Download Slide 1

Survey
yes no Was this document useful for you?
   Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Document related concepts
no text concepts found
Transcript
1ST INTERNATIONAL FORUM
OF THE RAIL TARIFF REGULATORS
The experience and development of railway
infrastructure in Brazil
ABIFER - Brazilian Association of the Railroad Industry
Vicente Abate – President
October 24, 2013
ABIFER,
36 years tracking the development
ABIFER
OUR MISSION
> To instigate the local Brazilian railway industry growth
> To stimulate the freight and mass transportation expansion
> To give technical support to the rail operators and their users
BRAZILIAN RAILWAY INDUSTRY
FREIGHT CARS
METRO AND SUBURBAN TRAINS
MONORAILS
LOCOMOTIVES
TRAMWAYS
HIGH SPEED TRAINS
ANNUAL CAPACITIES
12000 1000
FREIGHT CARS
PASSENGER CARS
250
LOCOMOTIVES
TRANSPORT INFRASTRUCTURE INVESTMENTS
SOURCE::
TRANSPORT MINISTRY
BNDES
ALL THE MODES
Decade
% of GDP
(average)
1970/80
1.8
1980/90
0.6
1990/00
0.2
2000/10
0.4
2010/20
1.6
(forecast)
0.6% - Railways
RAILROAD INFRASTRUCTURE INVESTMENTS
R$ 113 billion (US$ 52 billion)
Network
Extension
(km)
2013
1,000
2016
1,400
2018
2,000
2020
2,600
PASSENGERS
SOURCE::
CITIES MINISTRY
BNDES
RAILROAD INFRASTRUCTURE INVESTMENTS
R$ 119 billion (US$ 55 billion)
Network
Extension
(km)
2013
23,000
2016
28,000
2020
33,000
2025
39,000
FREIGHT
SOURCE::
TRANSPORT MINISTRY
BNDES
RAILROAD NETWORK
EXPANSIONS
Belém /
V. Conde
Santarém
Itaqui
Pecém
Manaus
Açailândia
Ligação
Pacífico
Parnamirim
Estreito
Porto Velho
Eliseu
Martins
Figueirópolis
Lucas do Rio
Verde
Salgueiro
Suape
Barreiras
Salvador
Aratu
Uruaçu
Ilhéus
Rondonópolis
Belo Horizonte
Estrela
d’Oeste
Vitória
Maracaju
Rio de Janeiro
Itaguaí
Santos
Paranaguá
S F. Sul
Itajaí / Navegantes
Ligação
Pacífico
Hidrovias Estruturantes
Malha Explorada
Malha - PAC
Malha - PIL
Em Estudo
Rio Grande
INVESTMENT LOGISTICS PROGRAM
SOURCE: ANTT
> R$ 99 billion (US$ 46 billion)
> 11,000 km of new and modernized railroads
> 12 branches
> Open access (new model)
> Concession/PPP – 35 years
> 100% guaranteed demand for the infrastructure
concessionaire
> 15% advanced payment
> 70% BNDES financing – 25 years
> Auctions 3 branches (3,700 km) – 2013 (forecast)
balance – 1ST semester 2014
ABIFER´S MESSAGE
Strong Railroad
+
Strong Industry
=
Developed Country
Спасибо за внимание
THANK FOR YOUR ATTENTION
Vicente Abate
President
ABIFER
Tel: +55 (11) 3289-1667
[email protected]
www.abifer.org.br
Twitter: @abifer_oficial
Facebook: ABIFER