* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Download Status Report of Taiwan Two Meter Telescope
Survey
Document related concepts
Hubble Space Telescope wikipedia , lookup
Allen Telescope Array wikipedia , lookup
Optical telescope wikipedia , lookup
Arecibo Observatory wikipedia , lookup
Very Large Telescope wikipedia , lookup
Spitzer Space Telescope wikipedia , lookup
Lovell Telescope wikipedia , lookup
Leibniz Institute for Astrophysics Potsdam wikipedia , lookup
International Ultraviolet Explorer wikipedia , lookup
James Webb Space Telescope wikipedia , lookup
Jodrell Bank Observatory wikipedia , lookup
Transcript
Status Report of Taiwan Two Meter Telescope Yi Chou Graduate Institute of Astronomy National Central University 2017/5/23 2011兩岸天文儀器會議 1 2M Telescope Project • Project started in early 2006 • Funding – Ministry of Education:5500 project • Telescope : ~2.6M USD – National Science Council • Instrument: ~1.3M USD – NCU Foundation • Building, dome & Transportation : ~3.5M USD – Total: ~7.4 M USD 2017/5/23 2011兩岸天文儀器會議 2 Telescope 2017/5/23 2011兩岸天文儀器會議 3 2M Telescope 1. Optical system: Optical type:Ritchey-Chretien Effective aperture:2000mm Focal ratio:Primary F2.2 , combined F8 Concentration ability:80% of light energy in 0.4 arcsec Mirror Surface Accuracy: 1/15λ Available filed of view:1 degree Maximum Slew Rate: 4 deg/sec 2.Mechanical system: 2017/5/23 Mount type:Alt-Az mount Total weight:23 ton Height in total:8664mm Max. instrument load for Cassegrain focus:500kg Max. dimension of Csaaegrain instrument: 2m x2m x2m 2011兩岸天文儀器會議 4 Telescope Manufacture • Nishimura Opt. Ltd. won the contract and started to design and build the telescope in early 2007. 2017/5/23 2011兩岸天文儀器會議 5 Telescope Manufacture Oct 2007 Telescope design complete Jan 2009 Manufacture of mirrors complete Mar 2009 Mirrors ship to Japan Major parts of telescope complete Mar 2010 Integration test complete Apr 2010 Telescope shipped to Taiwan 2017/5/23 2011兩岸天文儀器會議 6 Telescope Design (10/2007) 2017/5/23 2011兩岸天文儀器會議 7 Primary Mirror Polishing (06/2008) 2017/5/23 2011兩岸天文儀器會議 8 Primary Mirror (02/2009) 2017/5/23 2011兩岸天文儀器會議 9 Parts of Telescope (02/2009) 2017/5/23 2011兩岸天文儀器會議 10 Taiwan Two Meter Telescope (03/2010) 2017/5/23 2011兩岸天文儀器會議 11 Integration Test (03/2010) 2017/5/23 2011兩岸天文儀器會議 12 2017/5/23 2011兩岸天文儀器會議 13 2M in Taiwan Now (in a Warehouse) 2017/5/23 2011兩岸天文儀器會議 14 Site and Building 2017/5/23 2011兩岸天文儀器會議 15 Mt Jade ~4,000 m NCU Lulin Observatory ~2,860 m Alisan 2017/5/23 2011兩岸天文儀器會議 16 Lulin Observatory 40 cm Future 2M Telescope Telescope EPA Lab Weather Station LOT 1 meter teelscope TAOS-A/B TAOS-C NCKU ELF TAOS-D 基地台 2017/5/23 Taida LELIS 2011兩岸天文儀器會議 17 Sketch Maps of 2M Telescope and Observatory Sketch Map of the 2m telescope and observatory 2017/5/23 Imaginary view of the 2m Observatory 2011兩岸天文儀器會議 18 Difficulties We Met …… • However, there is a new regulation in Taiwan that the mountain area above 1500 m was assigned as protected area and only limit buildings are allowed. Astronomical observatory was not included. • Thank to assistant from Chairman Wang of Legislative Yuan to coordinate government ministries, astronomical observatory was finally put into the list in late 2007. • The building permit was issued on 11/15/2008 from Chiyi county government. • A local company won the contract for the building and was ready to start the construction in May 2009 …… 2017/5/23 2011兩岸天文儀器會議 20 Difficulties We Met …… • In May 2009, Environment Protection Administration (EPA) informed us the construction must be suspended because the 2M building is located inside an animal protection area. – Environmental impact assessment must be done in advanced. – In this animal protection area, four season’s animal inspection is essential. – The building permit was invalid – The building contract had to be rescinded • Environmental impact assessment was made from Oct 2009 to Nov 2010 and the report was approved by EPA in March 2011. The new budget was set and the construction will be started soon. 2017/5/23 2011兩岸天文儀器會議 21 Instrument 2017/5/23 2011兩岸天文儀器會議 22 Instrument • The first generation instrument for 2M telescope is the Simultaneous Multi-color Imager. • This 4-color simultaneous imager consists of – Dichroic mirrors and filters • split the light into 4 bands: 552-689nm(r), 691-815nm(i), 815915nm(z) and 967-1024nm(y) – higher QE CCD cameras • 3 sets of 1100-series cameras were purchased from Spectral Instruments Inc., USA, within E2V back illuminated deep depletion CCDs for r,i,z bands • The other one (NCU-Cam1), with within fully depleted CCD from Hamamatsu photonics K.K., Japan. and Polycold cryo-cooler, is developed by NCU instrument team 2017/5/23 2011兩岸天文儀器會議 23 4-color Simultaneous Imager 2017/5/23 2011兩岸天文儀器會議 24 4-color Simultaneous Imager 2017/5/23 2011兩岸天文儀器會議 25 Instrument Lab at NCU • To make the multi-color imager for 2M telescope, as well as for future instrument developments, NCU set up an instrument lab in early 2009. • Key persons of NCU lab – Jason Wu: Electrical engineer – Duncun Chen: Project assistant – Azure Yang: Project assistant 2017/5/23 2011兩岸天文儀器會議 26 Instrument Development July-Sep 2010 July 2010 Sep 2010 April 2011 July 2011 2017/5/23 Three 1100-series cameras arrived A 1100-series camera tested with LOT Optical adopter design complete Optical adopter complete All four camera tested with LOT 2011兩岸天文儀器會議 27 Three 1100-series Cameras Arrived 2017/5/23 2011兩岸天文儀器會議 28 A 1100-series Camera Tested with LOT 2017/5/23 2011兩岸天文儀器會議 29 LOT/SI1100 First light Image 2017/5/23 2011兩岸天文儀器會議 30 LOT/NCUcam-1 First Light Image 2017/5/23 2011兩岸天文儀器會議 31 Optical Adopter Design Complete 2017/5/23 2011兩岸天文儀器會議 32 Optical Adopter 2017/5/23 2011兩岸天文儀器會議 33 Summary • The manufacture of telescope has been completed and the telescope has shipped to Taiwan in 2010. • The environment impact assessment has been completed and the new budget has set. The construction will be started soon/ • The 4 cameras, including the one we develop (NCUcam1), and the optical system for the 4-color simultaneous imager have been complete. The integration test cannot be done due to the delay of telescope dome construction. – We are now looking for suitable telescope that allows us to test instrument’s performance, or, furthermore, start scientific observations. 2017/5/23 2011兩岸天文儀器會議 34 Thank You 2017/5/23 2011兩岸天文儀器會議 35