sampling at 10 – 50 MHz • analog ring buffer 511 cells • external trigger MUX at 20 MHz • expected noise: 500 e- at 10 pF • power consumption < 0.6 W/chip • Electronics delivered for 10kch • Fighting with small problems B. Voss GEM-Projects@GSI 3rd Meeting@HIP July 15th 2010 32 A use case… The CB-ELSA Experiment B. Voss GEM-Projects@GSI 3rd Meeting@HIP July 15th 2010 33 ELectron Stretcher Accelerator (ELSA) B. Voss GEM-Projects@GSI 3rd Meeting@HIP July 15th 2010 34 Crystal-Barrel@ELSA (CB-ELSA) • e- beam: 0.5-3.5 GeV, ~ nA, polarized • tagged photon beam, polarized B. Voss GEM-Projects@GSI 3rd Meeting@HIP July 15th 2010 35 GEM-TPC in CB-ELSA • Polarized target: butanol 2x2x2 cm3 • Crystal Barrel Detector 1230 CsI crystals, 6°x6° • Inner detector: part. discr. cylinder of 513 SciFi • Forward plug: 12°-30° 90 CsI crystals with PMT: trigger • Forward detector (MiniTAPS) 216 BaF2, 1°-12° • CO2 gas Cherenkov detector to suppress e.m. background no tracking, no timing see HK 57.9 Alexander Winnebeck TPC B. Voss GEM-Projects@GSI 3rd Meeting@HIP July 15th 2010 36 Beam Test at CB-ELSA …work ongoing Trigger scintillators e- GEM-TPC GEM Beam: 500 MeV e- Track definition by external telescope Alignment using photogrammetry + tracks Silicon microstrip 4xSCI, 2xGEM (10x10cm2, 2Dstrip ) + 4xSi planes Test-TPC: 3xGEM 10x10cm2, 7.7cm drift, ∼1500 hex.pads, T2K readout Objectives: systematic studies of gain, uniformity, gas parameters, space charge, ion feedback, cosmic tracks, (spatial) resolutions Has been brought to and set up at COMPASS (still in preparation) B. Voss GEM-Projects@GSI 3rd Meeting@HIP July 15th 2010 37 GEM-TPC in FOPI @ GSI Barrel CDC GEM TPC RPC PLAWA L y z Helitron x ‘Spider’ Support Integration well advanced with respect to supplies, mechanics, DAQ Temperature gradient (h,v) ≈ (3.4,1.5) °C measured in-place (preliminary) B. Voss ‘Bucket’ GEM-TPC possible counter actions? cooling, measure & correct GEM-Projects@GSI Restricted volume 3rd Meeting@HIP CDC outer support July 15th 2010 39 Prototype plans Measurement program at FOPI Light ion beam, 2 AGeV/c, e.g. Li, 104-107 ions per spill (4s or 8s) Polyethylene target Gas: Ne/CO2 (90/10) Shaping time 200 ns, sampling rate 20 MHz Gain scan Different intensities (beam, target) Goals Spatial- & momentum resolution dE/dx capabilities Rate effects B. Voss GEM-Projects@GSI 3rd Meeting@HIP July 15th 2010 40 Roadmap for GEM-TPC@FOPI*) …a tough endeavor 10.10. End of changing set up for next experiment 24.09. Start of test run (shift by one week in discussion) 06.09. Deadline detector implementation 23.08. Start cosmics calibration-measurements 01.08. Start lab tests 31.07. Finishing assembly of full detector system 30.06. End of production of FieldCage …? Ongoing: GEM-Assembly tests, treatment of sensor signals Pending: StripLine Foil delivery To be done: set up HV-stability test to 45kV Shift by one week in discussion B. Voss GEM-Projects@GSI 3rd Meeting@HIP July 15th 2010 41 Summarizing… B. Voss GEM-Projects@GSI 3rd Meeting@HIP July 15th 2010 42 Summary & Outlook Detector Construction & Assembly Well advanced: GEM-, Media- & Electronic-Flange Assembly of these components for lab.-tests in April Field Cage is the ‘last challenge’; goal: ready in June Electronic issues understood, full scale readout to be set up until April Commissioning & testing Well prepared: single-component tests, cosmics test stand, in-beam test stand at CB-ELSA Mechanical & Slow Control & DAQ-Integration into FOPI & CB-ELSA prepared / in progress, supply lines installed Reconstruction with PANDA Root set up Proof-of-principle tests in August-October 2010 at FOPI First results by end of 2010, PANDA-TDR by middle of 2011 Serious work on a GEM-Disc Prototype started recently B. Voss GEM-Projects@GSI 3rd Meeting@HIP July 15th 2010 43 The GEM-TPC & GEM-Tracker Collaboration Heinz Angerer2, Reinhard Beck3, Martin Berger5, Felix Böhmer2, K. -T. Brinkmann3, Paul Bühler4, Michael Carnegie4, Sverre Dørheim2, Laura Fabbietti5, Chr. Funke3, F. Cusanno5, Jörg Hehner1, Andreas Heinz1, Markus Henske1, Christian Höppner2, David Kaiser3, Bernhard Ketzer2, Volker Kleipa1, Igor Konorov2, Jochen Kunkel1, Michael Lang3, Johann Marton4, Sebastian Neubert2, Stephan Paul2, André Remers1, Holger Risch1, Alexander Schmah5, Christian Schmidt1, Roman Schmitz3, Sandra Schwab1, Daniel Soyk1, Ken Suzuki4, Ulrike Thoma3, Eduard Traut1, Maxence Vandenbroucke2, Bernd Voss1, Jan Voss1, Dieter Walter3, Joachim Weinert1, Eberhard Widmann4, Alexander Winnebeck3, H. -G. Zaunick3, Xiaodong Zhang2, Johann Zmeskal4 1 2 3 4 5 GSI Helmholtzzentrum für Schwerionenforschung GmbH, Darmstadt, Germany Technische Universität München, Physik Department, Garching, Germany Helmholtz-Institut für Strahlen- und Kernphysik, Bonn, Germany Stefan-Meyer-Institut für subatomare Physik, Vienna, Austria Technische Universität München, Excellence Cluster “Universe”, Garching, Germany Backup slides High Energy Storage Ring (HESR) High intensity mode • L 2 1032 cm -2s -1 • p/p 104(stoch. cooling) High resolution mode • L 1031 cm-2s-1 • p/p 105(e- cooling) Antiproton storage ring • p injection at 3.7 GeV/c • Synchrotron: 1.5 – 15 GeV/c • Internal targets: H, nuclei PANDA from CR B. Voss GEM-Projects@GSI 3rd from SIS18 Meeting@HIP July 15th 2010 46 Physics at PANDA QCD bound states Charmonium Gluonic exitations above 2 GeV/c2 Heavy-light systems Strange and charmed baryons Hadron properties in nuclear medium Double hypernuclei production an spectroscopy Nucleon structure Generalized distribution amplitudes Time-like electromagnetic form factors Transverse spin distribution in nucleons Electroweak physics B. Voss GEM-Projects@GSI 3rd Meeting@HIP July 15th 2010 47