Download Texas Nodal Detailled Market Trials Planning Process 30 January

Survey
yes no Was this document useful for you?
   Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Document related concepts

Flow conditioning wikipedia , lookup

Transcript
GENMAP Registration
Workshop
Jan 14, 2010
http://nodal.ercot.com
1
Antitrust Admonition
ANTITRUST ADMONITION
ERCOT strictly prohibits Market Participants and their employees who are
participating in ERCOT activities from using their participation in ERCOT activities
as a forum for engaging in practices or communications that violate the antitrust
laws. The ERCOT Board has approved guidelines for members of ERCOT
Committees, Subcommittees and Working Groups to be reviewed and followed by
each Market Participant attending ERCOT meetings. If you have not received a
copy of these Guidelines, copies are available at the Client Relations desk. Please
remember your ongoing obligation to comply with all applicable laws, including the
antitrust laws.
DISCLAIMER
All presentations and materials submitted by Market Participants or any other Entity
to ERCOT staff for this meeting are received and posted with the acknowledgement
that the information will be considered public in accordance with the ERCOT
Websites Content Management Operating Procedure.
http://nodal.ercot.com
2
Agenda
•
Antitrust Admonition
•
RARF Updates
•
MP11 Timelines
•
GENMAP Processing
•
GENMAP Samples
•
General info
•
Q&A / Open Forum
ERCOT asks that you log into the WebEx using your company name then
your name. This will allow us to take roll call offline. If you have not
logged in with your company name, please use the WebEx chat to tell the
host your company is represented
http://nodal.ercot.com
3
Updates and Progress
• RARF Transmission Data Collection ended 12/01/2009
– 203 total RARF sites
– 195 Accepted
– 8 sites Incomplete
– 60 sites missing PSSE data
(Contact [email protected] if having issues)
– Resource Readiness Scorecard posted
http://nodal.ercot.com/readiness/scorecard/index.html
http://nodal.ercot.com
4
GENMAP OVERVIEW
Identifying Resource Nodes – Key Reasons for Modeling Accuracy
Network Operations Model
– Annual/Monthly CRR Auctions.
– MMS and EMS commercial and operations.
DAM Clearing and Settlements
– CRR offers and bids and offers.
– DAM Resource-Specific Energy offers
– DAM Energy Only offers.
– DAM Energy bids
5
GENMAP OVERVIEW
Identifying Resource Nodes – Key Reasons for Modeling Accuracy
RTM Clearing and Settlements
– Dispatch and Pricing.
– Pricing for RTM settlement at Resource Node.
– Pricing at EPS Meters for Production Settlement
6
GENMAP Processing
•Resource Node mapping is per Procedure for Identifying
Resource Nodes (July 23, 2008)
http://nodal.ercot.com/mktrules/np/index.html
•Nodal procedure allows 5 business days to turn GENMAP
package around
•10 business days per MP11
•MP11 Metric applies to GENMAP, DME, RARF, and RARF TrueUp
http://nodal.ercot.com
7
GENMAP Processing
http://nodal.ercot.com
8
Updates and Progress
2010
DEC
JAN
FEB
MAR
APR
MP11 - RARF Transmission Data
(June 15 thru Dec 1, 2009)
MP11 – DME Declarations
(Dec 7 through January 8)
MP11 - GENMAP Verifications
(January 18 thru April 1)
MP11 - RARF True-up
(February 1 thru April 1)
Nodal Market Go-Live
(December 1, 2010)
http://nodal.ercot.com
9
MAY
JUN
JUL
AUG
SEP
OCT
NOV
DEC
GENMAP Package
http://nodal.ercot.com
10
GENMAP Sample one-line
SAMPLE GENMAP ONE-LINE
Test_Line1
Test_Line2
Test_Line3
TEST_TESTUNIT2
Dsw_1231
TEST_TESTUNIT3
TEST_TESTUNIT1
1220
1210
Dsw_S1
http://nodal.ercot.com
Dsw_G2
Dsw_G3
11
GENMAP Unit-Associated Spreadsheets
http://nodal.ercot.com
12
GENMAP Non Unit-Associated Spreadsheets
http://nodal.ercot.com
13
GENMAP Defined
GENMAP Packet Defined
Unit and Associated Resource Nodes:
The GENMAP’s first page contains the mapping of generating units to Resource
Nodes, or Settlement Points. Information such as the Unit’s and Resource Node’s
substation, as well as the Resource Node’s voltage level and Connected Devices are
listed. The Connected Devices are of all of the devices at a connectivity node where
the Resource Node is located. Note that the Resource Node may not be located at
the same connectivity node as the generating unit.
Unit-Associated EPS Meters:
The Unit-Associated EPS Meters page shows the mapping of each generating unit to
one or multiple EPS Meters. Information such as the Unit and EPS Meter’s
substation, as well as the EPS Meter’s Meter ID, RID and Connected Devices are
given. The Connected Devices consist of the devices at the connectivity node(s)
where the EPS Meter is located. Note that a Unit-Associated EPS Meter may be
located at a different substation than its mapped generating unit.
Unit-Associated EPS Flow-Calculation Modeling:
The Unit-Associated EPS Meter Flow-Calculation Modeling page shows the mapping
between a Unit-Associated EPS Meter and its associated conducting equipment used
in the Flow-Calculation. Information such as the Unit and EPS Meter’s substation,
Meter ID, RID and Connected Devices are given. The Flow-Calculation’s direction at
the connected device is also given. See Explanation Verifying EPS Meter FlowCalculation Modeling below.
http://nodal.ercot.com
14
GENMAP Unit-Associated Resource Node Spreadsheet
http://nodal.ercot.com
15
GENMAP Unit-Associated EPS Meter Spreadsheet
http://nodal.ercot.com
16
GENMAP Unit-Associated EPS Flow Spreadsheet
1. EPS Flow is FALSE if it points FROM the connected device listed
2. EPS Flow is TRUE if it points TO the connected device listed
http://nodal.ercot.com
17
GENMAP Non Unit-Associated EPS Meter Spreadsheet
http://nodal.ercot.com
18
GENMAP Non Unit-Associated EPS Flow Spreadsheet
1. EPS Flow is FALSE if it points FROM the connected device listed
2. EPS Flow is TRUE if it points TO the connected device listed
http://nodal.ercot.com
19
Resource Node & Meter Mapping Verification form
http://nodal.ercot.com
20
General Info
•The one-lines are provided for two reasons – one to verify the accuracy of the meter and unit location
on the one-line; the second as a tool to verify the mapping.
•Each node and meter will have reference “Connections”. Each item listed in the connection column
will refer to all equipment electrically connected to the node or meter point. These connections are
represented as [CB]1234 or [XFMR]U1 and are shown on the one-line screenshots.
•The connections column identifies the equipment type by offsetting the type in brackets, such as
[CB]1234, where [CB] refers to the equipment type Circuit Breaker. The list below identifies the
common equipment types:
o[XFMR] Transformer
o[CB] Circuit breaker
o[DSC] Disconnect (switch)
o[UN] Generation Unit
o[LN] Line
o[LD] Load
o[SERIES] Series Device
o[SVC] Static-Var
Note: Transformer naming convention in GENMAP pkg is power transformer concatenation and may not match names
provided in the RARF.
•The one-line screenshot uses several colors to define the operating voltage of the equipment and
buses represented. The list below identifies the voltages associated with each color:
oPurple: 345kV
oGreen: 138kV
oBlue: 69kV
oPink: Other voltages
http://nodal.ercot.com
21
Contact
• For questions contact [email protected] or
your Account Manager
• You can request a private conference if necessary by sending an
email or contacting you Account Manager.
http://nodal.ercot.com
22
Q&A
http://nodal.ercot.com
23