Survey							
                            
		                
		                * Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Slow Controls – Calibration for MICE  The effectiveness of slow controls and calibration hardware/software and can make or break an experiment especially in the commissioning/debug phase  Issues addressed in conventional HEP experiments       HV set, ramp, and monitor (V & I) Low voltage set and monitor Gas systems – purity and flow (O2) Magnetic field (Hall, nmr probes, PS status, etc) Cryo-systems (temp, pressure, etc) Incoming beam diagnostics   Rate, profile, position, etc. Alarm watcher monitoring and displaying problems with all of the above MICE Berkeley, Oct 2002 Slow Controls – Calibration for MICE  Unconventional issues specific to MICE  Monitoring RF systems  Low level RF control interface to DAQ – Pulse to Pulse diagnostics/measurement  Radiation monitors – X-ray, electron – Instantaneous feedback regarding experiment environment  RF spark monitors – Health and well-being of RF – May have safety issue  LH operation and safety interlocks   Filling issues Interface to cooling apparatus and detector components during running MICE Berkeley, Oct 2002