Pulse-width modulation wikipedia , lookup

Power over Ethernet wikipedia , lookup

Power inverter wikipedia , lookup

Electronic engineering wikipedia , lookup

Ground (electricity) wikipedia , lookup

Variable-frequency drive wikipedia , lookup

Opto-isolator wikipedia , lookup

Rectifier wikipedia , lookup

Electric power system wikipedia , lookup

Fault tolerance wikipedia , lookup

Islanding wikipedia , lookup

Electrification wikipedia , lookup

Voltage regulator wikipedia , lookup

Earthing system wikipedia , lookup

Surge protector wikipedia , lookup

Power electronics wikipedia , lookup

Three-phase electric power wikipedia , lookup

Buck converter wikipedia , lookup

Stray voltage wikipedia , lookup

History of electric power transmission wikipedia , lookup

Voltage optimisation wikipedia , lookup

Switched-mode power supply wikipedia , lookup

Power engineering wikipedia , lookup

Alternating current wikipedia , lookup

Mains electricity wikipedia , lookup

Electrical substation wikipedia , lookup

Transcript
Requests for Information
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
PUB-NP-157
Supply Issues and Power Outages
on the Island Interconnected System
Page 1 of 3
Q.
Please describe Newfoundland Power’s distribution system planning policy,
criterion and process. Include in the response the numbers and titles of personnel
involved with the distribution planning process.
A.
1.0
Policy and Process
Distribution planning activities at Newfoundland Power (“the Company”) involve two
primary functions; (i) capital planning and (ii) operational planning.
Capital Planning
Capital planning activities involve the annual completion of distribution system studies
and load forecasts to identify technical constraints on the distribution system that may
require capital expenditure. These distribution planning studies and load forecasts
provide input into the Company’s five-year capital plan. During the development of the
Company’s annual capital budget application, identified projects are analyzed for
technical merit, alternatives, least cost economics and budgeting. These planning
activities are the responsibility of the Distribution Engineering section, with involvement
and input as required from the regional engineering groups. These studies are completed
by the Supervisor, Distribution Engineering and Standards under the direction and
approval of the Superintendent of Engineering.
Operational Planning
Operational distribution planning activities involve daily analysis of the distribution
system to react to changes or additions to the distribution system on a regional level.
These activities typically include new load analysis, outage investigations and temporary
system condition changes. These distribution planning activities are the responsibility of
each regional engineering group and involve the Superintendent of Regional Engineering,
Engineering Supervisors and Engineering Planning Technologists in each of the
Company’s three operating regions.
2.0
Criteria
Newfoundland Power’s distribution planning criteria align with the Distribution
Planner’s Manual published by the Canadian Electricity Association (“CEA”) and consist
of the following system constraint factors; (i) ampacity, (ii) short circuit capacity, (iii)
voltage and power quality and (iv) reliability.
Newfoundland Power
Requests for Information
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
PUB-NP-157
Supply Issues and Power Outages
on the Island Interconnected System
Page 2 of 3
Ampacity
Ampacities, or thermal loading limits, are determined for the three major system
components:
 Transformers (substation transformers, voltage regulators and step-downs)
 Conductor and Cable (bare aerial conductors, aerial cables and underground
cable)
 Breakers and Switches (breakers, reclosers, air switches and underground
switches)
Different philosophies are used to determine ampacity ratings for each group from which
a planning ampacity is derived. The planning ampacity is the maximum peak load
permitted on a system component during normal operating conditions. It is recognized
that under emergency or abnormal conditions, system components may be operated
above the planning ampacity.
Short Circuit Capacity
The maximum clearing time of protection devices for a given fault level must be less than
the short circuit withstand capability of any system component exposed to that fault. To
address situations where it is determined that this is not the case, either equipment or
plant with greater short circuit withstand capability is installed, or the fault level is
reduced.
Voltage and Power Quality
Canadian Standards Association (“CSA”) Standard C235 defines the preferred voltage
levels on a 120V base for normal and extreme operating conditions. For planning
purposes, action is to be initiated when voltage limits for normal operating conditions are
violated. CYMDIST distribution feeder modelling software is used for distribution
system voltage planning, and field measurements are obtained to confirm any inadequate
line voltages identified in the modelling software.
Power quality issues such as voltage flicker, voltage unbalance, harmonics, and high
frequency noise are also analyzed and addressed as required when concerns are
identified.
Reliability
The consistent application of Newfoundland Power’s distribution planning activities and
processes help to ensure its customers receive a cost-effective, uniform and high standard
of electrical service throughout the Company’s service territory. Distribution planning
continuously monitors issues that could have a negative impact on service reliability.
Newfoundland Power
Requests for Information
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
PUB-NP-157
Supply Issues and Power Outages
on the Island Interconnected System
Page 3 of 3
Some of these issues are cold load pickup, adequate feeder sectionalizing, feeder backup
and contingency plans, and fault isolation/fuse coordination.
3.0
Technical Options and Alternatives
The following is a list of some technical options and alternatives which are used as
components for developing distribution plans to address identified or forecast system
constraints:














Reconfiguration using permanent load transfers
Convert to a higher voltage
Reconductor
Add voltage regulator
Add sectionalizing switch
Add capacitors
Add extra phases
Upgrade neutral conductor
Upgrade insulation for salt contamination
Upgrade underground cable
Upgrade recloser to breaker
Add substation transformer
Add feeder
Add substation
Newfoundland Power