* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Download Straw_Tracker_DCS - Indico
Audio power wikipedia , lookup
Electric power system wikipedia , lookup
Buck converter wikipedia , lookup
Electrical substation wikipedia , lookup
History of electric power transmission wikipedia , lookup
Amtrak's 25 Hz traction power system wikipedia , lookup
Distribution management system wikipedia , lookup
Power engineering wikipedia , lookup
Electrification wikipedia , lookup
Voltage optimisation wikipedia , lookup
Power over Ethernet wikipedia , lookup
Rectiverter wikipedia , lookup
Alternating current wikipedia , lookup
Distributed control system wikipedia , lookup
Standby power wikipedia , lookup
Switched-mode power supply wikipedia , lookup
Mains electricity wikipedia , lookup
S.Sergeev (JINR) Tracker consists of 4 stations of 4 views (planes) each In total ~7200 drift tubes (~450 per view) To be controlled/monitored HV system LV system Gas system Thermo-sensors Only “CERN Standard” solutions PVSS II + JCOP framework as a basement for DCS development PVSS II is a SCADA toolkit for high level control system development Visual programming (active pictures) Object-oriented (data point) encapsulation inheritance member fields Event-driven Interpretive system Events related to a change of a data point element (member field) value Language – some mixture of C, C++ and Pascal Distributed system Straw tracker needs 4 HV (2 HV?) channels per view => 64 HV channels (32 channels) Possible HV power supplies CAEN HV modules If A1832 – 12 channels, 6KV, 1 mA or A1535 – 24 channels, 3.5 KV, 1 mA CAEN mainframe SY2527LC (up to 6 modules) Mainframe SY1527LC is used => could be shared with other sub-detectors Windows PC OPC server OPC client PVSS II Windows or Linux PC Could be single PC Ethernet TCP/IP COM/DCOM (TCP/IP) Should be used Wiener power supply Current per plain (view) ~3A Wiener MPV 4008L could be used 4 channel per module => one unit per station 0V ... 8V 5A 40W per channel 12bit control DAC, ADC <10mVpp Communication by TCP/IP, USB, CAN-bus Windows PC CAN-Bus Interface (Quasar XXXX) CAN-Bus OPC server Could be single PC OPC client PVSS II COM/DCOM (TCP/IP) Windows or Linux PC Ethernet Terminator JCOP framework + CERN Gas working group CERN Standard 2-component gas mixer For safety (working in vacuum) Up to 32 gas segments per view (???) Two electric valves per plane (station???) with 2 flow meters to cut the gas in case of broken straw + manual valves to cut off the segment with the broken straw Open questions View (plane), 60 measurements in total, 0.5C 1 temperature measurement per cover on the bottom of the PCB (to measure gas and board temp) 1 voltage measurement per cover 4 temperature measurements for mechanics. There are 28 covers/view Station 4 views 240 measurements/station (112 volt, 128 temp) 6 ELMBs Detector 4 stations 24 ELMBs total Windows PC OPC server OPC client PVSS II Windows or Linux PC Ethernet CAN-Bus Interface (Quasar XXXX) 4 stations CAN-Bus 6 ELMBs per station, 24 ELMBs in total, 4 CAN-bus branches Wiring is not clear, 8 ELMBs per station? Any detector DCS has three trees Hardware tree in terms rack-crate-boardchannel. Used for geographical addressing of infrastructure units Logical tree in terms detector-subdetectorstation-plane-channel-parameter. Used for navigation in the detector view FSM tree. Used to propagate commands from top layer to bottom layer and states from the bottom to the top. Usually it is similar to the Logical tree NA62 Root LV Voltage Tracker Current Station1 Temp. View X LV HV1 HV4 Cover1 Cover28 Temp. Voltage HV Voltage Current Temp. Ramping Trip TO Proposed states of the Straw tracker DOWN, color – BLACK. All power supplies are OFF Available command – STANDBY OFF, color – BLACK. Some power supplies are on. Available commands – STANDBY, DOWN STANDBY, color – BLUE. All LV power supplies are ON, all HV power supplies are OFF Available commands – ON, DOWN NOT_READY, color BLUE. ALL LV power supplies are ON, some HV power supplies are ON. Available commands – ON, DOWN ON, color GREEN. ALL power supplies are ON. Available commands – STANDBY, DOWN Error, color RED. Some power supplies are in TRIP state, overheating etc. Available commands – ON, STANDBY, DOWN, RESET(?) It seems reasonable at the beginning of the work to use individual Windows PC for Tracker DCS running PVSS system (UI manager, DB manager, Event manager, Distribution manager) and all OPC servers. This PC should provide access to all tracker GUIs. After the development is finished it seems to be reasonable to port Tracker DCS to common DCS PC (both PVSS panels and servers. To be confirmed) To avoid crowds at a single Central DCS PC screen we plan to run tracker GUIs (PVSS UI manager) at the tracker PCs leaving the PVSS system at the central DCS PC. To allow simple maintenance the tracker panels, functions etc. should be converted to the JCOP framework component.